Statement of Work DRAFT.pdf
PDF 1 MB Posted
- Attached to
- Shop Support Federal contract opportunity
- Solicitation number
- N4523A22R0804
About this file
This sources sought notice is seeking capability statements from interested parties for a future multiple award contract to provide shop support trades at Puget Sound Naval Shipyard and Intermediate Maintenance Facility. The trades include shipfitter/lead worker, sheetmetal, welder structural fire watch, inside machinist, outside marine machinist, marine electrician, marine pipefitter, marine insulator/lagger, shipwright, blaster, sprayer, blaster/sprayer, temporary services electrician, temporary services pipefitter, and riggers. Capability statements are due by January 3, 2021 and should address experience, management structure, technical skills, and ability to perform at least 50% of the work. The government will evaluate responses to determine market capacity and implement project management. The NAICS code is 336611 and product service code is J999.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Section C:
MAC Shop Support
Statement of Work (SOW)
1. SCOPE: The Northwest Regional Maintenance Center (NWRMC), Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF), Code 400 contracting office, intends to utilize this supply contract, under Walsh-Healy Public Contracts Act, for trade shop support for the repair, maintenance and alterations requirements for U.S. Navy waterborne vessels, surface ships and submarines visiting or home ported in Bremerton, Everett, Keyport and NBK Bangor (Silverdale), Washington.
2. REFERENCES: Whenever specifications, standards, drawings, publications or other documents are cited without issue number, revision, date or amendment number identified, the revision, date or amendment in effect as of the date of the delivery order shall apply. Wherever specific issue number, revision, date or amendment number for specifications, standards and publications are specified, the issue specified shall apply. If, during the performance of this contract, the Contractor believes that the contract contains outdated or different versions of any specifications or standards, the Contractor may request that this contract be updated to include the current version of the applicable specification or standards. Updating shall not affect the form, fit or function of any deliverable item. The Contractor should submit update requests to the KO with copies to the designated COR. The Contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Contracting Officer. Any approved alternate specifications or standards shall be incorporated into the contract/delivery order.
2.1. 29 CFR 1910.1200 Hazardous Material (HM)/Hazardous Communication standards
2.2. 29 CFR 1915 (Shipyard Industry)
2.3. IPI 0077-904 Toxic Metals Work Practices
2.4. IPI 0593-904 Polychlorinated Biphenyls, Sampling and Handling of
2.5. IPI 0993-902 Asbestos; Sampling, Handling, Removal, and Disposal
2.6. Joint Fleet Maintenance Manual (JFMM)
2.7. MIL-STD-1689A Fabrication, Welding, and Inspection of Ships Structure
2.8. National Fire Protection Association Standard 51B, 1999 Edition (Standard for Fire Prevention during Welding, Cutting, and Other Hot Work)
2.9. Naval Ships’ Technical Manual Chapter 635 Thermal, Fire, And Acoustic Insulation
2.10. NAVSEAINST 4350.2, Contract Work On-Board Nuclear Powered Ships
2.11. NAVSEAINST 5511.32C, Safeguarding of Naval Nuclear Propulsion Information (NNPI)
2.12. NAVSEA Technical Publication S0570-AC-CCM-010/8010 Industrial Ship Safety Manual for
Fire Prevention and Response
2.13. NAVSEA Technical Publication S9AA0-AB-GOS-010/GSO General Specifications for Overhaul of Surface Ships
2.14. NAVSEA Technical Publication S9074-AQ-GIB-010/248 Requirements for Welding and Brazing
Procedure and Performance Qualification
2.15. NAVSEA Technical Publication S9074-AR-GIB-010A/278 Requirements for Fabrication
Welding and Inspection, and Casting Inspection and Repair for Machinery, Piping, and Pressure Vessels
2.16. NAVSEA Technical Publication T9074-AD-GIB-010/1688 Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2.17. NAVSEA 0989-062-4000 Naval Nuclear Quality Assurance Manual for Shipyards and the Naval Reactors Facility
2.18. NAVSEA 250-1500-1 REV 18, Welding Standards
2.19. NAVSHIPYD Puget Instruction 4730.54 Submitting Samples To The Laboratory Division For
Analysis Or Test
2.20. NAVSHIPYD Puget Instruction 5090.5 Hazardous Waste Plan
2.21. NAVSHIPYD Puget Instruction P4110.1 Hazardous Material Control And Management
(HMC&M) Program
2.22. NPDI PROJ 2 Job Preparation
2.23. NSI N-10077 Portable Vacuum Systems
2.24. NWRMC 099-01NW General Occupational Safety and Health Requirements for the Bremerton Naval Complex (BNC)
2.25. NWRMC 099-09NW Local Standard Item (General requirements for Level of Effort contracts)
2.26. OPNAVINST 5100.23 Navosh Program Manual
2.27. OPNAVINST N9210.3 Safeguarding of Naval Nuclear Propulsion Information
2.28. OSHA Directive Standard 2 (Identification of General Industry Safety and Health Standard applicable to Shipyard Work)
2.29. OSHHW32 Hazardous Materials Hazcom/Environmental Awareness
2.30. OSH Manual Puget Sound Naval Shipyard Occupational Safety and Health Manual
2.31. PSNS&IMF INSTRUCTION 4350.1, Contract Work On Board Nuclear-Powered Ships Under
PSNS&IMF Cognizance
2.32. PSNS&IMF OSH Manual, Vol. III, Ch. 13: Man-Made Vitreous Fibers
2.33. PWC Instruction 5090.1 Hazardous Waste and Hazardous Materials Turn-In Procedures for
Forces Afloat and Ashore
2.34. Safety Data Sheet (SDS)
2.35. Technical Work Documents (TWD) issued by PSNS & IMF
2.36. UIPI 0770-104 Shipboard Hotwork Precautions
2.37. UIPI 5050-904 Mechanical Joint Makeup
2.38. UIPI 9390-106 Insulation and Lagging; Install, Control, Inspect, Remove/Replace
3. INITIAL AWARD: Straight time with 5% overtime (OT)
Shop/ Code Support Description
Number Requested Start Date End Date
40-hr week hrs OT
Total MD's
Mechanic
Supervisor
Competent Person
Totals
OT OPTION: 15% OT option provided if initial award utilization satisfied.
