Statement of Work - Light Aircraft Hangar Electrical Mods v2.2.docx
DOCX document 15 KB Posted
- Solicitation number
- NMAN2200-21-01774
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COVID SPE Message for Onsite Contractors.pdf | ||
| COVID Certification of Vaccination.pdf | ||
| Wage Determination FL20210082.pdf | ||
| Provisions and Clauses.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Need Aircraft Hangar Electrical Modifications and Additions For NOAA Aircraft Operations Center, 3450 Flightline Drive, Lakeland, FL 33811
NM-AN2200-21-01774
SCOPE OF WORK:
- Furnish and install two (2) new 20A commercial quad-outlets at designated locations.
- Furnish and install eight (8) new 20A commercial quad-outlets to replace existing GFCI outlets at designated locations.
- Furnish and install one (1) pressure washer circuit at the designated location.
- Furnish and install three (3) dedicated “Dryer” style circuits, complete with box, device, and up-wiring.
- Demolish and remove two (2) GFCI outlets and furnish and install new 20A outlets with cover at designated locations.
- Install six (6) 208V 100A Pin and Sleeve boxes and connectors at designated locations.
- Install one (1) open/close/stop switch for the north roll-up door opposite the existing switch at the designated location.
- Install one (1) open/close/stop switch for the west roll-up door.
*Note - All designated locations provided upon contractor arrival.
CONTRACTOR SHALL:
- Be licensed, bonded, insured, and covered by workman’s compensation for the State of Florida
- Provide their own transportation, parts, tools, equipment, and supplies.
- Be responsible for any and all permits, (financially and administratively)
- Maintain their work area in a clean and sanitary condition with all trash and debris removed at the end of the work day
- Abide by all Federal Government mask mandates.
- Warranty all parts, work, and installations for a period of 1 year after the completion of work.
- Comply with Occupational Safety and Health Administration (OSHA), National Electrical Manufacturers Association (NEMA), National Electrical Code (NEC), and the National Fire Protection Association (NFPA) code (including any State and local codes)
- Coordinate all daily work with LT Andrew Utama prior to commencing the day’s work
AOC WILL:
- Sponsor access to NOAA spaces during normal business hours excluding Saturday, Sunday, and Federal holidays. Business hours are Monday-Friday 0630-1600 hrs
- Ensure that the expected work area is clear and provide the contractor an unobstructed work Environment.
- Ensure that approval from Lakeland Linder International Airport (NOAA AOC’s lessor) is acquired prior to contract awarding.
PERIOD OF PERFORMANCE:
The period of performance is 60 days from the issuance of the Notice to Proceed.
CONTRACT TYPE:
Firm-Fixed Price
GOVERNMENT FURNISHED EQUIPMENT:
None
POINTS OF CONTACT:
COR:
LT Andrew Utama Maintenance Support Officer B: 863-500-3886 C: 909-263-6700 Andrew.Utama@noaa.gov
Facilities:
Mr. John Harrison Support Services Chief Supply Chief, NOAA/AOC B: 863-500-3915 C: 813-244-8353 John.Harrison@noaa.gov
File details come from the government source that posted it. Updated .