This Statement of Work (SOW) details a Multiple Indicator Monitoring (MIM) project for the Bureau of Land Management's Lewistown Field Office in Montana for 2025. The contract requires collecting riparian health data at 14 Designated Monitoring Areas (DMAs) across Fergus and Petroleum Counties, using the latest Technical Reference 1737-23 MIM protocol. The project is divided into two schedules: Schedule 1 includes 8 previously monitored DMAs, and Schedule 2 adds 6 new DMAs.
Key requirements include field surveys between June 30 and September 30, 2026, with comprehensive data collection and reporting. The contractor must have vegetation specialists with MIM training, use specific data entry and analysis modules, and obtain landowner permissions for site access. Deliverables include draft MIM data by November 30, 2026, and final reports by December 31, 2026. Payment will be made per DMA, with 50% paid upon field survey completion and the remaining 50% after BLM acceptance of the final reports. The project requires specialized equipment, including GPS-capable cameras, 4-wheel drive vehicles or UTVs/ATVs, and adherence to strict monitoring protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past_Performance_Questionnaire_0001.pdf | ||
| Sol_140L3625Q0060_Amd_0001.pdf | ||
| Sol_140L3625Q0060.pdf | ||
| WD_2015-5397_rev_25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
2025 Lewistown Multiple Indicator Monitoring
Bureau of Land Management Upper Missouri River Breaks National Monument
Lewistown Field Office
1.0 BACKGROUND
The contractor shall collect riparian health data at Designated Monitoring Areas (DMAs) in accordance with Multiple Indicator Monitoring (MIM) protocol on Bureau of Land Management administered land in
Petroleum and Fergus Counties in Montana.
The basis for the Bureau of Land Management’s (BLM) MIM protocol will use the latest version of
Technical Reference 1737-23. The 2024 version is available and should be utilized to determine adjustments to re-survey DMA’s.
The Technical Reference 1737-23 and Data Modules are available for download at:
https://www.blm.gov/documents/national-office/blm-library/technical-reference/multiple-indicator-monitoring-mim-stream
Collection and analysis of multiple indicators enables the BLM to address multiple short- and long-term indicators on the streambank and in the channel. MIM procedures measure the most important indicators relevant to detecting change, improve management efficiency through the use of electronic data collection, and yield statistically acceptable results within realistic time constraints. Data analysis within the MIM protocol addresses precision and minimizes observer variability and subjectivity through an emphasis on strict compliance with rule sets and required training. This riparian monitoring effort will produce information for standard deviation calculations that yield detection of upward or downward trends in the functioning condition of riparian zones. Trend determinations will aid the BLM’s efficacious pursuit of resource management strategies for riparian reaches across the BLM’s Lewistown Field Office.
The DMA is the location on the stream where all monitoring procedures described in the MIM protocol occur. All DMAs that will be used for monitoring within this contract have been delineated by the BLM, have been previously surveyed, and can be found in Appendix A and B. Some of the DMA reaches specified in this contract are only accessible through private property and will require landowner permission to be obtained. See the Reference Material and the Requirements sections below for protocol and methodologies for data collection.
Only some sites can be accessed by pick-up truck. ATVs or UTVs could be used to access all sites to within 1 mile, many are much closer. Use of these vehicles may be a preferred access method for some contractors. Conditions of two-track routes described as potential access routes in Appendix A are not guaranteed to be accessible by a full-sized vehicle. Most hiking distances are less than 1 mile of roads or of potential two-track access routes.
2.0 QUALIFICATION AND EXPERIENCE REQUIREMENTS
Offerors shall submit a one-page resume of all key personnel proposed for this contract. The following positions have been determined as key personnel: the project manager, and a field crew made up of a minimum of two personnel including a field crew lead.
