Statement of Work NIAID-NOI-20-2026129.pdf
PDF 132 KB Posted
- Solicitation number
- NIAID-NOI-20-2026129
About this file
This document outlines a statement of work and related federal contract opportunity for maintenance services on imaging equipment. The National Institute of Allergy and Infectious Diseases (NIAID) intends to negotiate on a sole source basis with Philips North America LLC to provide preventative maintenance, repair, and rebuilding services for MRI, PET/CT, and SPECT/CT imaging equipment located at a BSL-4 research facility in Frederick, Maryland. The period of performance is from July 18, 2020 to July 17, 2021. Services include routine maintenance visits every three months, equipment calibrations, and repair services. Reporting requirements and quality assurance procedures are defined. The statutory authority for the sole source award is that Philips is the original equipment manufacturer and deemed necessary to maintain the proprietary equipment. Responses to the pre-solicitation notice were due by July 10, 2020.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Background:
The National Institutes of Health (NIH) has constructed and is operating a biological high-containment BSL-4 (Biological Safety Level 4) Integrated Research Facility (IRF) at Fort Detrick, Maryland to enable the National Institute of Allergy and Infectious Diseases (NIAID) researchers to track disease processes and clinical outcomes of select agents and other emerging infectious diseases.
The IRF contains BSL-2, 3, and 4 lab and support space with an advanced Imaging Core facility inside BSL-4 containment. Commissioning and operating imaging suites within the BSL-4 containment area is unprecedented. The Imaging Core is a central point of research activity at the
IRF focusing on whole-animal imaging to understand and monitor disease progression.
The Imaging Core in the BSL-4 facility contains four modalities: MRI, PET/CT, SPECT/CT, and radiography. This statement of work pertains to three modalities: MRI, PET/CT, and SPECT/CT; the radiography equipment is not included in this Statement of Work. Equipment must be isolated from the imaging specimen to prevent contamination of the system and eliminate the possibility of infecting non-protected personnel with experimental agents.
Purpose:
The purpose of this Statement of Work is to outline service requirements for imaging equipment in the NIAID IRF. The equipment systems contain both commercial and proprietary non- commercial components. The non-commercial components were provided by the original equipment manufacturer Philips Healthcare. The company designed, developed, and implemented necessary modifications to standard, commercial diagnostic imaging equipment including MRI, PET/CT and
SPECT/CT so that the equipment is capable of operating with some components of the respective devices inside BSL-4 containment. Equipment Service Requirements include the following:
Maintenance and calibration that cannot be performed outside the containment zone shall be performed either once annually (post fumigation of space) or shall be performed in compliance with the standard and special practices as described in the Centers for Disease Control and
Prevention Biosafety in Microbiological and Biomedical Laboratories (BMBL) for BSL-4 suit laboratory space: http://www.cdc.gov /biosafety/publications/bmbl5/index.htm. In accordance with the above information on this website, the Contractor is to ensure compliance and document in their required reports.
Scope and Requirements:
The contractor shall perform preventive, remedial maintenance and repair services to maintain the equipment in good working condition in accordance with the equipment manufacturer's specifications. The contractor shall provide all service reports, materials, parts, test equipment, transportation, labor, and all other related services for servicing the imaging equipment at the IRF.
The IRF imaging personnel will assist in filling of phantoms and placing phantoms on imaging tables during the scheduled preventive maintenance and assist in performing tasks related to service on the high-containment side of the imaging suites. The Contractor and the Government agree that the contractor's personnel will only access high-containment areas if the ill- functioning imaging system parts residing within the high-containment environment cannot be serviced by one of the IRF imaging staff members. Opening of a high-containment area requires performing a decontamination process and approval of entry by the Division of Occupational Health and Safety.
While the contractor's personnel are at the Government facility, the contractor shall be responsible for compliance with all the laws, rules, and regulations governing conduct at the IRF. Contractor will follow all Federal, State, and local laws related to the safety and health of personnel and property damage. Due to the security requirements imposed by the government the contractor personnel shall make appropriate arrangements for escorted entrance into IRF and into the imaging suites to perform diagnostics, preventive maintenance, and service on the equipment.
The Contractor may use its existing control process and systems that are currently in place as part of the Quality Control systems.
Quality Assurance
1) Interim approvals and testing shall include but may not be limited to:
a) Assistance by IRF staff as appropriate while the separation of containment and non-containment barrier is subjected to withstand pressure decay test.
b) Material used within the containment shall be subject to decontamination and cleaning processes with the following sprayed chemicals: Lysol, MicroChem, Clidox-S and the following gas delivered chemicals: para-formaldehyde, chloride dioxide, vaporized hydrogen peroxide (VHP), and Quat TB.
c) Factory testing and validation is required for all material to be used in the containment area.
d) In the instance of a proposed modification to the installed equipment or surrounding environment, all interim testing and validation results shall be reviewed, witnessed, and approved by the Government, its contractors, or its representatives before being used for the modification. Contractor shall provide seven (7) business days’ notice of such test.
