Statement of Work.pdf

PDF 185 KB Posted

Attached to
USS SAN ANTONIO CALEY BOAT DAVIT Federal contract opportunity
Solicitation number
N5005421Q0111
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a statement of work and related federal contract opportunity notice for the Department of the Navy Naval Sea Systems Command. The statement of work requires the delivery of one davit assembly to be delivered to DLA Distribution Norfolk by February 2, 2022. The contract opportunity is a sole source solicitation for Allied Systems Company to provide the required knuckleboom crane. Interested parties may submit quotes until September 7, 2021. The anticipated period of performance is January 28, 2022. The solicitation incorporates standard FAR and DFARS clauses for commercial item acquisitions.

View the file

Other files for this federal contract opportunity

Other files attached to USS SAN ANTONIO CALEY BOAT DAVIT, newest first.
File Type Posted
Redacted Sole Source_Redacted.pdf PDF
52.212-5 Full Text.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

USS SAN ANTONIO (LPD-17)

WI: 583-11-001

BOAT DAVIT ASSEMBLY

1.0. INTRODUCTION.

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 to be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, Norfolk, VA 23511.

2.0. GENERAL REQUIREMENTS

2.1. The Contractor shall supply and deliver one each the material listed in 2.1.1 complying with the following specifications:

SOW

PARA

U/I QTY NOMENCLATURE REF/DRAWING # PIECE #

2.1.1 EA 1 DAVIT ASSEMBLY S9583-B4-MMC-010 REV 13 N/A

2.2. All material is required to be in accordance with technical manual S9583-B4-MMC-010 REV 13.

2.3. Required Date of Delivery: 02/02/2022

3.0. DELIVERY / ACCEPTANCE

3.1. Delivery shall be made to the following address:

DLA Distribution Norfolk RMC PROJ

Bunker Hill Towaway Bldg. X136

Norfolk, VA 23511

M/F: Mr. Ervin Hubbeard

Mr. Tony Cunningham

3.2 Shipping terms shall be FOB Destination. The product shall be accepted and inspected at FOB Destination. Shipping cost shall be included in the quote.

4.0 MATERIAL SHIPMENT NOTIFICATION

4.1 Notification of date and tracking information to be provided to the following upon shipment of material:

4.1.1 Alison Blair, Allison.blair@navy.mil,, phone (757) 967-6077

4.1.2 Shephard Whitfield, Shephard.l.whitfield.civ@us.navy.mil, phone (757) 967-6076

4.1.3 Dante Ferrer, Dante.ferrer@navy.mil, phone (757) 396-0040 mailto:Allison.blair@navy.mil mailto:Shephard.l.whitfield.civ@us.navy.mil mailto:Dante.ferrer@navy.mil

File details come from the government source that posted it. Updated .