STATEMENT OF WORK

DEMILITARIZATION, DISMANTLING AND REMOVAL

OF THE

HYPER VELOCITY GUN SYSTEM AND SUPPORT ITEMS

The Contractor shall provide all labor, materials and equipment to demilitarize the Hyper Velocity Gun (HVG) System by torch cutting. This includes:

1. Develop and submit for approval an Accident Prevention Plan per EM 385-1-1.

2. Remove certain branches and volunteer trees that extend into the operations area at around the HVG platform. When a proposal for the removal of specific branches and trees is finalized, obtain concurrence from NRL Environmental Code 3536.

3. Obtaining Hot Work Permit from the Naval Support Activity Fire inspector.

4. Dismantling (cut into 38-foot or less sections) of the HVG Mechanism and support parts

(including carriage, lift arms and chassis). Photos attached.

5. Breaches and barrels shall be torch cut to a degree, which renders them physically inoperable prior to removal from NRL control.

6. Cut off all protrusions from the concrete flush with the surface.

7. Recycling of all ferrous and non-ferrous metal

8. Remove, properly assign and dispose of all solid waste, hazardous waste, recyclable materials and debris throughout the area prior to, during and after activity in accordance with all applicable local, state and Federal rules

9. Reporting the total quantities of Material Recycled to NRL Environmental, Code 3536.