This document is a Statement of Work (SOW) that outlines the requirements and specifications for the acquisition of parts for 2 copies of the initial prototype 3U VPX FOX BOX and associated equipment by AFWERX for demonstrating mandated MOSA (Modular Open Source Architecture) edge compute capabilities on all variants of the F-35. The scope of work includes the procurement of 2 complete 3U VPX FOX BOX v1.0 units, including all internal VPX cards in the current configuration and associated parts meeting specific technical requirements. The contractor is responsible for sourcing, manufacturing, inspecting, packaging, and delivering the parts in accordance with the SOW. Quality assurance, delivery, and acceptance criteria are also detailed.
The related federal contract opportunity is a combined synopsis/solicitation for a Blanket Purchase Agreement (BPA) for the PROJECT FOXBOX requirement. This is a brand name, 100% small business set-aside, and the government is only obligated for actual purchases made under the BPA over a 5-year period. Vendors must be compliant with the latest SOSA guidelines, TEMPEST standards, and TAA-compliant. Vendors are required to submit quotes by May 24, 2024 with specific pricing and administrative information.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for Parts Acquisi�on
1. Introduc�on
This Statement of Work (SOW) outlines the requirements and specifica�ons for the acquisi�on of parts for 2 copies of the ini�al prototype 3U VPX FOX BOX and associated equipment by AFWERX for demonstra�ng mandated MOSA (Modular Open Source Architecture) edge compute capabili�es on all variants of the F-35. The overall objec�ve of Project FOX (Fast Open-X Pla�orm) is to deliver test, training, and combat capabili�es in relevant �melines to the warfighter via establishing government-controlled residency onboard fielded weapons systems.
2. Scope of Work
The scope of work includes the procurement of 2 complete 3UVPX FOX BOX v1.0 units including all internal VPX cards in the current configura�on and associated parts mee�ng the following specifica�ons:
Item 1
Descrip�on: SBC 3UVPX Card – Cur�ss Wright VPX3-1260
Quan�ty: 2
Technical Requirements: SOSA aligned I/O intensive SBC profile, SLT3-PAY-1F1F2U1TU1T1U1T-14.2.16, Intel 6-Core CPU at 2.8GHz or beter, 32GB DDR4 ECC, 480GB storage, 40G Ethernet, 1000BASE-T ethernet, PCIe x4 Gen 3, XMC expansion mezzanine with Pn6 I/O, USB 2.0/3.0, conduc�on cooled, supports Red Hat Linux, TPM 2.0
Item 2
Descrip�on: GPU 3UVPX Card – Wolf 153L
Quan�ty: 2
Technical Requirements: SOSA aligned SLT3-PAY-1F1U1S1S1U1U4F1J-14.6.13-n profile, Nvidia RTX 5000 GPU, PCIe switch, 100GbE Ethernet, 16 GB GDDR6, conduc�on cooled
Item 3
Descrip�on: Switch 3UVPX Card – ComEth 4591a
Quan�ty: 2
Technical Requirements: SOSA aligned SLT3-SWH-4F1U7U1J-14.8.7-n profile, Dual-Plane 10G/40G switch, VITA 66.5 C op�cal backplane lanes, conduc�on cooled
Item 4
Descrip�on: 1394 XMC mezzanine card – DAP FireTrac 446bT
Quan�ty: 2
Technical Requirements: MIL1394 (AS5643) host adapter, VITA 42.0 XMC form factor, min 1 ac�ve transformer-coupled 1394 port, conduc�on cooled
Item 5
Descrip�on: DAP Firespy430BT
Quan�ty: 1
Technical Requirements: Lab support hardware required to record and playback 1394 data stream in place of connec�on to actual jet for so�ware development and tes�ng. One unit on loan from DAP currently as previous equipment had surpassed end of life and no longer licensed and supportable.
Quality Standards: N/A
3. Responsibili�es
Contractor Responsibili�es: The contractor is responsible for sourcing, manufacturing (if applicable), inspec�ng, packaging, and delivering the parts in accordance with the specifica�ons outlined in this
SOW.
Agency Responsibili�es: The agency will provide necessary documenta�on, access to facili�es, and technical assistance as required to facilitate the procurement process.
4. Quality Assurance
The contractor must adhere to rigorous quality assurance procedures to ensure that all parts meet the specified requirements and standards.
Inspec�on and acceptance criteria will be determined in accordance with industry best prac�ces and agreed upon between the contractor and the agency.
5. Delivery and Acceptance
The contractor shall deliver the parts to the designated delivery loca�on as specified in the contract.
The agency will inspect the delivered parts upon receipt to ensure compliance with the specifica�ons outlined in this SOW.
Acceptance of parts will be based on the results of the inspec�on and adherence to the agreed-upon quality standards.
6. Terms and Condi�ons
The terms and condi�ons of the contract, including payment terms, warran�es, and dispute resolu�on mechanisms, will be governed by the terms outlined in the procurement agreement between the agency and the contractor.
Both par�es are expected to comply with all applicable laws, regula�ons, and industry standards throughout the dura�on of the contract.
7. Performance Metrics and Repor�ng
The contractor may be required to provide regular reports on the status of the procurement process, including order status, delivery schedules, and any devia�ons from the agreed-upon �meline or specifica�ons.
Performance metrics and repor�ng requirements will be established and communicated between the agency and the contractor.