Statement Of Work HCC cart washer.pdf
PDF 141 KB Posted
- Attached to
- Electric Cart Washer
- Solicitation number
- 36C25725Q0715
About this file
This Statement of Work (SOW) details the requirements for removing and replacing a steam cart washer with an electric cart washer at the VA Texas Valley Coastal Bend Healthcare Center in Harlingen, TX. The project involves a turnkey installation of a new Electric Cart Washer/Disinfector with specific technical requirements, including an inclined pass-through door, performance dryer, electric heating, deionized water valve, water docking for wash carts, booster tank, reuse tank, multiple pumps, USB storage, alarm kit, and transformer.
The contractor must provide a one-year warranty, remove and dispose of the existing steam cart washer, connect the new equipment to water, air, and drain systems, and ensure compliance with Joint Commission, VA policies, and industry standards (AAMI, TJC, VA). The performance period is 8 months from contract award, with work to be completed during normal business hours (0800-1600, M-F). The contractor will have no access to VA computer systems or patient health information, and all memory storage devices will remain under VA control. The project requires coordination with the Contracting Officer's Representative (COR) and written approval for any changes to the Statement of Work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Texas Valley Coastal Bend SPS Site Visit.pdf | ||
| Texas Valley Coastal Bend SPS Site Visit.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
ELECTRIC CART WASHER, REMOVAL, INSTALL, TURN KEY, HCC-SPS
1) The general contractor and its sub-contractors shall furnish all labor, materials, supervision and all other provisions necessary to remove and replace Cart Washer located at VATVCB
HCC, 2601 Veterans Drive, Harlingen, TX 78550. Delivery and work will occur during normal business hours M-F from 0800 to 1600. Delivery/installation and all communication will be coordinated with the assigned COR.
a) The contractor must provide the following:
i) Removal/disposal of one (1) Steam Cart Washer and install Replacement of one
(1) Electric Cart Washer. Steam Cart Washer is no longer functioning and is not compatible with the infrastructure of the facility.
ii) Replacement
1. (1) Electric Cart Washer/Disinfector
2. Inclined door, Pass through
3. Loading ramp full size door
4. Performance dryer
5. Electric heated
6. Deionized/critical water DIW valve
7. Water docking for wash carts
8. Booster tank
9. (1) Reuse tank 150L
10. Detergent Pump (3)
11. Flowmeter pump 1,2,3
12. Drain cooling
13. USB storage
14. A/C in electrical enclosure
15. Drain Pan
16. Alarm kit Audible and visual to indicate cycle completion
17. Transformer for electric heat (480V/400V,80KVA
18. Universal Manifold Wash Cart
19. Lid Stand (2)
iii) Infrastructure/turnkey install
I. Removal of steam Cart Washer
II. Disposal of steam Cart washer
III. Connection to water, air, and drain
IV. Receive-unload shipment with forklift
b) Work must include the following for each device:
i) One-year warranty for parts and labor on all parts associated with installation.
ii) Removal and disposal of existing device and site cleanup
iii) Contractor shall inspect, test and verify proper operation of new equipment. Verify electric cart washer meets the requirements of all Joint Commission, VA policies, state, and/or local codes.
iv) Provide report of replacement completed.
v) Once compliance is determined...
2) Performance period: Completion 8 months upon contract award
3) All work must be done according to industry standards. Work in the facility must meet the minimum criteria for OSHA, and The Joint Commission (TJC) requirements.
4) Contractor shall ensure that the equipment functions in conformance with the latest published edition of the applicable standards, such as: AAMI, TJC, VA, etc. and the “Manufacturer's
Performance Standards/ specifications” as used when the equipment was originally procured and that any upgrades/updates shall meet or exceed the stated standards/specifications.
5) The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a kick-off meeting or has advised the contractor that a kick-off meeting is waived.
6) The contractor shall schedule with the COR in writing a minimum of thirty (30) business days in advance of the work.
7) Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.
8) Information System Officer, Information Protection: The contractor will not have access to
VA Desktop computers. They will not have access to online resources belonging to the government.
9) Privacy Officer: The Contractor will not have access to protected Patient Health Information
(PHI) nor will they have capability of accessing patient information during the services provided to the VA and if removal of equipment from the VA is required, any memory storage device will remain in VA control and will not be removed from VA custody. All research data available for Contractor analysis is de-identified.
10) Records Manager: There will not be federal records created, maintained, used or dispositioned with this contract; regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.].
| Statement of Work |
| electric Cart Washer, removal, install, turn key, hcc-sps |
File details come from the government source that posted it. Updated .