Statement of Work (SOW) Project: Rainout Shelter Repair

GENERAL INFORMATION

1.0 Scope of Work: Remove and replace curtains (2) and pockets (4) on 7 rainout shelters. Remove and replace pockets only on 3 rainout shelters.

2.0 Background: We have 10 rainout shelters at the Gibbs Farm that we use to impose heat and drought stress on peanut plots. Due to normal wear and tear after several years of use, these repairs are needed to the side curtains.

CONTRACTOR REQUIREMENTS

3.0 Technical Requirements/Tasks:

- Remove and replace two side curtains and four pockets on each of seven 30’x 84’ x 4’ Snow Arch Rainout Shelters.

- Remove and replace four pockets on three 30’ x 84’ x 4’ Snow Arch Rainout Shelters.

4.0 Government Furnished:

The ten rainout shelters are owned by the federal government and located on a

University of Georgia Farm. We will arrange access at the convenience of the contractor.

5.0 Deliverables / Schedule:

Deliverables will be ten rainout shelters with repaired and fully functioning side curtains.

Schedule: All work will be completed within 30 days of the granting of the contract.

6.0 Travel: Not Applicable

7.0 Contractor’s Key Personnel: Not Applicable

8.0 Security Requirements: Standard safety rules for general construction and repair will be followed.

9.0 Data Rights: Not Applicable

10.0 Section 508 – Electronic and Information Technology Standards:

Not Applicable

CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
6.0 Travel: Not Applicable

File details come from the government source that posted it. Updated .