Statement of Work-FINAL 23JUL21.pdf

PDF 229 KB Posted

Attached to
NEW REQUIREMENT-WINTER BOAT HAUL OUT AND STORAGE - USCG STA PORT HURON
Solicitation number
2121301CD4HF5
Issued by

View the file

Other files

File Type Posted
PAST PERFORMANCE REFERENCE SHEET.pdf PDF
Wage determination-ST Clair County.pdf PDF
Far Matrix Service.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #: 2121301CD4HF5

STATEMENT OF WORK

LAST UPDATED: 07/23/2021 PAGE 1/3

STATEMENT OF WORK (SOW)

FOR

U. S. Coast Guard

Station Port Huron Boat Haul Out

FINAL DRAFT: 7/23/21

1.0 GENERAL

1.1 BACKGROUND

Port Huron pulls its 45ft RBM every November through March for winter storage.

1.2 SCOPE

1.3 OBJECTIVE

The awarded contractor will house the 45ft RBM through the winter allowing access to Coast Guard members throughout the winter. The contractor needs to have a boat hoist that is inspected and certified for the weight of the RBM. The contractor would be responsible for lifting the boat out of the water. It would be ideal to have the RBM be housed inside a structure.

1.4 APPLICABLE DOCUMENTS

N/A

2.0 SPECIFIC REQUIREMENTS/TASKS

Please see 1.3 Objective

3.0 QUALIFIED PERSONNEL

The Contractor shall provide qualified personnel to perform all requirements specified in this

SOW.

3.1 CONTINUITY OF SUPPORT

The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.

3.2 EMPLOYEE CONDUCT

Contractor’s employees shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, file://///hqnas/SHARED/G-A/G-ACS/CAAT%20Team/TOOLBOX/SCOPE%20PARAGRAPHS.doc

LAST UPDATED: 07/23/2021 PAGE 2/3

STATEMENT OF WORK

wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.3 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.

Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.0 PERIOD OF PERFORMANCE

The period of performance for this contract shall start 1 Nov 2021- 31 March 2022

4.1 PLACE OF PERFORMANCE

The primary place of performance will be the Contractor’s facilities with frequent visits to the United States Coast Guard at USCG Port Huron

2800 Omar Street Port Huron, MI Telephone—810-984-2603 POC: MKC Chad Hagen

4.2 HOURS OF OPERATION

Contractor employees shall generally perform all work between the hours of 0800 and 1500 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.

4.3 TRAVEL

Contractor travel shall not be required for this requirement.

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.

LAST UPDATED: 07/23/2021 PAGE 3/3

STATEMENT OF WORK

6.0 CONTRACTOR FURNISHED PROPERTY

The Contractor shall furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and SOW 5.0.

7.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

File details come from the government source that posted it. Updated .