Shop/ Code Support Description
Number Requested Start Date End Date
40-hr week hrs OT
Total MD's
Mechanic
Supervisor
Competent Person
Totals
*NOTE: Initial Award and OT Option will be determined on each Delivery Order (DO).
*NOTE: In the event an individual solicitor is unable to provide total support requested, additional DO(s) shall be awarded as needed to fulfill total requirement.
4. DEFINITIONS:
4.1. “Business Day” means a day between and including Monday through Friday and excluding United States Government holidays. For administrative purposes such as submission of reports and notifications, a “Business Day” shall be measured in Pacific Standard Time (PST), ending at 5pm
PST.
4.2. “No gap in production” means that the replacement employee is immediately available for muster at the worksite and that all qualifications, certifications and other requirements of this statement of work (SOW) have been met in order to continue the “production effort” without delay.
4.3. “Production effort” means labor effort utilized to directly complete work as identified in the SOW.
4.4. “Administrative effort” means labor effort utilized to support the production effort that includes but is not limited to: preparation of travel arrangements, contractual support, report preparation and other effort normally considered as other direct labor cost.
5. DELIVERABLE ITEMS:
5.1. Contractor shall submit qualifications in accordance with (IAW) CDRL# A001 – Qualification
Record Report.
5.2. Contractor shall submit attendance records in accordance with (IAW) CDRL# A002 – Attendance Record Report.
5.3. Contractor shall submit injury report(s) in accordance with (IAW) CDRL# A003 – Incident
Report.
5.4. Contractor shall submit updated lead compliance program report(s) in accordance with (IAW) CDRL# A004 – Updated Lead Compliance Report.
6. GENERAL REQUIREMENTS: The contractor shall provide all management, supervision, labor, consumable materials, supplies and trade specific tooling required for the statement of work (SOW). All work will be completed using the references in paragraph 2. The technical work documents (TWD) will call them out specifically.
6.1. The contracting officer’s representative (COR) shall be the primary interface for the contractor.
All correspondence related to this contract effort shall explicitly go through the COR. Any changes to the contract shall go through the Contracting Officer (KO).
6.2. Ship, Submarine and Vessel Repair Projects: Typical ship and vessel projects may include:
welding; fire watch; marine pipefitting; shipfitting; lead work; blasting; painting; sheet metal forming; shaping; cutting and stamping; electrical/electronic repairs and modernization;
electrical/electronic alteration; pump/motor and ship’s mechanical systems repair; tank cleaning;
general maintenance; rigging; plastic fabricating, woodworking and temporary scaffolding removal/installation. Inherent in performing this contract, the Contractor(s) shall provide and are responsible for all labor, management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, and transportation necessary to perform the requirements of each ship/vessel delivery order issued. The Contractor shall ensure adequate resources are dedicated to comply with the standards, guidelines and procedures as stated to satisfy the requirements of delivery orders.
6.3. SOW: Includes details of work items/work requirements, deliverables, documentation, training;
applicable Government/departmental/industry standards, etc., which explains the requirements of each delivery order.
6.4. CONTRACTOR ORIENTATION BRIEFINGS: Before accomplishing any work, contractor employees shall complete PSNS & IMF orientation briefings as specified below. This includes an orientation which is included in the total hours to be estimated. These PSNS & IMF orientation briefings will be provided and scheduled by project personnel, and/or project Resource Manager.
The COR will coordinate an Orientation brief to contractor employees for the below requirements:
6.4.1. C/101 COR and C/900R will present the following information:
Badging and Security Requirements.
Audible Alarms, Announcements and Drills.
Personal Electronic Device (PED) Policies.
Personal Protective Equipment (PPE) and Safety Requirements.
Confined and Enclosed Space Entry Requirements.
Injury and Hazard Reporting
Work Assignment Procedures
Overtime Work Requests
Time Sheet and Attendance Procedures
Tobacco and Marijuana & Other Prohibited Drug Use Policies
Misconduct and Sexual Harassment Reporting
6.4.2. Shop Management and Supervisors will present the following information:
Pre-Shift Briefing Requirements.
Task Group Instruction (TGI)/Technical Work Documents (TWD) Usage.
Deficiency Logs (DL)/Deficiency Reporting (DR) Forms/Work Control
Procedures.
Casualty Control (CASCON) Procedures.
Work Control Compliance (Lockout/Tag plus).
Coordination of Confined Space and Enclosed Space Certifications.
HM and Environmental Compliance Requirements (reference 2.21).
6.5. The contractor shall provide program management and supervisors to ensure proper execution of the task described herein.
6.6. The contractor shall establish and maintain its own quality reviews to assure that requirements of the contract are provided as specified.
6.7. Conflict resolution and/or administrative actions affecting the contractor’s employees shall be the responsibility of the contractor's management.
