This Statement of Work outlines NIST's requirement for one optical table (60" x 72" x 12") to support semiconductor measurement science and metrology under the CHIPS Act. The table will house a Super High Resolution Darkfield Scattering-Confocal Raman Microscope for detecting nanoparticles at extremely low concentrations.
The contractor must deliver and install the optical table at NIST's Gaithersburg, MD facility within 60 calendar days of award. Key technical specifications include imperial mounting holes with 1" grid, ferromagnetic skins, vibration isolation legs with SLAS technology, multiple damping systems, and a maximum payload of 2,390 lb. Installation requirements include uncrating, rigging, setup, demonstration of specifications, and trash removal. The contractor must provide a minimum one-year warranty after installation. Payment will be made in full (100%) after successful installation, testing, and demonstration that the system meets requirements. No partial shipments or invoices are allowed without prior approval from the Contracting Officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CSS Optical Table.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Title: Optical Table 60" x 72" x 12", Lab: Materials Measurement Lab (Div 643.03)
I. BACKGROUND INFORMATION
The semiconductor supply chain is global, specialized, and interconnected. Chipmakers do business with thousands of individual suppliers that provide the highly complex materials and tools used to produce semiconductors. To address the lack of full visibility into the semiconductors markets supply chain and R&D ecosystem gaps NIST will conduct the measurement science, or metrology, critical to the development of new materials, packaging, and production methods in chip manufacturing.
In response to the grand challenge 1 of the Chips Act, NIST is developing measurement methodologies for detection and identification of very low concentration of nanoparticle contaminants at extremely low concentration regimes. In this regard, we are purchasing an optical table that will house a Super High Resolution Darkfield Scattering-Confocal Raman Microscope for detecting nanoparticles down to few nanometers in size. An optical table minimizes the mechanical noises from the environment or caused by the instrumentation. It enables a nearly noise-free optical microscope for performing highly sensitive measurements on single nanoparticles.
II. PURPOSE
The Contractor shall deliver a quantity of one (1) optical table, inclusive of FOB Destination delivery, installation, and warranty.
III. MINIMUM REQUIREMENTS
The Contractor shall provide a system that meets all technical specifications identified below. All items must be new. Used or remanufactured equipment will not be considered for award. Experimental, prototype, or custom items will not be considered.
The use of “gray market” components are not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.
Line Item 0001:
Description: Optical Table Quantity: 1
A. Technical Specifications
a. Optical Table, 60" x 72" x 12",
b. Imperial mounting holes with 1" grid of 1/4-20
c. Ferromagnetic skins with black anti-reflective finish
d. Vibration Isolation Legs. Set of Four. Vibration Isolation with SLAS (Self-
Leveling Air Spring) technology.
e. Broadband Damping: Constrained layer core, damped working surface and composite edge finish
f. Tuned Damping: Narrowband Precision Tuned Dampers
g. Active Damping
2 | P a g e
h. Working Surface: 0.13 in. or thicker 400 series ferromagnetic stainless steel
i. Surface Flatness: ±0.004 to 0.012 in. over 2 ft. square
j. Mounting Hole Pattern: 1 in. grid
k. Mounting Hole Borders: 0.5 in.
l. Alphanumeric Grid Labels: Yes
m. Hole Sealing Type: Easy clean non-corrosive high impact polymer conical cup, 0.75 in. deep
n. Horizontal Isolation, Res.: 1.9 Hz
o. Horizontal Amplification at Resonance: 12.5 dB -Horizontal Isolation, 5 Hz:
80% -Horizontal Isolation, 10 Hz: 94%
p. Maximum Payload: 2390 lb
q. Maximum Air Pressure: 85 psi
IV. SCHEDULE OF DELIVERABLES
Deliverable
Number Description Quantity Due Date
Place of Delivery 1 Optical Table 1
No later than 60 calendar days after receipt of order.
NIST (Gaithersburg)
2 Delivery and Installation
1 No later than 60 calendar days after receipt of order.
NIST (Gaithersburg)
PLACE OF PERFORMANCE
Work (Installation of the table) will be performed on the Government site at NIST, Gaithersburg, Maryland. Normal duty hours are Monday through Friday, 8:30 a.m. to 5:00 p.m. with the exception of Federal holidays and NIST closures.
V. DELIVERY TERMS
Delivery shall be F.O.B Destination (or equivalent incoterms, such as DDP) and shall occur in accordance with the delivery due dates provided in the below table.
FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery.
