Statement of Work MARIA BRAY.docx
DOCX document 13 KB Posted
- Attached to
- CGC ABBIE BURGESS HEAT PUMP#5 SERVICE
- Solicitation number
- 70Z08521QP45F8400
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 175-WLM_516_4_1_-_A.pdf | ||
| Updated clause 77K to 150K.DOCX | DOCX document | |
| 175-WLM_512_12_1_-_D.pdf | ||
| 175-WLM_516_1_1_-_F.pdf | ||
| 175-WLM_512_1_1_-_E.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work MARIA BRAY Heat Pump #5
IAW Configuration Vendor shall;
· Supply all straight cooling parts to build in place new SCSC5.
· Supply the necessary labor and materials to install the new components
· Have new supply and return duct connections made and installed,
· Supply a new sea water manifold$ 4,675.00
· Supply and install new sea water switch, sea water hoses and relief hoses
· Modify sea water and drain lines as necessary
· Hire a marine chemist to certify the work space
USCG will;
· Carry on or remove all components in and out of the work space, wiring, and painting.
· Remove the old unit down to the steel plate. Existing unit plate stays but is grinded down of all high spots and painted prior to Vendor's arrival. Plate must be flat from all frames and supports.
File details come from the government source that posted it. Updated .