6.8. The contractor’s supervisor shall provide oversight of the contractor’s workforce accomplishing the work tasks for the entire business day. A stand-in contractor supervisor shall be identified to the COR in the absence of the contractor supervisor.
6.9. PSNS & IMF shall determine the priority of work.
6.10. Work assignments to the contractor shall be via designated PSNS & IMF supervisors to designated contractor supervision for dissemination to the contractor’s workforce. The designated
PSNS & IMF supervisors will provide technical work documents in the form of TGIs or applicable portions thereof to the designated contractor supervisor prior to each task assignment.
6.11. The contractor shall comply with PSNS & IMF processes, TWDs and technical specifications identified in Section 2 “REFERENCES” of this SOW as well as the requirements of references 2.1 and 2.2, including all local and state codes and regulations.
6.12. The Contractor may be required to work on various projects or sites at any one time. This could be followed by an inactive period where effort is not required. The Contractor shall be required to perform in accordance with the standards, guidelines, and procedures, as stated in each individual delivery order. The Contractor is an independent contractor and not an agent of the Government.
6.13. Contractor personnel shall be available for informational meetings with the COR to discuss the direction, progress, results, and/or issues that occur during the performance of each delivery order placed under this contract.
6.14. The contractor shall be responsible to utilize controls (e.g. containments and barriers) necessary to prevent damage to ship’s equipment and/or personnel during work performance.
6.15. Contractor personnel are not authorized to use the PSNS&IMF tool room.
6.16. Contractor management is responsible for ensuring trades mechanics have easy access to contractor provided consumables/material/tooling upon execution of onsite work.
6.17. All materials selected for installation must meet the specified standard military performance specifications, and federal performance standards, and may be listed on the Qualified Products List (QPL) for shipboard installations. This will ensure the materials will meet the designated/engineered requirements for boundary locations, fire insulating/fire retardant properties, durability requirements, and for the reduction of toxic compounds produced/released should the material be ignited or installed in a confined space.
6.18. Material Packaging: For acquisition purposes, the packaging requirements shall be as specified in the delivery order. When actual packaging of material is to be performed by contractor personnel, the contractor needs to contact the COR to ascertain requisite packaging requirements.
6.19. Hazardous Material (HM): Based on the best information available at the time of solicitation issue, the materials identified in the list below may be encountered during task performance.
HAZARDOUS MATERIALS
Asbestos Bilge Water Chromic Acid Cleaning Solvents Ethylene Glycol (Antifreeze) Fluorocarbons Hydrazine Hydrochloric Acid Mercury Methyl Ethyl Ketone Miscellaneous Chemicals (Corrosive) Miscellaneous Chemicals (Flammable) Miscellaneous Chemicals (Reactive) Miscellaneous Chemicals (TCLP Toxic) Morpholine Nitric Acid Oil (Synthetic) Oil/Water Polychlorinated Biphenals Paints (Enamel, Latex, Epoxy thinners, oil-based, rubber paint, non-skid, lacquer, remover, varnishes) Paint Strippers (Phenols, lead, chromium) Sanitary Sewage (hydrogen sulphide & hydrogen) Sodium Chromates Sodium Hydroxide Sodium Phosphates Sodium Nitrite Spent Abrasive Blast Material (Contaminated-hazardous waste)
Sulfuric Acid Trichloroethane
All paints on Naval vessels are considered to contain heavy metals, including but not limited to, lead, chromium or cadmium unless it can be established otherwise by laboratory analysis. In disturbing or removing paint during data collection for a specific task, the Contractor and any Subcontractor(s) shall comply with the requirements of applicable safety and health laws and regulations such as Occupational Safety and Health standards which include Maritime Standards (29 CFR 1915), General Industry Standards (29 CFR 1910), and other applicable federal, state and local environmental protection laws, codes, ordinances and regulations. Additionally, the Contractor and Subcontractor(s) shall read and comply with NAVSHIPYDPUGET P5090(4), “Updated Environment, Safety, and Health (ESH) Requirements”.
6.20. Contractor employees will be briefed by PSNS & IMF supervisors on the requirements for HM and hazardous waste management.
6.21. All HM shall be controlled by PSNS & IMF. Hazardous waste generated by the contractor shall be turned over to a PSNS&IMF designated supervisor daily.
6.22. The contractor shall be responsible to comply with all environmental and hazardous waste requirements and report any conflicts to the COR.
6.23. The contractor supervisor will be notified by PSNS & IMF when government sample results indicate toxic metal (lead, cadmium etc.) work controls are required in accordance with OSHA regulations and standards.
6.24. Upon request, the COR will provide the contractor with the Sample Survey Report (SSR). The contractor shall be ultimately responsible for determining hazards and the appropriate controls for their employees. If the contractor considers the SSR insufficient, the contractor shall take samples as considered necessary to make determinations for compliance with reference 2.3. The Thermal System Insulation (TSI) is not listed on the SSR and will be sampled by PSNS accordingly or an evaluation performed for hazards.
6.25. The Contractor shall perform hazardous energy control in accordance with the Occupational
Safety, Health and Environment (OSHE) Control Manual Chapter 250.
6.26. The Contractor is solely responsible for compliance with the lead personnel protection requirements of 29 CFR 1910.1025 and the cadmium personnel protection requirements of 29 CFR 1910.1027. The Contractor shall provide Code 400 copies of the records associated with those requirements and current contractor heavy metal plan. In many situations, the contractor employee will need to be able to lift, carry and set up installations of material and equipment that may weigh in excess of 50 pounds.
6.27. Confined and Enclosed Entry: When required, the Contractor will be required to provide a
Competent Person (CP) and/or Marine Chemist (MC) to perform required gas free certifications of confined spaces, as defined in OSHA’s Shipyard Industry requirements of 29 CFR 1915.