The project manager must have experience equal to the field staff, and in addition, should have experience reviewing monitoring data for quality control, coordinating with agency personnel, and producing deliverables similar to those specified in this contract. The project manager may serve as the field crew lead if they are on site during data collection.
https://www.blm.gov/documents/national-office/blm-library/technical-reference/multiple-indicator-monitoring-mim-stream https://www.blm.gov/documents/national-office/blm-library/technical-reference/multiple-indicator-monitoring-mim-stream
At a minimum the field crew must have two vegetation specialists OR a vegetation specialist and water resource specialist. The field crew lead will have a 4-year Bachelor of Science (B.S.) Natural Resources /
Environment degree with 3 years of professional experience in related field data collection and analysis, or a graduate degree with 2 years of professional experience in related field data collection and analysis.
The field crew lead will have a strong technical background and experience collecting, analyzing, and interpreting quantitative data related to the assessment items specific to vegetation monitoring.
All field crew members must have formal training for MIM. Formal training for MIM must include a certificate of completion from a full 3-day course in Riparian MIM or proof of journey level experience conducting MIM in multiple areas. Field staff must be skilled in the production and use of GPS data, digital forms, and maps. The staff conducting field work and analysis must be sufficiently versed in plant identification, measuring channel morphology, natural resource inventorying, and correct application of natural resource monitoring protocols (e.g., MIM of Stream Channels and Streamside Vegetation). It is highly preferred that field crew members have experience in the types of watersheds being assessed
(Northern Rocky Mountain Montane Forest and Shrubland/Grassland and Inter-Mountain Sagebrush
Steppe vegetation types, etc.).
The contractor shall make no substitutions of key personnel specified in the contractor’s offer unless the substitution is necessitated by illness, death, or termination of employment. The contractor shall notify the
Contracting Officer at least 15 days prior to making any permanent team member substitutions. The contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the person(s) being replaced. The Contracting Officer will notify the contractor of approval/denial within 15 calendar days after receipt of all required information of the decision on substitutions. If the Contracting
Officer determines that the proposed substitute personnel are unacceptable, or that there could be a reduction of effort so substantial as to impair the success of this contracting effort, the contractor may be subject to default action.
3.0 PAST PERFORMANCE
Offerors shall submit a list of clients for past and present similar projects covering the past three (3) years.
Provide: contact name, address, phone number, e-mail address. The Government may survey these clients to obtain past performance information (quality, timeliness, cost control, business relationships) related to
Offerors current and past work.
4.0 REFERENCE MATERIALS
1. Riparian area management: Multiple indicator monitoring (MIM) of stream channels and streamside vegetation. Technical Reference 1737-23. For the latest version, see https://www.blm.gov/documents/national-office/blm-library/technical-reference/multiple-indicator-monitoring-mim-stream
2. Data Entry and Data Analysis Modules are available online (must use the latest version).
https://www.blm.gov/documents/national-office/blm-library/technical-reference/multiple-indicator-monitoring-mim-stream https://www.blm.gov/documents/national-office/blm-library/technical-reference/multiple-indicator-monitoring-mim-stream
5.0 REQUIREMENTS
5.1 TASKS/SCHEDULES
I. Schedule 1 – Base requirement DMAs.
The Priority 1 DMAs consist of eight (8) previously monitored DMAs. See specific requirements for tasks stated below in the corresponding Requirements section.
A. Complete application of Technical Reference 1737-23 at eight (8)) DMA in Fergus
County. See Appendix A for list of DMAs and locations.
B. The field work and reporting must be completed by the timelines detailed in section 5.0
Deliverables.
II. Schedule 2 – Base requirement DMAs AND Priority 2 DMAs.
Priority 2 DMAs would be included in addition to the Base requirement DMAs. Priority 2 DMAs consist of an additional six (6) new DMAs in Fergus and Petroleum Counties.
A. Complete application of Technical Reference 1737-23 at fourteen (14) DMAs in Fergus and Petroleum Counties. See Appendix A.
B. The field work and reporting must be completed by the timelines detailed in section 5.0
Deliverables.
