Statement of Work for Ship Parts.pdf
PDF 151 KB Posted
- Solicitation number
- 1301396155
About this file
This is a Statement of Work (SOW) for material transfer and replenishment to USS THAD COCHRAN (DDG 135). USS JACK H. LUCAS (DDG 125) borrowed parts and equipment under a Part/Component Memorandum (PCM) and Memorandum of Understanding (MOU) to prevent critical delays to the Flight III Initial Operational Test and Evaluation (IOT&E) campaign. DDG 125 is now required to process requisitions to replace and repay the borrowed inventory to DDG 135. The performance period is August through September 2026, subject to hardware delivery, with installation and integration to begin immediately upon receipt of parts.
The work requires procurement and delivery of 31 line items comprising electronic components, fasteners, and materials for diode rectifier assemblies, current sensors, and cable assembly construction. Key items include diode rectifier plates and modules (items 1-9), various screws and washers (items 10-23), transducers (item 27), wire, tubing, and retainers for cable construction (items 28-30), and labor for cable assembly per specification WLMC-037076-01 (item 31). All materials must be delivered to H11 Ingalls Shipbuilding, USS THAD COCHRAN (DDG 135), 1000 Access Road, Pascagoula, MS 39567. Standard government inspection and acceptance will occur upon receipt. The technical point of contact is Mr. Duncan Mitchell at USS JACK H. LUCAS (DDG 125), and packaging shall include itemized material listings with delivery location and point of contact information.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for
Material Transfer and Replenishment for USS THAD COCHRAN (DDG 135)
1.0 Scope
To prevent critical delays to the Flight III Initial Operational Test and Evaluation (IOT&E) campaign, USS JACK H. LUCAS (DDG 125) executed a material transfer agreement with USS THAD COCHRAN (DDG 135). Under this formal Part/Component Memorandum (PCM) and Memorandum of Understanding (MOU), DDG 125 borrowed the necessary parts/equipment with a binding requirement to repay the inventory to DDG 135.
2.0 Requirements
In accordance with the agreed-upon PCM/MOU, USS JACK H. LUCAS (DDG 125) is required to process requisitions to replace and repay the following items to USS THAD
COCHRAN (DDG 135):
Items Part Number Description Qty
1 MC-038313-01 PLATE, DIODE RECTIFIER BOTTOM 1
2 MC-038311 DIODE MODULE DUAL RECTIFIER 3600V 435A 12
3 MC-038317-01 PLATE DIODE RECTIFIER FRON 1
4 MC-039472 SENSOR RDT 4-WIRE 100 OHM 40 IN LEADS 2
5 MC-038314-01 PLATE DIODE RECT INSULTING 5
6 MC-038310-01 BAR DIODE RECT CONN BUSS 8
7 MC-058948-01 FORMEX, ELECTRICAL INSULATOR AND BARRIER 1
8 MC-058540 SHIM, DIODE RECTIFIER 2
9 MC-058541 SHIM, DIODE RECTIFIER 2
10 MC-023964 SCREW BUTTON HEAD M10 X 1 5X 25MM LG ZINC PLATE 48
11 MC-035271 SCREW 25 5KT HD CAP 0.375 16 1.25 ALY STL ZINC PLTD 20
12 MC-001961 WASHER LOCK .411D 830D .10THKS STL – COTS 8
13 MC-036342 WASHER M10 NORD LOCK 10.7MM, 21MM, 2.5MM STL ZINC 24
14 MC-035765 SCREW BUTTON HEAD M10 X 1.5 X 25MM LG ZINC PLACE 24
15 MC-038197 SCREW 25 5KT HD CAP 0.375 16.1.25 5 ALY STL ZINC PLTD 4
16 MC-036339 SCREW 5KT CAP .375 – 16 1.50 LG GRS ALY STL ZINC 4
17 MC-058953 SCR, SKT HD 10-32 THD 3/8IN LG, LKG, NYL PATCH ALY STL BLK OXD 6
18 MC-006421 SCRFW SCH CAP .138(#G) -32 .750LG ALY STL ZINC 2
19 MC-006370 WASHER, FENDER, 0.203 10, 0.688 OD, O.047 H, STL ZINC PL 6
20 MC-038103 SCREW SOCKET HEAD .164, .32, .750LG 11
21 MC-038164 SCREW SOC HD .164, 32.500LG 52
22 MC-037427 SCREW SCH M6 1 16MM ALY STL ZINC 8
23 MC-035184 NUT HEX .375 – 16 ZINC PLATE 4
24 MC-042590 RECTIFIER DIODE MOUNTING PLATE 1
25 MC-038316-01 PLATE DIODE RECTIFIER TOP 1
26 MC-038312-01 PLATE DIODE RECTIFIER COLD 1
27 MC-037369 TRANSDUCER 400A CURRENT SENSOR 4-20MA OUT 12
28 MC-036106 RETAINER 4/0 LUG – COTS (TO BUILD CABLES PER WLMC-037076-01
(TABLES 123 AND 124)
29 1301-2568 WIRE, EPDM, 4/0 AWG, 7500VAC 150C (TO BUILD CABLES PER WLMC-
037076-01 (TABLES 123 AND 124)
30 30-15024 TUBING, HEAT SHRINKABLE – COTS (TO BUILD CABLES PER WLMC-
037076-01 (TABLES 123 AND 124)
31 LABOR LABOR TO ASSEMBLE CABLES, CABLES PER (TABLES 123 AND 124)
USING ITEMS 28 THRU 30
3.0 Deliverables
3.1 Delivery Location. All requested PCM parts are to be delivered to the following address:
H11 Ingalls Shipbuilding
USS THAD COCHRAN (DDG 135)
1000 Access Road Pascagoula, MS 39567
4.0 Period of Performance
August – September 2026 (subject to hardware delivery). Installation and integration will begin immediately upon receipt of parts.
5.0 Place of Performance
H11 Ingalls Shipbuilding
USS THAD COCHRAN (DDG 135)
1000 Access Road Pascagoula, MS 39567
Note: Installation of components may need to be required. See paragraph 7 for inquiries.
6.0 Government Inspection and Acceptance
Although there are no significant technical requirements (NSTR) under the new shipbuilding guidelines, all parts and equipment will undergo standard inspection upon receipt.
7.0 Technical Point of Contact
USS JACK H. LUCAS (DDG 125)
Attn: Mr. Duncan Mitchell Unit 100314
FPO AP 96693
Email: mitchell.duncan@ddg125.navy.mil
8.0 Packaging Instructions
Shall include an itemized material listing of all shipped items as well as required delivery location/point of contact information specified in paragraph 7.
mailto:mitchell.duncan@ddg125.navy.mil
File details come from the government source that posted it. Updated .