Equipment to Be Serviced:
All of the equipment to be serviced are Philips Medical Imaging Systems:
a. Magnetic Resonance 3T Achieva, Site #532851 (Serial #17226)
b. Gemini TF (Positron Emission Tomography (PET) and Computed Tomography
Bio-containment system (CT) - Hybrid System) Site #42392378 (Serial #7010)
c. Precedence (Single Photon Emission Computed Tomography (SPECT) and Computed Tomography (CT) Bio-containment System, Site #44605002 (Serial #340090)
The additional Philips Medical Systems Workstations:
a. Magnetic Resonance Extended Workstation (EWS), Site #42392379 (Serial #10839)
b. Philips Extended Brilliance Workspaces (EBW), Site #44605005 (Serial #11634)
c. JETStream Syntegra, Site #44605003 (Serial #50007050929)
The Philips Uninterrupted Power Supply Systems:
a. Philips MR Mid-Tier System
b. Chloride 80kVA 480V 60Hz PET UPS
c. Chloride 80kVA 480V 60Hz SPECT UPS
d. 650W UPS (110/50/60Hz) JetStream UPS
Service Requirements:
Equipment quality performance assurance service as scheduled to include a general system inspection and review of system operation, calibrating the system as necessary, system lubrication and filter replacement or cleaning, completing minor operational and reliability field engineering change notices or updates, and other remedial maintenance of a non-emergency nature. The Assurance Service named above shall include, but not be limited to, Performance Assurance Checks some of which are itemized below. Contractor shall provide such planned maintenance during the Service Coverage hours (as defined below) at a time that is mutually agreed upon; and
Repair service, due to equipment malfunction, as required. Repair service includes the cost of Philips replacement parts as required on an exchange (refurbished) or new OEM part basis and labor to install Philips replacement parts. Replaced parts may be retained by the Contractor.
Routine Maintenance Schedule:
a. Service on the Magnetic Resonance 3T Achieva will be performed four (4) times a year at three-month intervals.
b. Service on the PET/CT system will be performed four (4) times a year at three-month intervals.
c. Service on the SPECT/CT system will be performed four (4) times a year at three-month intervals.
Performance Assurance Checks:
a. MRI 3T Achieva System Level Checks 3 - Months
Spurious noise test batch System Level Checks 6 - Months
Check impedance 50 Ohm QBC load Artifact Body coil (3.0T) B01 Artifact Body coil (3.0T) B02 Artifact Body coil (3.0T) B03 Artifact Body coil (3.0T) B04 Artifact Body coil (3.0T) B05 Artifact Body coil (3.0T) B06 Artifact Head coil (3.0T) H01 Artifact Head coil (3.0T) H02
Gradient System Coil 3 - Months
Check Gradient Coil Connections Magnet System 6 - Months
Water drain He vent system inside RF enclosure He vent system outside RF enclosure
System Measurements & Adjustments 3 - Months Tx att. Calibration Tune TX att. Calibration RX att. and INL calibration Max kW calibration body coil Max kW calibration TR-Head coil F0 determination RF power ref. cal. Body coil Pickup coil tripl. cal. body coil RF power ref. cal. TR-Head coil Pickup coil tr. cal TR-Head coil
System Measurements & Adjustments 6 - Months Channel Delay a& FID Shimming High order Shim Calib. for 3.0 T not XR
System Level Checks (All Visits) 3 - Months
PIQT: Periodic Image Quality Test Visual Inspection
Filter/Fans Operator Equip. Cabinet Check site conditions
System Level Checks (Visit 3, 6) 6 - Months Check Stop Function
Check Door Switch Check Helium overpressure Det.