6.27.1. Gas Free Certification: The CP and/or MC shall be responsible for the safety of contractor employees and assumes all responsibility for both the initial Gas Free certification of all confined spaces and for all subsequent updates of the certification.
Initial Gas Free Certification and subsequent updates shall be performed in accordance with the requirements of 29 CFR 1915 Certifications shall be valid for no greater than 24 hours.
6.27.2. Gas free certification sheet: The gas free certification sheet shall state, at a minimum, the vessel, compartment, hull, space number, date, time, CP/MC name, CP/MC signature, badge number, conditions and comments, atmosphere and condition codes (example:
SW-Safe for workers or ER- entry with restrictions). Additionally, if any HAZMAT or painting is authorized it shall be noted on the certificate.
6.27.3. Contractor training: Contractor shall provide initial and annual update training for
CP/MC by utilizing a National Fire Protection Association (NFPA) Certified Marine Chemist or NFPA Instructor. The length of the initial training class shall be at least 24 hours. Certifications shall be maintained current during the contract/delivery order period of performance.
6.27.4. Contractor shall maintain a current roster of designated CP(s) and copies of certificates of completion for the training required. Submit legible copies, in approved transferrable media, of the specific documents when requested by the PSNS & IMF POC. Contractor shall post a copy of the Marine Chemist's certificate (MCC), Certified Industrial Hygienist's test/inspection record, or Competent Person's test/inspection record at each access to the affected space while work in the space is in progress.
6.27.5. Contractor, Shipyard and Ship's force coordination: Contractor, Shipyard and Ship's force shall coordinate confined space work so that conflicting operations do not occur at the same time. Contractor's CP/MC shall coordinate with the projects' tank coordinator on an as needed basis. Current confined space status shall be provided to the contractor by the Government. Contractor shall provide to the tank coordinator a point of contact list in case of changed conditions or modifications needed for a confined space.
6.27.6. Certification/Inspection Report: At the end of each visit, contractor shall submit a copy of the certification of the tank/space/compartments being inspected to one of the designated project tank coordinators.
6.28. PSNS & IMF reserves the right to adjust work hours and shifts to accommodate schedule confinement and availability of shipboard spaces, work schedule, work progress, and conflicting repair operations. PSNS will give the contractor (3) days advance notice, when possible, or immediately upon realization of a need for shift change. The contractor is responsible for managing staffing levels to include impacts of work hour and shift adjustments.
6.29. When an employee is going to be replaced, the contractor shall immediately notify the COR. For routine personnel changes, the contractor will identify the replacement employee and provide the replacement employee prior to removal of the outgoing employee to ensure no gap in production occurs. No gap in production means that the replacement employee is available for muster at the worksite and that all qualifications, certifications, and other requirements of this SOW prior to production effort have been met.
6.29.1. For unplanned personnel changes, to include but not limited to disciplinary actions, grievances and personal emergencies the contractor will:
Notify the COR within (24) hours.
Determine and provide within (10) business days a replacement if available.
If replacement is not available, the remaining hours will be de-scoped from the contract.
6.30. PSNS & IMF reserves the right to adjust trade mix to best support this effort. This includes, but is not limited to, reduction in one or more trades. PSNS & IMF shall provide (5) business days advance notice prior to adjustment in trade support. The contractor shall ensure the necessary staffing arrangements to implement this adjustment in trade support within this time frame.
Contractor employees are not guaranteed hours under this effort. The contractor is responsible for managing staffing levels to include impacts to work hours and trade mix.
6.31. PSNS & IMF reserves the right to alter the schedule of this specific tasking if the task completes earlier than planned or if task execution problems/delays cause a significant work stoppage.
6.32. HOURS OF WORK: Standard task hours normally assigned shall be worked during a 5-day work week (Monday – Friday) working eight (8) hour shifts (not including lunch break). At government discretion, the hours may either be on day shift (typically 7:20 A.M. – 4:02 P.M.), swing shift (typically 3:30 P.M. to 12:00 A.M) and/or graveyard shift (typically 11:30 P.M. – 8:00 A.M.).
6.33. Overtime work beyond the regular 40-hour work week Monday-Friday, including shifts of (10) or
(12) hours and work during the weekend not-to-exceed (NTE) (12) hours per shift for non-supervisory personnel and (13) hours per shift for supervisory personnel (not including lunch break)), is authorized on this contract but is not guaranteed. Overtime work shall be requested by the applicable PSNS & IMF shop/code to the COR for approval with a minimum of (24) hours’ notice (e.g., Thursday notice for weekend work). PSNS & IMF overtime requests will be validated with the contractor. When overtime hours are authorized, work hours for (10) hour Day Shift will typically be 5:20 A.M. to 4:02 P.M. and Swing Shift from 3:30 P.M. to 2:00 A.M: for (12) hour Day Shift, 6:00 A.M. to 6:30 P.M. and Swing Shift from 6:00 P.M. to 6:30 A.M. Overtime worked without the approval of the COR is unauthorized and is an unallowable cost.
6.34. The contractor shall observe the following holidays, curtailments and other work shutdowns: New Year’s Day, Martin Luther King, Jr. Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day and Holiday Curtailment.
7. WORK SPECIFICATION:
7.1. GENERAL INFORMATION: The contract labor categories include the specific combinations of technical education, ability, and experience the Government considers necessary for performance each delivery order worked. Labor categories are defined by any associated academic and experience qualifications set forth in this contract. Each labor category is characterized in practice by a unique combination of three elements:
7.1.1. Nature of assignments handled is defined by the complexity of the job to be done and the techniques utilized to do it.
