Statement of Work - Facility 1302 Turnstiles Maintenance.pdf
PDF 156 KB Posted
- Attached to
- Facility 1302 Turnstile Maintenance
- Solicitation number
- FA480026Q0077
About this file
Statement of Work Summary: Facility 1302 Turnstile Maintenance
This is a Statement of Work (SOW) for preventative maintenance services on five Magnetic Autocontrol turnstiles located at Building 1302, 586 Weyland Road, Langley Air Force Base, Virginia 23665. The contractor shall provide all labor, materials, equipment, and management necessary to perform comprehensive inspection, mechanical adjustment, debris clearing, and operational verification of the turnstile units to maintain continuous operational readiness for the 497th Intelligence, Surveillance, and Reconnaissance Group (ISRG) and Distributed Ground System-1 (DGS-1) operations. The maintenance must include a site survey to identify required work, performance of all recommended preventative maintenance, workspace cleanup, and verification of proper turnstile function before final departure.
The project must be completed within 60 days of award, with work commencing within 14 days post-award. Maintenance will be conducted on five turnstile lanes (Far Right, Center Right, Center, Center Left, and Far Left) using a phased schedule to maintain continuous facility access during the 24/7 mission operations. Normal operating hours are 0800 to 1700 Eastern Standard Time, Monday through Friday, excluding federal holidays, with any outside-hours services requiring one week advance coordination with the Contracting Officer Representative (COR). All contractor personnel shall be escorted by Government representatives at all times while in the facility. Coordination shall be conducted through the Project Manager and Chief of Security, Mr. Keith Johnson or the COR. Project completion will be verified through a final walk-through with the COR, with acceptance based on fulfillment of all performance requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) FOR FACILITY 1302 TURNSTILE MAINTENANCE
27 Jul 26
1.0 Description of Services The contractor shall provide all labor, materials, equipment, and management necessary to perform regularly scheduled preventative maintenance of the facility turnstiles at 586 Weyland Rd, Langley AFB, VA 23665. This service is required to ensure the continued operational integrity of the lobby turnstiles, which are critical for maintaining the secure posture of the facility. The project's goal is to perform all recommended preventative maintenance to ensure the turnstiles remain fully functional, prevent hardware failure, and support the facility's 24/7 mission operations.
2.0 Scope of Work. This Statement of Work (SOW) defines the requirements for maintenance five (5) Magnetic Autocontrol turnstiles to directly support the 497th Intelligence, Surveillance, and Reconnaissance Group (ISRG) and the 24/7 mission operations of Distributed Ground System-1 (DGS-1).
The desired outcome of this effort is to guarantee the continuous, uninterrupted operational readiness of the facility's physical access control systems. The magnitude of this requirement encompasses the heavy, day-to-day use of the turnstiles by all mission personnel entering and exiting the multi-story facility. To meet the required standard of quality, the contractor must ensure high-reliability preventative maintenance that prevents hardware-related security breaches, minimizes downtime, and allows for safe, rapid access and departure.
2.1. Performance Requirements:
The outcomes includes a comprehensive inspection, mechanical adjustment, clearing of debris, and operational verification of all turnstile units. All maintenance will be conducted at 586 Weyland Rd, Bldg.
1302; contractors will be escorted at all times by Government representatives to ensure secure operations.
2.1.2. Contractor will complete a site survey and gather all data necessary to establish what needs to be performed.
2.1.3. Contractor will perform preventative maintenance recommended to ensure continued day-to-day use.
2.1.4. Contractor will ensure the workspace is clear of tools, parts, and other debris that were not there before the servicing. Contractor will also ensure the proper function of turnstiles before final departure from the facility.
2.2. The project will must be completed within 60 days of the award date. A phased schedule is necessary as certain sections of the lobby entry paths and specific turnstile lanes will need to be closed to allow the work to occur safely while maintaining continuous access/departure for mission personnel. The schedule may be adjusted depending on contractor availability, mission demands, facility occupants, or other projects that might impact the service.
Start Date: Within 14 days post award
Turnstile Lane 1 (Far Right)
Turnstile Lane 2 (Center Right)
Turnstile Lane 3 (Center)
Turnstile Lane 4 (Center Left)
STATEMENT OF WORK (SOW) FOR FACILITY 1302 TURNSTILE MAINTENANCE
27 Jul 26
Turnstile Lane 4 (Far Left)
2.3. Coordination: The contractor must coordinate all on-site activities, including scheduling and access, through the Project Manager and Chief of Security Mr. Keith Johnson or COR. Contractor personnel will be escorted at all times by Government representatives while inside the facility.
3.0 General Information
3.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.
3.1.2. Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office.
The Contractor shall cooperate in any resulting safety investigation.
3.2 Contract Management & Administration
3.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.
3.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.
3.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.
3.4 Place of Performance: All maintenance will be conducted at 586 Weyland Rd, Bldg. 1302;
contractors will be escorted at all times by Government representatives to ensure secure operations.
3.5 Hours of Operation: Normal hours of operation are 0800 to 1700 Eastern Standard Time (EST), Monday – Friday, excluding federal holidays Services performed outside of these hours must be coordinated with the Contracting Officer Representative (COR) no later than one week prior.
4.0 Inspection and Acceptance:
4.1 Inspection: Project will be considered completed upon a final walk-through with the COR.
Acceptance will be based on the successful fulfillment of all performance requirements outlined in this SOW, specifically the preventative maintenance of the 497 ISRG turnstiles.