Statement of Work for Charger Installation.pdf
PDF 121 KB Posted
- Attached to
- Installation of 72 Volt Charger
- Solicitation number
- SP330025Q0208
- Issued by
-
Defense Logistics Agency Distribution
About this file
This Statement of Work (SOW) details the installation of a 72-volt charger at Defense Distribution Depot Oklahoma City (DDOO) in Building 18. The contractor is required to furnish all tools, equipment, and materials for pre-installation site survey, electrical infrastructure verification, component procurement, charger installation, electrical connections, grounding, and comprehensive testing. Specific technical requirements include providing a new 3-pole 30amp breaker, installing (3) #8AWG wires and (1) #10 AWG ground in ¾" EMT conduit spanning approximately 50 feet, using rigid conduit along the ground, and creating flexible connections at the charger.
The work will be performed between 7:00 AM and 4:30 PM, Monday through Friday, with deliverables including a fully installed and tested charger, potential compliance certification, and a final documentation package. Contractor responsibilities encompass executing work per safety standards, providing qualified personnel, maintaining a clean work environment, and completing all electrical terminations. The installation will be considered complete when the charger is fully operational and the client provides final sign-off. This solicitation is a Small Business Set-Aside under NAICS code 562211, with quotes due electronically by 10:00 AM EST on June 05, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CSS SP330025Q0208.pdf | ||
| CSS SP330025Q0208.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (S.O.W.)
DDOO Oklahoma – Building 18 72-volt Charger
Requiring Organization
Defense Distribution Depot Oklahoma City, Oklahoma (DDOO)
Purpose of the Statement of Work (SOW)
This Statement of Work (SOW) outlines the tasks, responsibilities, and deliverables for the installation of Building 18’s 72-volt Charger at the designated site. The goal is to ensure a safe, efficient, and fully operational charging system in compliance with all relevant regulations and standards.
Scope of Work to be Performed:
The contractor will furnish all the tools, equipment and materials necessary for the installation of Building 18’s 72- volt Charger. The contractor will then do the Pre-Installation, Installation, and operationally test machines for troubleshooting.
Pre-Installation
• Conduct a site survey to determine optimal charger placement.
• Verify electrical infrastructure compatibility.
• Procure and inspect all required components.
Installation
• Install the B18 72-volt Charger at the designated location.
• Ensure proper electrical connections and grounding.
• Secure mounting and protection against environmental factors.
• Integrate the charger with the existing power system.
Testing and Commissioning
• Perform functional and safety tests.
• Verify compliance with local electrical codes.
• Demonstrate the charger’s functionality to the client.
Timeline
• All work will be performed between 7:00 AM – 4:30 PM, Monday – Friday.
• Any delays due to unforeseen circumstances must be communicated in advance.
Deliverables
• Fully installed and tested B18 72-volt Charger
• Compliance certification (if applicable)
• Final documentation package
Responsibilities
Client Responsibilities:
• Provide site access and necessary approvals.
• Ensure availability of electrical supply.
• Review and approve work progress.
Contractor Responsibilities:
• Execute the work as per specifications and safety standards.
• Provide qualified personnel for installation.
• Maintain a clean and safe work environment.
• Provide a new 3-pole 30amp breaker in existing 120/208v panelboard.
• Provide (3) #8AWG wires and (1) #10 AWG ground in ¾” EMT conduit from existing panelboard to new charger location (roughly 50’ away).
• Conduit from wall to charger will be rigid conduit and ran along the ground.
• Provide flexible connection at charger.
• Provide all terminations.
Acceptance Criteria
The installation will be considered complete when:
• The charger is fully operational and tested.
• The client signs off on the final installation.
| The contractor will furnish all the tools, equipment and materials necessary for the installation of Building 18’s 72- volt Charger. The contractor will then do the Pre-Installation, Installation, and operationally test machines for troubleshooting. |
| Pre-Installation |
| Installation |
| Testing and Commissioning |
| Timeline |
| Deliverables |
| Responsibilities |
| Client Responsibilities: |
| Contractor Responsibilities: |
Acceptance Criteria
File details come from the government source that posted it. Updated .