The contractor shall deliver all Line Items to:
National Institute of Standards and Technology
3 | P a g e
100 Bureau Drive Gaithersburg, MD 20899 C/O/ POC/COR (TBD, BLDG 217, Lab C112, Office, B103)
VI. INSTALLATION
The system shall be delivered and installed by the Contractor and meet contract specifications no later than 60 calendar days after award. Installation, at a minimum, shall include uncrating/unpackaging of all equipment, rigging, set-up and hook-up of the system, demonstration of all specifications, and removal of trash. Onsite installation and demonstration shall be done at NIST (Gaithersburg, MD- Building 217).
VII. INSPECTION & ACCEPTANCE
In addition to the inspection and acceptance terms articulated in the FAR, the Government reserves the right to perform such performance tests and evaluations as defined in the technical specifications of the optical table to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
NIST may choose at its discretion to forego this part of acceptance testing.
A visual inspection of the equipment will be performed by the NIST DGO to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.
Ownership of the equipment shall transfer to NIST upon acceptance by the Government.
The Government will test, inspect, and accept or reject the equipment within 14 working days of the receipt of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.
VIII. WARRANTY
The contractor shall warranty the entire system for a period of a minimum of one year after installation of the equipment and shall be in accordance with terms in FAR 52.212-
4. Warranty shall commence upon acceptance of the system by the Government.
4 | P a g e
IX. PAYMENT SCHEDULE
The Contractor will be paid, in accordance with the payments clause in the contract and as otherwise noted in this document, upon receipt of a proper invoice:
1. 100% after installation and acceptance by the POC of fully installed system, AND
2. After the successful completion of the testing requirements set forth in this document under section set forth in this document, AND
3. After successful demonstration by the instrumentation that it performs in accordance with the requirements set forth in this document
NOTE: Partial shipments and partial invoices will not be accepted, unless otherwise requested and accepted by the Contracting Officer prior to award offer.
Proposed payment schedules shall be submitted with vendor’s response to the RFQ for consideration.
X. CYBERSECURITY PRIVACY REQUIREMENTS
NIST seeks a solution that provides security and privacy protection consistent with requirements defined by applicable federal laws, regulations, policies, and standards (e.g., the Federal Information Security Management Act (FISMA), OMB Circular A-130, and FIPS Publication 200). The solution provider (including subcontractors) may meet these requirements through various means, including but not limited to FedRAMP authorization, current third-party assessments (e.g., SSAE, PCI), and/or responses to NIST special publication control set SP 800-171.
Minimally Acceptable Controls
• System security plan describing physical, technical, and administrative controls implemented to protect systems and sensitive personally identifiable information
(SPII).
• IT management processes to establish and manage secure configuration baselines including routine patching for all operating systems and applications.
• Access to SPII is restricted to those with a need to know. Personnel with access to SPII have background investigations performed (e.g. criminal, financial etc.), and are trained on secure handling of SPII.
• Access Controls for SPII meet or exceed industry best practices for access and identification control including, but not limited to, connectivity to servers and databases, multi-factor authentication for remote accesses for administration, secure configurations for any devices accessing the system, and strong physical security for any place where the data is accessed.
• The solution supports multifactor authentication for users and/or supports integration with customer federation services for Single-Sign capability.
5 | P a g e
• Processes for scanning on a continual basis for vulnerabilities and proper configurations for all aspects of the system, as well as processes for timely mitigation of findings.
• Auditing and Incident Response processes including customer notification of suspected or actual incidents and logging with sufficient information to perform forensics on any incident. Processes for notifying and providing appropriate mitigations, including but not limited to credit monitoring services, for subsidy applicants in the event of suspected or actual incidents.
• SPII is encrypted in transit using TLS 1.2 or better and encrypted at rest in all places the SPII is stored. All encryption algorithms and modules are FIPS 140- 2/140-3 validated.
If unable to meet any of the requirements listed above, the solution provider may provide details of mitigations or alternative protections in place to ensure the appropriate handling and protection of SPII.
If the solution provider provides services to other Federal agencies, provide a general description of the security risk management approach and client point of contact.
XI. REQUIREMENTS FOR CONTRACTOR PERSONNEL
Safety: The Contractor employee must be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.
Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and is shown to the armed Security Police when entering the campus.
Identification Badges: Contractor employees must comply with NIST identification and access requirements. Each Contractor employee must wear a visible identification badge provided by the NIST Security Office.
Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued.
The pass must be displayed on the vehicle in accordance with NIST Security Office instructions.
Media Inquiries: The Contractor shall not respond to any media inquiries. Any inquiries from the media shall be immediately relayed to the NIST COR and/or Contracting Officer (CO). There shall be no interviews, comments, or any other response without the knowledge and approval of the NIST COR or Designated Government Official.
File details come from the government source that posted it. Updated .