Statement Of Work.pdf

PDF 1 MB Posted

Attached to
FY21 Bldg 2451 Asbestos Abatement Federal contract opportunity
Solicitation number
FA462021QA201
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to FY21 Bldg 2451 Asbestos Abatement, newest first.
File Type Posted
FA462021QA201 - FY21 Bldg 2451 Asbestos Abatement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

CARPET & MASTIC ASBESTOS REMOVAL

BUILDING 2451, Suite 310

TRIRIGA FP: 1015015

October 2020

FA462021QA201

Attachment 1 Statement of Work

Statement of Work (SOW) For

Carpet & Mastic Asbestos Removal Fairchild AFB, WA

1. DESCRIPTION OF SERVICE: The contractor shall provide all necessary tools, equipment and materials required by state, federal, and local laws and regulations to provide clean-up and removal of asbestos containing material (ACM) in building 2451, Suite 310 on Fairchild AFB, WA.

2. SCOPE OF WORK: The Contractor shall complete all work, which includes furnishing all supervision, labor, material, equipment and services, unless otherwise specified herein, required under this contract. All work shall be performed in accordance with all Federal, State, local laws and regulations, manufacturer’s recommendations and this Statement of Work (SOW).

- Contractor shall provide appropriate asbestos certified personnel to properly abate and dispose of asbestos containing materials for approximately 770 sf of carpet and associated carpet mastic in building 2451.

- Contractor shall properly remove carpet and 100 percent of asbestos containing material from the floor surface to reveal the finished concrete floor. Encapsulation is not authorized.

- Asbestos abatement has occurred in this facility within the last calendar year.

- Contractor shall develop a detailed work plan. This work plan shall consist of, as a minimum, the scope and location of work performed, floor plan of the worksite noting locations of asbestos abatement, photographs of the worksite, notification records, air monitoring test records, employee training records, and waste shipment records.

- Contractor shall notify the Spokane Regional Air Agency as required.

- Office furniture and construction debris will all be removed by the government prior to start of work.

- All asbestos removal shall comply with 40 CFR 61 and 763 (U S EPA), 29 CFR 1910.1001

1926.1101, 1910.134 (OSHA), 49 CFR 172-177 (Dept. of Transportation), SRCAA Regulation I Article IX, Washington Administrative Code (WAC) Chapters 296-62 and 296- 65, Department of Labor and Industries regulations, and applicable Air Force Instructions (AFIs).

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES: The government will provide access to utilities as needed. Emergency 911 service is also available. Note that this is not a free service.

4. GENERAL INFORMATION

4.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the written approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with Civil Engineering points of contact.

January 1 New Year’s Day

3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day

November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas

4.2. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations.

5. PERFORMANCE PERIOD: Project shall not exceed 30 days after contract award.

6. APPENDICES:

Appendix A: Facility Floor Plan and Location of Work Area Appendix B: Photos

Appendix A: Facility Floor Plan and Location of Work Area

Appendix B: Photos