5.2 REQUIREMENTS FOR MIM of BASE REQUIREMENT and PRIORITY 2 DMAs
I. For all DMAs, find access routes to each monitoring point (Appendix A). Notify private landowners/grazing lessees when you will be conducting the assessments to gain access across private land if applicable.
II. For DMAs outlined in Appendix A, GPS coordinates for the upper and lower ends have been provided to assist field crews in re-locating the monitoring reaches. The coordinates for the re-survey DMAs are based off of the older 110 meter reach.
A. Define the Lower and Upper end of the DMA.
The DMA shall be at least 110 m long or adjusted in accordance with the direction from to the latest version of the Technical Reference 1737-23 and utilizing the upstream and downstream Latitude and Longitude provided in Appendix A. When originally installed, most (but not all) of the DMAs had Reference Point markers installed using orange plastic monument marker or green t-post. These may still be in place for assisting in re-locating the DMAs.
B. Take Photographs
i. After the Lower and Upper Ends of the DMA have been documented, photographs should be taken before data is collected because the monitoring process may result in some visible disturbance to the site. At a minimum, nine
(9) photographs shall be taken:
a) From the lower marker looking upstream
b) From the lower marker looking across the stream (perpendicular)
c) From the lower marker looking downstream
d) Across the stream from the lower marker, looking toward the lower marker
(perpendicular)
e) From the upper marker looking upstream
f) From the upper marker looking across the stream (perpendicular)
g) From the upper marker looking downstream
h) Across the stream from the upper marker, looking toward the upper marker
(perpendicular).
i) If the Reference Marker is still in place: Looking at the Reference Marker, taken in a way that the photograph helps future crews located it (ie background has easily identifiable features).
ii. Take additional photographs as needed and describe the location of each photo in relation to the downstream marker.
iii. Photography metadata information will be completed after the photographs have been downloaded from the camera:
a) Title Field (Required) : Descriptive title of what the picture portrays
b) Author Field (Required) : Photographer Name or Company
c) Comments Field (Optional) : Any other relevant information
C. Identify and Record the Timing of MIM in Relation to Grazing. This will be documented in the Header tab under the Narrative section of the Data Entry and Data
Analysis modules.
- Pre-grazing Monitoring
- Monitoring During Grazing
- Post-grazing Monitoring
D. Follow Monitoring Guidelines and General Procedures
i. Bed material sampling (substrate) and Residual Pool Depth and Pool Frequency will NOT be conducted on the following DMAs (See summary table in
Appendix A):
Schedule 1 – Base Requirement DMAs
AC02013-1, Armells Creek
BY02609-1, Brickyard Creek
DC15124-4, Dog Creek
DC15124-10, Dog Creek
JR20051-1, Judith River
Schedule 2 – Priority 2 DMAs
DC15013-1, Drag Creek
DC15052-2, Drag Creek
MH04894-1, McDonald Creek Trib
MC09703-1, Melton Coulee
SC02559-1, Soda Creek
ii. Residual Pool Depth and Pool Frequency will be completed ONLY on the following DMAs (See summary table in Appendix A):
Schedule 1 – Base Requirement DMAs
FC12601-1, Fords Creek
FC12601-2, Fords Creek
FC12700-1, Fords Creek
Schedule 2 – Priority 2 DMAs
CC09683-1, Coffee Creek
iii. Bed material sampling (substrate) will be completed ONLY on the following
DMAs (See summary table in Appendix A):
CC09683-1, Coffee Creek
E. Use the MIM Modules
i. The Data Entry Module is for entering data into handheld computers using Windows
Mobile in the field.
a) A brief narrative that describes the DMA, its type, and location will be included in the “Header” tab under the Narrative section.
b) Timelines for delivery of the draft and final Data Entry Modules are detailed in
Section 6.0 Deliverables.
ii. The Data Analysis Module will be completed using data collected in the Data Entry
Module.
a) Timelines for delivery of the draft and final Data Analysis Modules are detailed in Section 6.0 Deliverables.