7.1.2. Level of responsibility is measured in terms of supervision received, guidelines and precedents utilized, and person-to-person contacts.
7.1.3. The required minimum qualifications established for labor categories will continue as the minimum standards for all personnel during the course of performance under this contract.
7.2. EXPERIENCE: The contractor shall provide personnel that possess either a high school diploma or GED equivalence. Additionally, contractor personnel assigned work in the following trades:
Inside Machinist (Bench Mechanic or Operator) Marine Electrician, Marine Pipefitter, Outside Marine Machinist, Sheet metal Mechanic, Ship fitter, Temporary Services Electrician, Temporary Services Pipefitter, and Welder (Structural and Pipe) shall have completed a formal course of study in the assigned trade through either a community college, technical or trade school, military training, formal company training program or an apprentice program. All tradespersons assigned shall have a minimum of four (4) years of verifiable experience in the assigned trade, which shall include a minimum of 2 years work experience on U.S. Navy surface ship or submarine platforms.
7.3. QUALIFICATIONS:
7.3.1. The Contractor shall be responsible for employing technically qualified personnel to perform the work specified in each delivery order issued hereunder. The Contractor shall maintain the personnel, organization, and administrative control necessary to ensure that the work delivered meets the contract specification requirements. The work history of each Contractor employee must contain experience directly related to the task and the functions he/she is intended to perform under this contract and any delivery orders hereby issued.
7.3.2. During the life of this contract, the Government reserves the right to request work histories on any Contractor's employee(s) for purposes of verifying compliance with this requirement. If the Government questions the qualifications or competence of any person performing under this contract, the burden of proof shall be upon the Contractor to substantiate competency.
7.3.3. All journeyman (marine) tradespersons shall possess current certifications.
7.3.4. Qualifications are specified in terms of academic background, general and specialized experience. Journeyman tradespersons are required to possess current certifications.
7.3.5. The contractor shall maintain detailed personnel qualification records for those workers performing work in accordance with this contract, and shall provide a printed copy of these records or supporting documentation for review to the KO or the COR prior to issuance of the delivery order. Employees shall have training in shop math and measurement systems and possess the ability to take accurate readings and measurements with the use of micrometers, calipers, and other precision measuring devices common to the applicable trades. The contractor employee shall possess the ability to accurately record readings/measurements and complete documentation for manufacturing/fabrication, repairs, and managing hazardous material requirements.
7.4. LABOR CATEGORIES: The contract labor categories include the following:
Shop 11: Shipfitter/Lead Worker Shop 17: Sheetmetal Shop 26: Welder: Structural
Fire Watch Shop 31: Inside Machinist: Bench Mechanic
Shop 38: Outside Marine Machinist Shop 51: Marine Electrician Shop 56: Marine Pipefitter Shop 57: Marine Insulator/Lagger Shop 64: Shipwright Shop 71: Blaster (C-7)
Sprayer (C-12) Blaster (C-7)/Sprayer (C-12)
Shop 99: Temporary Services Electrician Temporary Services Pipefitter Temporary Services General Maintenance
Code 740: Riggers
7.4.1. Shop 11:
a. Shipfitter/Lead Worker:
The Contractor employee shall be capable of performing removal, alteration, repair, and installation of the ship’s structure. This capability involves knowledge in the following areas; manufacture templates, layout and fabricate structures and fittings including bulkheads, equipment foundations, hangers, ladders, and stanchions; fit-up and make ready for welding, including chipping, beveling, hand-grinding and cleaning of surfaces to be welded. The contractor shall be able to perform post-weld clean-up of ship’s structural repair areas and remove and reinstall tank access covers in support of other work. The Contractor Lead Work support duties and functions, for the purpose of this SOW, are defined as medically cleared and capable of handling, lifting and carrying raw lead weighing up to 80 pounds as specified. The Contractor Lead Worker shall be qualified and trained to wear required respiratory Personal Protective Equipment (PPE) as well as qualified and trained in Lead Awareness; Occupational Safety and Health (OSH) Lockout/Tag-out Controls;
Hazardous Energy Control; Fall Protection; Hearing Conservation and Eye Safety Awareness. The Contractor Lead Worker shall be qualified to work in confined and enclosed spaces.
7.4.2. Shop 17:
b. Sheetmetal:
The Contractor employee shall perform work in shops, dry docks, on piers and aboard surface ships, submarines, barges and various other facilities. Work requires lifting, turning, pulling, pushing, standing, crouching, kneeling, bending, sitting and reaching. The Contractor shall have the skill and knowledge of sheetmetal work so that he/she can select the proper materials, tools, test-equipment and manufacturing processes for the product being removed, modified, repaired, tested, installed or manufactured. Must be able to cut, punch, sand, grind, drill, bend notch, shape, deep draw, spin, indent sheetmetal, operate hand and power driven brakes, saws, punches, rivet guns, shears, toggle-presses, nibblers, rolls, tube benders and spot welders.
May be required to passivate aluminum and work with plastic. Work in accordance with applicable professional/trade standards and practices in the Shipyard.
