STATEMENT OF WORK
GENERAL INFORMATION: Target vessels to conduct Day/Night underway South Bay and offshore 3-5 Nautical Miles, At-Sea Hook & Climb, Close Quarters Combat tactics with Simmunitions scenarios.
Title of Project: USCG MSRT West Day/Night At-Sea BAF 101, Hook & Climb Insertion, CQC & CBRNE Mission Profile
Contractor’s specifications:
Vessel must be at least 120’ feet in length Vessel must have at least a 12 foot by 12 foot open area deck space Vessel must have a minimum of 15 feet of freeboard for hook and climb maneuvers Vessel must be capable to transit a minimum of 10 nautical miles off shore.
The area above the deck space will be free of superstructures, antenna or other obstacles to minimize risk to both the aircraft and the assault team A flat freeboard that presents no obstruction to the climbers is required No lips or protrusions from the hull that run the length of the ship The vessel must be able to accommodate approximately 35 passengers who will serve as safety observers, evaluators and other required training positions.
Vessel must have multiple internal spaces capable of being configured to resemble a Passenger ferry.
Vessel must have at a minimum the following interior spaces: Bridge, Engine Room, Machinery Room, and Passenger Seating similar to a Ferry
Supporting Information:
The Coast Guard Team will deploy members alongside via small boat to hook a ladder and climb up the side of the vessel.
Protrusions or lips that run the length of the hull would result in hook and climb on the vessel being impractical and unsafe to climbers.
Allow CG Members full access to the ship to facility realistic Team Movement Allow use of Simmunitions in most spaces within the interior and exterior of the VSL.
Delivery Requirements:
RDD: March 23rd, 2022 (Admiral Hornblower Underway in the South Bay)
Times: 1000-1500 (5 Hours)
San Diego, CA. 03/23/2022
RDD: March 24th, 2022 (Adventure Hornblower Underway in the South Bay)
Times: 1430-1930 (5 Hours)
San Diego, CA. 03/24/2022
RDD: March 25th, 2022 (Adventure Hornblower Underway in the South Bay)
Times: 1000-1500 (5 Hours)
San Diego, CA. 03/25/2022
RDD: March 28th, 2022 (Admiral Hornblower Underway in the South Bay)
Times: 1800-2300 (5 Hours)
San Diego, CA. 03/28/2022
RDD: March 29th, 2022 (Admiral Hornblower Underway in the South Bay)
Times: 1800-2300 (5 Hours)
San Diego, CA. 03/39/2022