Statement of Work.pdf
PDF 74 KB Posted
- Attached to
- Cadmium Plating
- Solicitation number
- RFISS-174
About this file
This is a Statement of Work for cadmium plating services to support the United States Navy's BST Buoy program through NUWC Keyport. The contractor shall inspect, plate, and finish a total of ten (10) buoy cases in accordance with drawing reference 1845687, with cases to be shipped periodically throughout the contract term. The contractor is responsible for providing all necessary masking and fixtures required to accomplish the plating work and must package materials according to industry standards.
The contract is structured as a not-to-exceed agreement with a base Contract Line Item Number (CLIN) and four (4) option year CLINs. The Government will conduct inspections within 30 days of material receipt at NUWC Division Keyport, utilizing adhesion testing to validate critical requirements including all diameters, locations, and surface finish specifications. The projected turnaround time for deliverables is between 20-30 business days, inclusive of shipping to and from the vendor's location, following notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questionnaire for Industry.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for Cadmium Plating Services
1. Scope:
1.1 Background. In an effort to support the United States Navy customers’ demands, NUWC Keyport is seeking to contract with private party vendors to provide
Cadmium plating services for the BST Buoy program.
1.2 Purpose. This statement of work (SOW) defines the scope of work required to
Inspect, provide Cadmium Plating, and delivery of Buoy Cases shipped from NUWC
Keyport to the vendor.
1.3 Contract Type and Structure:
-This is a not-to-exceed contract
-The contract will be structured with a base Contract Line Item Number (CLIN) and four (4) option year CLINs.
2. Applicable Documents:
2.1 1845687 – Case, Buoy
3. Requirements
3.1 The Contractor shall inspect, plate, and finish a total of ten (10) each Buoy Cases in accordance with reference 2.1
3.2 Cases will be shipped periodically throughout the length of the contract.
3.3 The Government will inspect to confirm critical requirements in accordance with reference 2.1 The Government will use an adhesion test to validate the following critical requirements:
3.3.1 Critical Requirements: Includes all diameters, locations, and surface finish requirements of reference 2.1
3.3.2 The government will inspect within 30 days of receipt of material on NUWC
Division Keyport.
3.4 The Contractor shall package material in accordance with industry standards.
3.5 The contractor shall provide any necessary masking and/or fixtures required to accomplish plating in accordance with this SOW and the referenced drawings/specifications.
Delivery Timeline: Upon receiving notice, the turnaround time for deliverables is projected to be between 20-30 business days, inclusive of shipping to and from the vendor's location.
File details come from the government source that posted it. Updated .