Check Gradient Airflow Circuit Gradient Coil Temperature LCC Interlock Check Leakage Current Measurement Impedance 50 Ohm QBC Load
Check:
Gradient Switch 6 - Months Intera Gradient Switch Liquid Cooling, All Versions 3 - Months
Check of Water hoses Liquid Cooling, LCC 9896 030 13903/4 and LCC 9896 030 13913/4 3 - Months Check Coolant Level
Refrigerator: Check Compressor Pressure 3 - Months
CSW-71 Supply Pressure
Optional. Helium Level & Boil Off 3 - Months
Boil off Helium Level Check Magnet Cables 2 - Months Check magnet cables System Settings (Only Non SS Amp) 3 - Months RF Ampl. Self -Test (S23, S26 only) System Settings 3 - Months Automatic CDAS Test CDAS calibration Max kW adjustment & PMU Test Resonance Frequency Determination Power reference measurement Pickup – coil measurement (S) Operator Console/PC 3 - Months Monitor adjustment for OCD Clean the mouse (optional) Clean up disks Backup procedure Check statistical logging Configuration “As Maintained”
Operator Console/PC 6 - Months Interactive display I/T maintenance Physiology battery replacement
b. Gemini Test 3 - Months
Preparation Remove PET gantry covers Remove patient support covers Remove inbore lifter covers Open CT gantry front cover Remove CT gantry side and back covers
Safety Checks Check all of the E-stops on the system Check the gantry control panels and scan control unit Check the rotating gantry frame (CT)
CT Subsystem Gantry inspections, adjustments, and cleaning Slipring inspection and cleaning Gantry main bearing lubrication Gantry optics inspection and cleaning Collimator verification Common console cleaning Host Rack / CIRS server exterior cleaning Protective ground measurements Automatic constancy test System software checks
Gantry Power Check the battery on the console UPS Check the battery on the CIRS UPS Check the battery on the UPS for the PET and patient support
Patient Support Check fan functionality Clean the upper and lower troughs Inspect, clean / replace upper table motor belt Lubricate the vertical drive screws Lubricate the linear rails of the upper and lower pallet Lubricate the lifters of the patient support Visually inspect inside of patient support for loose parts and cable wear Verify proper motion with and without the phantom holder
Gantry Separation Unit Check the GSU drive motor Inspect, Clean/Replace GSU Drive Belt and Pulley Wipe the linear rails of the GSU
Flush the bearing blocks and re-grease Check and grease slide cover Check for loose components Verify mechanical operation and alignment
Lifter Clean vertical column Inspect sensors on vertical column
PET Gantry Clean gantry fans, VME air filter, and TFE power supply mini-fans, clean TFE 1 board, measure ACQ and PRS motherboard temperatures and fan spin rates, clean air intakes at bottom of PET gantry covers Run the monthly uniformity check View emission scans Do image alignment calibration Check PET gantry for loose components
PET System Calibrations Verify and adjust all power supplies Auto gains (final) calibration GDR Test Energy correction Coincidence timing Normalization (576 FOV) Normalization (256 FOV) LOR normalization Image alignment calibration SUV validation SUV calibration, if the validation failed
c. Precedence Test 3 - Months E-Stop CT Logger Laser (vertical and horizontal) Upper and lower pallet drive belts for wear and tension Check CT belt – main drive Poly V for wear and tension Clean the signal and power brush CT blocks Clean and inspect CT gantry optics
Check ground conduction for CT
Frame Visually inspect loose bolts, screws and nuts
Carriage Visually inspect bolts, screws and nuts – fastening hardware Check surfaces for damage or excessive wear – guides and racks
Arm Inspect ball screw Check for oil on cover of gear box Z Check surfaces for damage or excessive wear Inspect for cracks or damage to arm/carriage mounting area Inspect for cracks or damage lower and upper arm mounting Check all connection points for tightness
Detector Verify the smooth operation and check for excessive noise
Exchanger Hardware Visually inspect for loose bolts, screws or nuts on cart hardware Check detector bucket sides for wear Check collimator dog brackets for wear
Table Check upper table pallet screws
Lubrication Apply lubricant to surface and fittings
Carriage Y-Drive rack/guides
Arm Thrust bearing Linear way Ball screw
Detector Collimator locking pin Rotate bearing
Table Rails Horizontal pallet lead screws Horizontal pallet lead
CT Calibrations
Calibration: Perform phantom, air, and HCOR calibrations QA: Perform CT QA Backups: Backup CT calibrations to optical drive
SPECT Detector Tests Uncorrected intrinsic flood, center of rotation, backup SPECT validation SPECT calibration, if the validation failed
Final Clinical Tests Emission computed tomography study Total body study
Philips Uninterrupted Power Supply Systems:
Uninterrupted power supply systems shall have the batteries replaced at intervals no longer than five years after the most recent replacement, or sooner as necessary.
Batteries are not included in this service agreement.
Coverage:
Unless otherwise set forth elsewhere, Contractor will provide Customer Services Mondays through Fridays, 8:00 AM to 5:00 pm Customer local time, excluding Federal holidays ("Service Coverage").
Labor, travel, software patches and updates, and unlimited telephone technical assistance to maintain the equipment is to be included. Contractor must return all calls for service within two (2) hours and must be on-site within four (4) hours for emergency repairs.
Reporting Requirements:
NIAID and Contractor shall cooperate in defining the details required of each of the reports listed herein. Reports, documents, and manuals hereunder shall be provided in electronic format unless otherwise indicated.
Contractor shall provide the following reports to NIAID within thirty days of occurrence:
a. Minutes of any meetings relating to equipment performance or service issues.
b. Detailed reports of all service calls.
c. Validation test reports.
d. Quality and Regulatory status reports.
e. Other reasonable reports as identified.
f. Factory testing and validation is required for all material to be used in the containment area.
g. Testing, validation, and maintaining operation of peripheral accessories connected to the
Philips imaging equipment includes but not limited to ECG gating capabilities and power injectors.
h. All interim testing and validation results will be reviewed, witnessed, and approved by the Government, its contractors, or its representatives before being used for any system modification. Contractor shall provide seven (7) business days' notice of such test.
Period of Performance: Period of performance is for the period of July 18, 2020 - July 17, 2021.
File details come from the government source that posted it. Updated .