F. Flooded Greenline
If monitoring of the greenline is not possible under the MIM protocol due to flooded conditions, the site would be evaluated at a later date under this contract. Deliverable due date alterations would be made in consideration of any constraints that seasonal flooding may impose.
G. Additional Notes and Comments Can be Obtained in the Field
i. Notes and comments could include any observations and other pertinent information not included on the forms such as observed wildlife, apparent unauthorized disturbance, and/or other unique conditions and findings. These should be documented in the Comments tab of the MIM Modules.
ii. Note if milkweed is observed in the riparian area, and which species if identifiable.
6.0 DELIVERABLES
Data Disclaimer Message - Any records (photographs, data, notes, etc.) generated and/or created for the purposes of this contract are owned by the BLM and require review and permission prior to release of any information. The contractor cannot copyright, sell, release, or reproduce any of this material. Images will not be protected from release through Freedom of Information Act requests.
1. Field Surveys
All field surveys will be completed between a June 30 to September 30 field window. Surveys must be completed no later than September 30, 2026.
2. Draft MIM data
All draft MIM data will be completed and submitted for review to the BLM by November 30, 2026. Submit one (1) complete set of all data on a USB memory device. All Data Entry and Data
Analysis modules and photographs shall be submitted in an electronic format that is compatible with BLM systems. Maps of the monitoring configurations at a 1:1,000 scale with WGS 1984 can be formatted and delivered as either a PDF or JPEG.
3. Final Reports
The final report(s) will consist of the corrected Data Entry and Data Analysis modules, photographs, and maps. Submit one (1) complete set of all data on a USB memory device. All
Data Entry modules, Data Analysis modules, and photographs shall be submitted in an electronic format that is compatible with BLM systems. Maps of the monitoring configurations at a 1:1,000 scale with WGS 1984 can be formatted and delivered as either a PDF or JPEG.
A. The final report for data will be submitted to the BLM by December 31, 2026.
7.0 GOVERNMENT FURNISHED PROPERTY
1. Hard copy and/or digital versions of maps and previous survey information will be provided to the contractor.
2. Permittee/landowner contact information will be provided in order to aid with acquiring access to
DMAs which require private landowner permission. This information is NOT public, and the confidentiality of this information is to be maintained.
3. A grazing schedule will not be provided to bidders or to the contractor; the timing of MIM in relation to grazing will be recorded by the contractor as observed in the field at the time of survey, as outlined under 5.2.II.C of the Requirements section of this document.
8.0 CONTRACTOR FURNISHED PROPERTY
1. The contractor is responsible for obtaining landowner permission and acquiring legal access to all
BLM parcels and stream reaches. Contractor should be prepared for hiking and driving in rough terrain, hot and cold temperature extremes, rattlesnakes, etc..
2. 8 megapixel or greater camera with geo-reference capability. If a tablet or similar device is used, verify resolution settings are correct.
3. Equipment, tools, materials, supervision, and other items needed to complete the field work protocols outlined in the requirements section above.
4. 4-wheel drive vehicle or UTV/ATV for transportation. The contractor will be responsible for making sure all vehicles, 4 wheelers, or UTV’s are washed regularly to reduce the spread of noxious weed seeds.
5. The contractor will be responsible for carrying necessary fire extinguishers and any other safety/ first aide equipment.
9.0 TELECONFERENCES AND CORRESPNDANCE
1. An initial pre-work teleconference will occur after award of the contract.
2. Other “as-needed” teleconferences, phone calls, or email correspondence with BLM shall be conducted whenever requested by the COR or the contractor in which questions relating to the project need to be discussed.
10.0 PAYMENT
Payment shall be made in accordance with the contract requirements at the price per DMA (with supporting forms, photographs, and maps completed). Measurement for payment will be based on completed, reviewed and accepted products by the COR. Invoices can be submitted following the timelines and deliverables outlined in Section 6.0 Deliverables.
