STATEMENT OF WORK Fort Stewart GA Cardboard Baler.pdf

PDF 92 KB Posted

Attached to
Fort Stewart Georgia Cardboard Baler
Solicitation number
W9124M23Q0046
Issued by

About this file

This statement of work outlines the removal and installation of a cardboard baler at Fort Stewart, Georgia. The contractor will furnish all labor, materials, tools, equipment, supervision, and licenses to remove the existing baler, transport it from Fort Stewart, and provide the trade-in value to the U.S. Department of Treasury. The new baler will be transported to Fort Stewart and installed. The contractor must also provide training to employees on operational and safety procedures for the new baler, conveyor, and hopper, as well as certificates. The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Mission and Installation Contracting Command seeking these cardboard baler removal and installation services at Fort Stewart, Georgia.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

REMOVAL OF EXISTING CARDBOARD BALER AND INSTALLATION

OF NEW CARDBOARD BALER AT FORT STEWART, GEORGIA

Date: June 6, 2023

Scope of Work:

1. The Contractor shall furnish all labor, materials, tools, equipment, supervision, and applicable licenses and permits necessary to perform the Removal and Installation of a Cardboard Baler at Fort Stewart, Georgia. Specifically, this work will be performed at the Recycling Processing Plant in a manner that will ensure the neat, orderly, and professional appearance within Building 1384. The Contractor shall be responsible for the transportation/freight of the new equipment to Fort Stewart, Georgia. The Contractor shall be responsible for the disassemble, removal, freight, and trade-in value of the existing baler from Fort Stewart, Georgia. Trade-in value of the old baler will be remitted by check to the U.S. Department of Treasury and mailed to DPW-ENV Division, Attention Recycling Manager, 1550 Veterans Parkway, Building 1137, Fort Stewart, GA 31314-4927. If trade-in value is not feasible, the contractor shall recycle as much as possible through Fort Stewart but will remain obligated to properly dispose of any remaining (non-recyclable) materials. Contractors will ensure appropriate disposal of items in addition to ensuring all areas are clean during removal/installation and after completion. The used hydraulic oil drained from the removal of the baler may be processed through Fort Stewart for recycling.

2. The Contractor shall provide employees with training on the operational and safety procedures associated with the new Baler, Conveyer, and Hopper. The Contractor shall also provide training certificates. The contractor may include lodging, travel, and per diem associated with this project.

3. The Fort Stewart Directorate of Public Works shall conduct deenergizing and reenergizing support of electrical connections with 30 days days notice of project implementation.