Statement of Work.pdf

PDF 206 KB Posted

Attached to
Replacement of Condensate Transfer Pump Controls (Athens, GA)
Solicitation number
1232SA25Q0457
Issued by

About this file

This Statement of Work (SOW) details a construction project for the U.S. Department of Agriculture's Agricultural Research Service at the National Poultry Research Center in Athens, Georgia. The project involves replacing obsolete condensate transfer pump controls in building 2, which includes demolishing the existing boiler control panel, installing a new control panel with specific components (power indicator lamp, disconnect switch, alternating relay, selector switches, pump run lamps, level control probes, control transformer, and output relays), and relocating two existing lift pump starters.

The project requires a contractor to provide all labor, equipment, materials, and supervision to complete the work within 90 days of the notice to proceed. The facility will remain occupied during construction, so work must minimize disruption to daily operations. The contractor must submit a Site-Specific Safety Plan, verify all dimensions, protect the site and existing property, and provide a one-year guarantee on all work. The project is anticipated to be a small business set-aside under NAICS Code 238220, with an estimated value between $25,000 and $100,000, and the Request for Quotation is expected to be issued around August 5, 2025.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture

Agricultural Research Service

STATEMENT OF WORK

Replacement of Condensate Transfer Pump Controls

U.S. National Poultry Research Center 950 College Station Road

Athens, Georgia 30605

1. Scope of Work

The contractor shall provide all professional services necessary to replace the obsolete and failing transfer pump controls located in building 2.

The contractor shall include all services and field labor, equipment (including cranes, rigging and material handling equipment), materials, testing and personal protective equipment necessary to perform the work.

Equipment and services provided by the Government for contractor use are listed below:

- None provided

1.1 Base Bid

The contractor shall provide a detailed proposal and cost breakdown for the entire project including submittals for proposed equipment and materials.

1.2 Site Visit

Contractors are strongly encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.

Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid.

2. Codes and Standards

Applicable Codes and Standards apply and are not limited to the following

ANSI - American National Standards Institute.

ASME - American Society of Mechanical Engineers.

NEC - National Electrical Code, NFPA 72.

OSHA - Occupational Safety and Health Administration ADA – Americans with Disabilities Act

All work must meet Local, State and Federal codes, and latest IBC codes.

3. Project Summary

Replacement of obsolete and malfunctioning controls for condensate transfer pumps.

Relocation of existing lift station pump starters.

1) Demolish existing boiler control panel to housekeeping pad and install with new control panel on strut framework.

2) The new panel will have the following installed:

a. Power indicator lamp

b. Disconnect switch

c. Alternating relay

d. Selector switch for manual lead pump select, alternating and backup pump operation modes.

e. Selector switch (1 / 2) for lead pump

f. Pump run lamps (3)

g. Warrick Level control and probes. (Locate proves in existing electrode location at deaerator tank)

h. Control transformer

i. Output relays (3)

3) The system will operate in one of three modes:

a. Sequence of operation, mode switch set in Auto:

Pumps 1 and 2 are operational. As the water level in the deaerator drops below minimum, the lead pump will start. When the water level reaches the upper limit, the pump will stop and the lead will alternate.

b. Sequence of operation, mode switch set in manual:

Operating pump is determined by lead select

As the water level in the deaerator drops below minimum, the selected pump will start.

When the water level reaches the upper limit the pump will stop.

c. Sequence of operation, mode switch set in backup:

As the water level in the deaerator drops below minimum, the backup pump will start.

When the water level reaches the upper limit the pump will stop.

4) Install 3 new circuit breakers in existing panel to feed new, non-fused combination starter/disconnects for each of the three existing transfer pumps. Each starter will have self-contained 120V control transformer and will be equipped with electronic overloads, HOA switch and run indicator lamp.

5) Relocate two existing lift pump starters from pit area to main floor level.

The facility will be occupied during construction activities. All work shall be scheduled in advance and coordinated with the facility representative to minimize system downtime, the disruption to traffic, daily operations and research programs. Special approval is required for system outages.

6) Safety

The contractor will submit a Site Safety Specific Plan (SSSP) in industry recognizable format to the Contracting Officer within 14 days of contract award. The Government shall review the SSSP prior to the start any construction activities.

Safety and health matters, as they relate to the work, are the exclusive responsibility of the contractor.

The contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions that may be required by law or local authorities for the protection and security of the grounds, facilities, and personnel.

7) Contractor Requirements

The contractor shall provide a complete and func onal installa on, including all labor, supervision, tools, materials, equipment, apparatus, transporta on, rigging and other equipment and services necessary to accomplish the work in accordance with the intent and meaning of this statement of work.

The project work shall be performed per the following guidelines:

1) Contractor will verify all dimensions and site conditions prior to beginning work.

2) The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees.

3) Contractor shall remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site weekly.

4) Contractor is required to manage the project and consult with the Government prior to beginning all work.

5) Contractor shall perform work in a manner that minimizes the impact to daily opera ons of the facility and its workers. The building will be occupied during construc on work.

6) All work is to be performed according with building codes, ordinances and laws of the Authority having jurisdiction on the project. When the requirements of the building codes, ordinances, and laws conflict with any other part of the building codes, ordinances and laws, the most restrictive requirement shall prevail.

8) Material Submittals

Submittals and O&M documentation must be provided for all materials used on this project.

9) Pre-Construction Submittals

Contractor’s Site Specific Safety Plan (SSSP) must be provided to and approved by USDA before installation can begin.

10) Damage to Property:

The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired to pre-damaged condition to the satisfaction of the USDA.

11) Inspection and Acceptance A government representative shall inspect and approve the work. The Contractor shall schedule inspection a minimum of 2 days in advance.

12) Period of Performance

The completion of this project shall not exceed 90 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.

a. Work Hours:

Generally, contractor work hours shall be Monday through Friday, 7:00 A.M. to 4:30 P.M. except on Government holidays for most of the installation work. Tie-in or other work requiring outages will be performed after hours (pre-arranged at least 48 hours in advance).

Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to the schedule change.

13) Guaranty

The contractor shall provide and submit a single guarantee stating that all portions of the work are in accordance with Contract requirements. Guarantee all work against faulty and improper material and workmanship for a period of one (1) year from date of final acceptance by the USDA, except where manufacturer guarantees or warranties are for longer terms. The contractor shall correct any deficiencies which occur during the guarantee period within 24 hours after notification.