This Statement of Work details electrical circuit installation requirements for a shredder power upgrade at a Department of the Air Force facility. The contractor must install two electrical circuits in a warehouse room: a 480-volt, three-phase, 30-amp circuit and a 120-volt, single-phase, 30-amp circuit. These circuits will be fed from two separate electrical panels (EHB and ELB) located in the same mechanical room.

The contractor's responsibilities include running appropriate gauge wiring, protecting wiring with conduit or raceways, installing correct receptacles, ensuring overcurrent protection, implementing proper grounding, and conducting post-installation testing. Additional contract requirements mandate conforming to safety standards, disposing of waste generated during work, removing refuse from the project site, and being liable for any damage resulting from improper installation. The document specifies that the Government will provide the equipment to be serviced and necessary working space with power outlets.

View the file

Other files

File Type Posted
Site Visit information.pdf PDF
Combo.pdf PDF
Combo.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .