Statement of Work for Machine Gurding Risk Assessment.pdf

PDF 30 KB Posted

Attached to
Machine Guarding Risk Assessment
Solicitation number
N4033924QS036
Issued by

About this file

This document is a Statement of Work (SOW) for a Machine Guarding Risk Assessment (MGRA) to be conducted on various maintenance and repair shop equipment located at the IMA shop of FDRMC Det. Bahrain.

The SOW requires the vendor to perform MGRAs on 40 listed pieces of equipment, pursuant to applicable OSHA and ANSI/ASME standards. The vendor will provide a draft of the MGRAs within 15 business days following the site work, and FDRMC Det. Bahrain will review and confirm the accuracy within 15 business days. If revisions are necessary, the vendor will make the requested changes. This MGRA effort is part of a related federal contract opportunity, Solicitation Number N4033924QS036, issued by the Department of the Navy Naval Supply Systems Command.

View the file

Other files

File Type Posted
N4033924QS036.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. The Vendor will conduct Machine Guarding Risk Assessments (MGRA) on all maintenance and repair shop equipment listed below, located at IMA shop of FDRMC Det. Bahrain

SN Machine Name Model Manufacturer

1 Baileigh Pipe Bender M500 Baileigh

2 Edwards 60 Ton Shop Press 60T SHOP P Edwards

3 Iberdrill Drill Press Radial Floor SX-32 Iberdrill

4 Tennsmith Sheet Metal Slip Roller SR 48P Tennsmith

5 National Sheet Metal Machine - Metal Cutter U67212 National

6 Betenbender Shear 5-10GA Betenbender

7 Vertical Band Saw 360

8 Vertical Band Saw 360

9 Tennsmith Sheet Metal Cutter T36-12 Tennsmith

10 Baileigh Slip Roller SR5016 Baileigh

11 JET 3' Radial arm drill press J-720R JET

12 13" Metal Horizontal Band Saw BS-330M Baileigh

13 Monarch Turning Machine 10" Model EE Monarch

14 Jet 8" Industrial Grinder IBG-8 JET

15 Cerebrees Jeweller Lathe Cerebrees

16 Monarch Lathe Machine 1610 X54 Monarch

17 Cincinnati Horizontal Drill Press 2DT Cincinnati

18 Roper Whitney Bench Shear 125 Roper Whitney

19 Vectrax Vertical Drill Press GS-16V Vectrax

20 Jet Manual Ferrous Cold Saw CS-275 JET

21 Lomar Dogleg Assembly Machine FT1211-LM-2-4 Lomar Machine & Tool

22 Lapmaster Lapping Machine 36 Lapmaster Wolters

23 Eaton Hose Proof Test Stand FT1261 Eaton

24 Eaton Hose Proof Test Stand FT1312 Eaton

25 Marken Hose Proof Test Stand TB20K Marken

26 Omax Jet Machining 55100 Omax Corporation

27 Omega Sonic Washer Power Pro 8000 Omegasonics

28 Barbee Pop Test Stand (low Pressure) Barbee

29 Barbee Pop Test Stand (High Pressure) HP-5000-S Barbee

30 Jet 5 ton Hydraulic Press HP-5A JET

31 Metal Pro Hydraulic Punch MP4000 Metal Pro Corporation

32 Z Class Hydraulic Pump 85C-ZMS ENERPAC

33 Injector Pop Fixture J-34760A Kent Moore

34 Water Seperability Tester K39496 Koehler

35 Twin Foam Test Oil Equipment K43092 Koehler

36 Manual Embossing Machine M10 HE

CIM Card Imaging

Master

37 JET Belt and Disc Finishing Machine 414550 JET

38 Ridgid Threading Machine 1224 Ridgid

39 Piranha Punching and Shearing Machine P65 Ironworker Piranha

40 Hossfeld Universal Iron Bender Model No.2 Bender

Hossfeld Manufacturing

Co

2. MGRA will be performed pursuant with applicable Occupational Safety and Health

Administration (OSHA) Title 29 Code of Federal Regulations (CFR) 1910, Subpart O

Machinery and Machine Guarding requirements and applicable American National Standards

Institute/American Society of Mechanical Engineers (ANSI/ASME) standards (ANSI/ASME

B-11 2010 Machine Guarding Risk Assessment guideline).

3. Vendor will perform the MGRA within mutually agreeable schedule pending approval of this contract.

4. Vendor will provide a draft version of the MGRAs to FDRMC Det. Bahrain within 15 business days following the site work for a one-time review and comment. Once received, FDRMC Det. Bahrain will review and confirm the accuracy of the MGRAs within 15 business days. If revisions are necessary, FDRMC Det. Bahrain will notify vendor, and the requested revisions will be made. If no comments are received during the review period, the

MGRAs will be assumed to be accurate, and the project will be closed.