Fifty percent of the payment per DMA will be paid upon completion of the field surveys and when list of completed sites is provided to the COR. This is intended to document that the survey is complete for the various reaches.
The remaining 50% will be paid after BLM acceptance of the final report(s).
Appendix A Site Information
DMA Site Information
Schedule Stream Name County DMA I.D. Allotment Original
Survey
Special
Monitoring
Criteria
S ch ed u le
Armells Creek Fergus AC02013_1 West Indian Butte 2019
Brickyard Creek Fergus BY02609_1 Little Box Elder 2021
Dog Creek (lower) Fergus
DC15124-
Dog Creek 2018
Dog Creek (lower) Fergus DC15124-4 Dog Creek 2018
Fords Creek Fergus FC12601_1 Little Dam 2018 pool
Fords Creek Fergus FC12601_2 Little Dam 2021 pool
Fords Creek Fergus FC12700_1 Forgy Common 2021 pool
Judith River Fergus JR20051_1 Judith River Ranch 2017
S ch ed u le
Coffee Creek Fergus CC09683-1 Coffee Creek new pool, substrate
Drag Creek Petroleum DC15052-2 Two Crow new
Drag Creek Petroleum DC15013-1 Drag Creek new
Melton Coulee Fergus MC09703-1 Melton Coulee new
McDonald Creek Trib Petroleum MH04894_1 Marsh Hawk new
Soda Creek Petroleum SC02559-1 Soda Creek new
Schedule 1 DMA’s:
AC02013-1
Drainage: Armells Creek
Location: T21N, R22E, Sec 24
Allotment Name: West Indian Butte (#02013)
HUC12: Sourdough Creek – Armells Creek (100401040504)
Upstream: 47.58098, -108.84482
Downstream: 47.58124, -108.84327
Comments: Originally assessed in 2019.
Access: Will require access through along old two track that is very rough and may be difficult without
UTV/ATV. Access will also require cross country travel approximately 1.5 miles.
BY02609-1
Drainage: Brickyard Creek
Location: T16N, R23E, Sec 17
Allotment Name: Little Box Elder (#02609)
HUC12: Brickyard (100402040304)
Upstream: 47.156589, -108.8321860
Downstream: 47.156106, -108.831714
Comments: Originally assessed in 2021. DMA upland marker is a green t-post.
Access: Access is a gravel road, Box Elder Road/Fox Lane. Hike is less than 0.1 mile.
DC15124-4
Drainage: Dog Creek
Location: T22N, R17E, Sec 06
Allotment Name: Dog Creek (#15124)
HUC12: Jones Cone- Dog Creek (100401010508)
Upstream: 47.706030, -109.5926610
Downstream: 47.706826, -109.593527
Comments: Originally assessed in 2018. No upland marker.
Access: Will require access through private (American Prairie). Access requires multiple miles along old two track is very rough and may be difficult at stream crossings depending on spring flows so a
UTV/ATV recommended.
DC15124-10
Drainage: Dog Creek
Location: T22N, R17E, Sec 09
Allotment Name: Dog Creek (#15124)
HUC12: Jones Cone- Dog Creek (100401010508)
Upstream: 47.685048, -109.5593120
Downstream: 47.685924, -109.559776
Comments: Originally assessed in 2018. No upland marker.
Access: Will require access through private (American Prairie). Access requires multiple miles along old two track is very rough and may be difficult at stream crossings depending on spring flows so a
UTV/ATV recommended.
FC12601-1
Drainage: Fords Creek
Location: T16N, R22E, Sec 25
Allotment Name: Little Dam (#12601)
HUC12: Middle Fords Creek (100402040303)
Upstream: 47.118322, -108.868700
Downstream: 47.119112, -108.868215
Comments: DMA was established and last surveyed in 2018.
Access: Easiest route is from the west through private and would require less than 0.1 mile hike.
However, if access is not able to be obtained, there is a two-track route from the northeast through BLM.
