STATEMENT OF WORK FOR DGO WAREHOUSE FENCE (3).docx

DOCX document 18 KB Posted

Attached to
Chain-link Fence Purchase and Installation
Solicitation number
69727626Q000003
Issued by

About this file

This is a Statement of Work (SOW) for chain-link fence purchase and installation services at Poland Street Wharf in New Orleans, Louisiana for the Department of Transportation Maritime Administration's Division of Gulf Operations. The contractor must remove and dispose of the existing chain-link fence and gates in compliance with local regulations, then purchase and install a new commercial-grade black vinyl-coated chain-link fence system. The replacement fence specifications include a total height of 7 feet with posts not exceeding 10 feet, a top rail measuring 1 5/8 inches outer diameter, line posts of 2 inches outer diameter, end and corner posts of 3 inches outer diameter, walk gate posts of 3 inches outer diameter, and a drive gate post of 4 inches outer diameter with aluminum frame construction. The fence system must include two 4-foot walk gates and one 20-foot aluminum cantilever gate, with all posts flanged to concrete.

The contractor bears full responsibility for labor, materials, delivery, unloading, and storage of all equipment necessary to complete the installation. The Contracting Officer or designated Contracting Officer's Representative will conduct periodic inspections to ensure work quality and material standards, with final inspection and acceptance occurring upon completion of all work and receipt of required submittals. The contractor must provide a standard commercial warranty covering all parts, materials, and labor for repairs required during the warranty period. Additionally, the contractor must furnish employee names and driver's license numbers for all personnel and subcontractors requiring security facility access, and is responsible for providing all necessary safety equipment to their workforce.

View the file

Other files

File Type Posted
SYNOPSIS SOL CHAIN-LINK FENCE WH DGO 2026.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Project Title: Chain-link Installation for Division of Gulf Operations, Warehouse Loading Dock & Parking Area Location: Poland Street Wharf, Berth 3, Door 38, New Orleans, LA. 70146

1.0 SCOPE OF WORK

The Contractor shall provide all personnel, equipment, tools, materials, supplies, and supervision necessary to perform high-quality installation of chain-link fence at the Poland Ave Wharf Warehouse Loading Dock & Parking Area.

REMOVAL and DISPOSAL > The contractor will remove and take down the existing chain-link fence and gates, place them in the receptacles provided by the contractor, and remove them from the property.

> The contractor will dispose of all debris in accordance with local regulations.

REPLACEMENT:

· The contractor will purchase and install a new commercial-grade black vinyl-coated chain-link fence. The gate shall include and have the following:

· Two (2) 4’ walk gates.

· One (1) 20’ Aluminum Cantilever gate.

· All Posts will be flanged to concrete

· Contractor will ensure the total Height of the fence is 7’, and posts are max 10’

· Contractor will also ensure the Top rail of the fence is 1 5/8 O.D.

· Contractor will also ensure line posts are 2 ½ O.D.

· Contractor will also ensure end posts are 3’ O.D.

· Contractor will also ensure corner posts are 3’ O.D.

· Contractor will ensure that walk gate posts are 3” O.D.

· Contractor will install gate frame as Aluminum O.D.

· Contractor will install drive gate post @ 4’ O.D.

The Contractor is responsible for all labor, material, and costs required to deliver (including unloading) and store the replacement gate along with any additional equipment necessary to complete the installation of Chain-Link Fence.

2.0 INSPECTION AND ACCEPTANCE:

The Contracting Officer or the delegated COR will inspect from time to time the work being performed and the supplies furnished to determine whether construction is being performed satisfactorily and that all supplies are of acceptable quality and standards.

Final Inspection and Acceptance:

If the Contracting Officer or the delegated COR is satisfied that the work under the contract is completed and all required submittals are received, the contract will be considered physically complete. The contractor may submit the final invoice for payment upon physical completion.

3.0 SAFETY and SECURITY REQUIREMENTS:

The contractor is responsible for providing their employees and subcontractors with safety equipment.

The contractor shall provide the names and driver's license numbers for all employees performing the work for security entry to the Government facility.

Warranty A standard Commercial Warranty on all parts, material, and labor shall be provided under the contract. The warranty shall cover labor costs associated with any repairs required during the warranty time frame.