7.4.3. Shop 26:
c. Welder: Structural:
The Contractor shall be fully qualified as a welder in accordance with NAVSEA Requirements for Welding and Brazing Procedure and performance Qualification (S9074-AQ-GIB-010/248): Shielded Metal Arc Welding (SMAW), Gas Tungsten Arc Welding (GTAW), and Gas Metal Arc Welding-Pulse (GMAW-P). Have the ability to weld Ordinary Strength Steel, Higher Strength Steel and High Yield Strength Steel (OS, HS, HY) using MIL-7018, 8018, 10718, 11018, 70-S, 80-S, 100- S filler material in accordance with NAVSEA applicable instructions. Experienced understanding structural weld procedures/drawings and has knowledge of OSHA requirements and practices in a Shipyard or Marine industrial facility environments.
Government shall specify required welder qualifications prior to the issuance of the delivery order requirement.
Proficiency: Contractor employee(s) prior to starting work, will be required to demonstrate welding workmanship proficiency by visually inspecting and measuring finished welded props for acceptance or rejection. Contractor will demonstrate the ability of weld compliance with the applicable workmanship fabrication document/standard under the government’s observation. Contractor employees who do not pass the workmanship proficiency evaluation will not be deemed qualified to perform this requirement.
d. Fire Watch:
Firewatch support duties and functions, for the purpose of this SOW, are defined as performing visual observation of the operation area on which industrial activity is being performed and extinguishing incipient stage fires as specified. Contractor personnel shall be trained in accordance with the requirements of 29 CFR 1915.508(a) through (c) and 29 CFR 1915.508(e). Contractor Firewatch shall be trained and medically cleared to wear required respiratory personal protective equipment (PPE). Contractor Firewatch shall be trained and qualified in fall protection. Contractor Firewatch shall be qualified to work in confined and enclosed spaces. Perform a visual inspection of the operation area to identify actual and potential fire hazards prior to the commencement of industrial work. Clear or cause to be cleared the operation area of identified fire hazards. Prevent and extinguish incipient stage fires with a portable fire extinguisher when they occur. Summon emergency fire-fighting help in the event attempts to extinguish an incipient stage fire fails. Contractor personnel shall stand fire watch duties with one or more fire extinguisher(s) in areas as instructed by the Contractor’s Supervisor and/or Work Lead. Contractor Firewatch personnel shall have the authority to stop, or cause to be stopped, all industrial hot-work activities in the immediate operation area when they determine that a potentially unsafe fire hazard exists or an unsafe event or condition arises. Contractor Firewatch personnel shall establish and regulate pedestrian traffic around, rather than through, an industrial hot-work operation area whenever practical.
Proficiency: Contractor employees shall assist PSNS&IMF welder in performing the following specific tasks:
Weigh and record the fire extinguisher bottle(s) before and after fire watch duty.
Remain at the work site for 30 minutes (or longer if needed for affected area to cool sufficiently) after all hot work has been completed to ensure that smoldering fires have not been overlooked.
Assist with pre weld set up; running and stringing welding leads and hoses from the welding machines to work areas in a safe manner.
Assist with moving welding/arcing machines, keeping welder supplied with miscellaneous materials including tools including welding wire during welding and also adjusting machine settings specifically directed by the welder.
Assist with building and removing hot work containments (cutting tape or fire retardant materials and attaching material), operating a pass bags or rope pulls with tool bags, material and equipment less than 40-lbs.
7.4.4. Shop 31:
e. Inside Machinist: Bench Mechanic:
The Contractor employee shall be able to disassemble/assemble, inspect, correct deficiencies, torqueing, and test mechanical components such as but not limited to:
hydraulic pumps, actuators, relief valves, ball valves, gate valves, swing gate valves, accumulators, and setting spring adjustments. The Contractor employee shall have an understanding of basic blueprint reading, nomenclature and tooling required to perform the above work.
Proficiency: Contractor employee(s) will be required to demonstrate proficiency in measurement prior to proceeding to the manufacturing stage. During the manufacturing stage, the contractor employee will produce parts that adhere to the tolerance call-outs. The contractor employee must demonstrate the ability to set-up, dial-in; calculate machine speeds, feeds rates, and depths of cuts.
Contractor employees who do not demonstrate proficiency will be considered unacceptable for use under this contract.
Prior to starting work, the contractor employees will be required to demonstrate proficiency by performing the following tasks under government observation:
Take O.D. & Depth measurements, set-up of a machine (manual lathe and/or mill), manufacture two parts to demonstrate the knowledge and ability to accomplish the work specific in the contract SOW. A PSNS&IMF machinist supervisor and a journeyman machinist along with a Contractor representative will be performing the evaluation. The Contractor employee will be required to demonstrate proficiency in the following task:
Measuring: measurement of outside diameters and depths using O.D micrometers & depth micrometers.
Operate: a manual mill or lathe, manufacturing parts with the following attributes: concentricity, parallelism, perpendicularity, and tolerances of +/- .001”. Candidate will also demonstrate knowledge of tapping, boring, and threading processes.
7.4.5. Shop 38:
f. Outside Marine Machinist:
The Contractor employee shall be able to accomplish the following tasks: remove, repair, and install major propulsion, auxiliary, and weapon system equipment in accordance with applicable professional/trade standards and practices on U.S. Naval Surface Ships and Submarines. Install Steering and Diving system components, repair all types of main and auxiliary machinery, including but not limited to capstan, shaft seals, snorkel induction, snorkel exhaust, mast, and various types of pumps, resilient mounts, valves and valve sub-components.