FC12601-2
Location: T16N, R22E, Sec 26
Allotment Name: Little Dam (#12601)
HUC12: Middle Fords Creek (100402040303)
Upstream: 47.119255, -108.889297
Downstream: 47.119752, -108.888330
Comments: DMA was established and last surveyed in 2021.
However, if access is not able to be obtained, there is a two-track route from the northeast through BLM.
FC12700-1
Location: T16N, R23E, Sec 30
Allotment Name: Forgy Common (#12700)
HUC12: Middle Fords Creek (100402040303)
Upstream: 47.113608, -108.844722
Downstream: 47.113919, -108.844069
Comments: DMA was established and last surveyed in 2021
However, if access is not able to be obtained, there is a two-track route from the northeast through BLM.
JR20051-1
Drainage: Judith River
Location: T20N, R17E, Sec 17 and 20
Allotment Name: Judith River Ranch (#20051)
HUC12: Fivemile Coulee – Judith River (100401031406)
Upstream: 47.492319, -109.586011
Downstream: 47.493816, -109.584802
Comments: DMA was established and last surveyed in 2017.
Access: Access off Threemile Road. Private landowner permission required for a 1 mile hike. Site can also be accessed via a very steep two track only suitable for use by ATV or UTV with care but minimal hike. Third access option is from the west but would require private landowner permission and wading the river.
Schedule 2 DMA’s:
CC09683-1
Drainage: Coffee Creek
Location: T20N, R15E, Sec 05
Allotment Name: Coffee Creek (#09683)
HUC12: Lower Coffee Creek (100401020304)
Upstream: 47.530920, -108.837642
Downstream: 47.531386, -109.836729
Comments: New DMA
Access: Will require access through private (Jeff Schafer). Access requires multiple miles along a rough two track is too narrow and steep for a truck so a UTV/ATV is required.
DC15013-1
Drainage: Drag Creek
Location: T19N, R28E, Sec 26
Allotment Name: Drag Creek (#15013)
HUC12: Drag Creek (100402050802)
Upstream: 47.376996, -108.105581
Downstream: 47.376111, -108.105711
Comments: New DMA.
Access: Will require access along an old two-track so UTV/ATV recommended or cross country travel about 1.5 miles.
DC15052-2
Drainage: Drag Creek
Location: T19N, R28E, Sec 27
Allotment Name: Two Crow (#15052)
HUC12: Drag Creek (100402050802)
Upstream: 47.385355, -108.122654
Downstream: 47.3846541, -108.122149
Comments: New DMA.
Access: Will Requires access along an old two-track so UTV/ATV recommended or cross country travel about 0.5 miles.
MC09703-1
Drainage: Melton Coulee
Location: T20N, R15E, Sec 09
Allotment Name: Melton Coulee (#09703)
HUC12: Lower Coffee Creek (100401020304)
Upstream: 47.516361, -109.818754
Downstream: 47.516525, -109.820172
Comments: New DMA.
Access: Access is along a two track only suitable for use by UTV/ATV. Cross country travel about 0.5 miles. Will require access across private (Jeff Schafer).
MH04894-1
Drainage: Unnamed McDonald Creek Tributary
Location: T14N, R25E, Sec 02 and 11
Allotment Name: Marsh Hawk (#04894)
HUC12: Whites Coulee-McDonald Creek (100402040603)
Upstream: 46.995883, -108.513307
Downstream: 46.996128, -108.512082
Comments: New DMA.
Access: Cross country travel about 0.5 miles. Will require access across private (Nick Shultz).
SC02559-1
Drainage: Soda Creek
Location: T21N, R29E, Sec 30
Allotment Name: Soda Creek (#02559)
HUC12: Soda Creek (100401041106)
Upstream: 47.550409, -108.049204
Downstream: 47.550361, 108.0479676
Comments: New DMA.
Access: Cross country travel about 0.75 miles. Will require access across private (Soda Creek Permittee:
5 Mountain Ranch LLC)