Statement of Work MARIA BRAY.docx

DOCX document 13 KB Posted

Attached to
CGC ABBIE BURGESS HEAT PUMP#5 SERVICE
Solicitation number
70Z08521QP45F8400
Issued by

View the file

Other files

File Type Posted
175-WLM_516_4_1_-_A.pdf PDF
Updated clause 77K to 150K.DOCX DOCX document
175-WLM_512_12_1_-_D.pdf PDF
175-WLM_516_1_1_-_F.pdf PDF
175-WLM_512_1_1_-_E.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work MARIA BRAY Heat Pump #5

IAW Configuration Vendor shall;

· Supply all straight cooling parts to build in place new SCSC5.

· Supply the necessary labor and materials to install the new components

· Have new supply and return duct connections made and installed,

· Supply a new sea water manifold$ 4,675.00

· Supply and install new sea water switch, sea water hoses and relief hoses

· Modify sea water and drain lines as necessary

· Hire a marine chemist to certify the work space

USCG will;

· Carry on or remove all components in and out of the work space, wiring, and painting.

· Remove the old unit down to the steel plate. Existing unit plate stays but is grinded down of all high spots and painted prior to Vendor's arrival. Plate must be flat from all frames and supports.