7.4.6. Shop 51:
g. Marine Electrician:
The Contractor employee shall be capable and knowledgeable in troubleshooting/testing various electrical, systems, circuits, controls, instruments and equipment, onboard Navy submarines and/or ships components to document test requirements. The Contractor employed shall have knowledge in the types of electrical measuring instruments and of various electronic measuring devices, such as voltmeters, amp meters, ohmmeters, power analyzers, disconnect /reconnect and Initial Voltage Verification of electrical equipment. The employee shall have a working knowledge of electrical trade mathematics and formulas in order to calculate voltage, amperes and resistance requirements and to determine size and types of material, such as controls, switches, distribution panels, fuses, cable and conduit size, determining power source. Each Contractor employee shall have the ability to read and interpret blueprints, sketches, written technical instructions and manuals to make working diagrams and circuits, electrical systems, circuits, controls, instruments and equipment. The Contractor employee shall be familiar with shipboard systems operating requirements, applicable professional/trade standards and practices in a Shipyard or Marine industrial facility environments.
7.4.7. Shop 56:
h. Marine Pipefitter:
The Contractor employee shall be capable of installing, repairing or modifying high and low pressure water, steam, gas, oil, or other high and low pressure pipes or fittings. Knowledge, skills, and abilities to fabricate and assemble various piping systems (P-1, P-2, & P-3 as defined in S9074-AR-GIB-010/278) of differing metal which includes: cutting, bending, shaping, alignment, and mounting of piping systems on U.S. Naval Surface Ships and Submarines. The contractor employee shall have the ability to read, interpret, and apply blueprints. Knowledge of brazing procedures and how various metals and alloys such as different kinds of steel, high-strength alloy steels, aluminum, cast iron, nickel, monel, brass, copper, bronze react to different brazing processes and techniques. Have the ability to perform shop mathematical calculations involving basic geometry to lay out angles, arcs, and circles. Capable of inspecting and testing installed piping and associated valves, hardware, and hangers. Have knowledge of how equipment and systems are installed and operated as well as the ability to plan work, layout and modify or repair new and/or existing valves and piping. Shall be trained and qualified to the workmanship requirements for piping installation and fit up as prescribed in Welded Joint Design (MIL-STD 22D), Requirements for Fabrication Welding and Inspection, and Casting Inspection and repair for Machinery, Piping and Pressure Vessels (S9074-AR-GIB- 010/278) and NSTM chapter 505.
Proficiency: Contractor employee(s), prior to starting work, will be required to demonstrate proficiency by performing the following tasks under government observation: End prep and fit-up for a P-14 socket joint, fit-up one joint in accordance with the S9074-AR-GIB-010/278 to demonstrate the knowledge and ability to accomplish the work specific in the contract SOW. During end prep and fit-up, the contractor employee will produce a P-14 joint that meets the requirements of the S9074-AR-GIB-010/278. Contractor employees who do not demonstrate proficiency will be considered unacceptable for use under this contract. A PSNS&IMF pipefitter training instructor along with a Contractor representative will be performing the evaluation. The Contractor employee will be required to demonstrate Proficiency in the following task:
Measuring: measurement of inside and outside diameters, socket depth, and pull out (withdrawal) for sockets using micrometers, dial calipers, and a six-inch scale. Demonstrate proper techniques for finding wall thickness, and socket depth, along with scribe lines, reference lines.
Operate: a pneumatic angle grinder.
End prep and Fit-up: demonstrate proper cleaning, prep, and fit-up techniques for a P-14 socket, fillet weld.
7.4.8. Shop 57:
i. Marine Insulator/Lagger:
The Contractor employee shall be able to accomplish the following tasks:
remove/install high temperature, anti-sweat foam plastic, acoustical insulation, finishing cement, calcium silicate, molded sectional, fiberglass cloth, and the removal/installation of portable insulation pads associated with the U.S. Naval Surface Ship and Submarine platforms. To accomplish the above tasks successfully will require knowledge of the different types of insulation and lagging materials for the proper applications in accordance with applicable professional/trade standards and practices in a Shipyard or Marine Industrial written instructions; securing methods like wiring, pasting, and strapping along with having the ability of cutting, shaping irregular bends for pipe, fittings, valve, and other equipment. The Contractor employee shall be trained to meet environmental requirements to acquire, apply, remove and to dispose of installation waste or residuals in accordance with OSHA requirements.
7.4.9. Shop 64:
j. Shipwright:
The Contractor employee shall be qualified to erect, modify, maintain, and disassemble scaffolding/staging of various shipyard systems. The employee shall be capable of building keel blocking, cradles, shoring, cribbing, and other structures to support ships in dry-docks, and shipways. The contractor employee will be required to plan, layout work from blueprints, drawings, select materials, measure and cut to required lengths, use hand tools or portable tools using measuring instruments for example rulers, carpenter’s squares and levels. The employee shall also have the ability to erect different types of containments and apply shrink-wrap for weather protection coverage.
Proficiency: Contractor employees shall be capable of installing SHT (Special
Hull Treatment), graphite tile, and graphite tile with fiberglass-reinforced materials in accordance with applicable professional/trade standards and practices of the Shipyard.
7.4.10. Shop 71:
k. Sprayer/Touch-up:
The Contractor employee shall be certified as a C-12 air sprayer and C-14 airless sprayer (NACE/NBPI; SSPC standards). The contractor shall be capable of preparing coating materials by tinting, toning, matching, blending, and mixing in various additives such as catalysts, drying agents, and retardants for: tanks, voids, bilges, passageways, machinery/propulsion spaces, interior bulkheads and exterior surfaces with the proper applications with brushes or rollers, for the paint millage required by written technical direction. This may require needle gunning, hand or mechanical sanding to prepare the surface for final painting. Sprayer and Touch-up Painter shall meet environmental requirements to acquire, apply, remove and dispose of paint, paint waste or residuals and Lead Paint waste in accordance with OSHA requirements, federal and state laws, and Naval Shipyard procedures. Paint applied shall be free of paint discontinuities, for example: skips, runs, and drips.
l. Blaster:
The Contractor employee shall be certified as a C-7 blaster (NACE/NBPI; SSPC standards). The contractor shall be capable of performing duties associated with abrasive blasting operations for surface preparation of interior and exterior tanks, engine room and interior compartments and MIP/SHT sites.
m. Painter-Blaster:
The Contractor employee shall be certified as a C-7 blaster and C-12 air sprayer in accordance with (NACE/NBPI; SSPC standards). The contractor shall be capable of performing duties associated with abrasive blasting operations for surface preparation of interior and exterior tanks, engine room and interior compartments and MIP/SHT sites and shall be capable of preparing coating materials by tinting, toning, matching, blending, and mixing in various additives such as catalysts, drying agents, and retardants for: tanks, voids, bilges, passageways, machinery/propulsion spaces, interior bulkheads and exterior surfaces with the proper applications with brushes or rollers, for the paint millage required by written technical direction. This may require needle gunning, hand or mechanical sanding to prepare the surface for final painting. Sprayer and Touch-up Painter shall meet environmental requirements to acquire, apply, remove and dispose of paint, paint waste or residuals and Lead Paint waste in accordance with OSHA requirements, federal and state laws, and Naval Shipyard procedures. Paint applied shall be free of paint discontinuities, for example: skips, runs, and drips.
7.4.11. Shop 99:
n. Temporary Services Electrician:
The Contractor employee shall be able to read and interpret blueprints, sketches, written technical instructions and manuals for working diagrams and circuits. The contractor employee shall have working knowledge of electrical trade mathematics and formulas in order to calculate voltage, amperes and resistance requirements and to determine size and types of material, such as controls, switches, distribution panels, fuses, cable and conduit size, determining power source. Knowledgeable in the use of electrical measuring instruments and of various electronic measuring devices such as voltmeters, ammeters, and ohmmeters. Work will consist of installation and removal of temporary electrical service onboard surface ships, submarines, shops, dry docks, and on piers.
o. Temporary Services Pipefitter:
The Contractor employee shall be able to read and interpret blueprints, sketches, written technical instructions and manuals for working diagrams and pipe system.
The contractor employee shall have knowledge of how equipment and systems are installed and operated as well as the ability to plan work, layout and modify, or repair new and/or existing valves and piping. Capable of inspecting and testing installed piping and associated valves, hardware, and hangers. Have working knowledge of trade mathematics and formulas in order to calculate flow rate and volume. Ability to understand temporary ventilation requirements and method trade standards. Work will consist of installation and removal of temporary pipe service onboard surface ships, submarines, shops, dry docks, and piers.
p. Temporary Services General Maintenance:
The Contractor General Maintenance worker duties are primarily industrial and safety housekeeping in nature and may include performance of semi-skilled tasks as specified. Primary duties may include, but are not limited to: sweeping; debris removal; manually removing paint from fasteners or structures; manually moving and transporting furniture, equipment, and materials; physically relocating and temporarily fastening to the overhead—temporary air hoses, electrical cables, and flexible ventilation; and loading and unloading food stores and/or palletized materials from ship to shore and vice versa. Work in confined spaces (tanks/voids), assist in operating pumping stations, work from man lifts or similar Aerial Work Platforms (AWP’s). In addition, work may include lifting and carrying materials weighing up to 60 pounds. Debris may consist of: sheet metal; steel plate; structured shapes; piping; cable ends; nuts; bolts; spent welding wire; hardware; and/or trash.
The Contractor General Maintenance worker shall be qualified and trained to wear required respiratory Personal Protective Equipment (PPE) and fall protection. The Contractor General Maintenance worker shall be qualified to work in confined and enclosed spaces.
Proficiency: Contractor employees should have a general knowledge of industrial operations and be able to perform Trade Skill labor duties and functions when requested. Trade Skill labor duties, for the purpose of this SOW, is defined as having a general knowledge of industrial operations sufficient to perform work task assistance as a second set of helping hands to a skilled trade craftsman and requiring minimal instructions. Duties may include, but are not limited to, tasks such as:
Holding objects for a skilled trade craftsman (e.g., assisting in positioning pipe, structural members, and equipment)
Supplying a skilled trade craftsman with tools and materials;
Installing fastening hardware (e.g., nuts, bolts, washers, etc.)
Operating hand tools (e.g., wrenches to join or fasten equipment and/or materials, etc.) to perform simple tasks of a trade.
Assist in operating pumping systems for dry dock cleaning or bilge pumping support (non- hazardous).
Clean interior tanks, bilges or voids (non-hazardous).
7.4.12. Code 740:
q. Riggers:
The Contractor employee shall have sufficient knowledge of the common and most typical operations of rigging on U.S. Naval Surface Ship and Submarine platforms.
A journeymen rigger should be capable of installation, removal, and repositioning of machinery, structural members of ships or buildings, heavy equipment or other loads. The Contractor shall also be capable of maneuvering loads, bracing, cushioning, preparing, and attaching lifting gear; and installing, beam clamps, and other supporting structures. The Contractor shall be capable of estimating weights and center of gravity of loads to be moved. This process involves planning weight distribution, maneuvering the load and attaching the appropriate lifting gear which includes, but not limited to; chain falls, shackles, chain hoists, synthetic slings, beam clamps and wire rope. Uses complex multipoint suspension techniques to maneuver loads and move objects in confined areas. Knowledge and ability to use proper rigging practices, and safety factors of rigging equipment.
This is the start of the file's text. The full file is on GovTribe.