Statement of Work.pdf

PDF 114 KB Posted

Attached to
DSA - Oregon Road FD-2
Solicitation number
6100037658
Issued by
Fulton County, Mcconnellsburg Borough, Pennsylvania

About this file

This document is a Statement of Work for a contract opportunity issued by the Commonwealth of Pennsylvania, Department of Conservation and Natural Resources, Bureau of Forestry, Buchanan State Forest, to deliver, paver-place, and roll approximately 3,400 tons of limestone DSA (driving surface aggregate) on Oregon Road in Fulton County. The project is to begin at the intersection with SR 915 and proceed south for about 3 miles. The work must be completed as soon as possible in favorable conditions, but no later than June 15, 2016. Bidders must complete the electronic Invitation for Bid and submit a properly executed DCNR-Bureau of Forestry DSA Certification Form stating the surface material meets the required criteria. Bids will be awarded based on the lowest total sum.

Payment will be made upon satisfactory completion of the project for actual services performed, which includes meeting the DSA aggregate specification. Bids must be submitted via the PA Supplier Portal, and no faxed or mailed bids will be accepted. Bidder can obtain bid results by accessing the emarketplace.state.pa.us website, where the apparent bidders and all bids under review will be posted the morning following the bid opening.

View the file

Other files

File Type Posted
Project Map.pdf PDF
DSA Certification Form.pdf PDF
Terms and Conditions.pdf PDF
GSPUR-89 Reciprocal_Limitations_Act_Reqirements.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 28, 2014

STATEMENT of WORK

DELIVER and PAVER-PLACE AGGREGATE

Oregon Road

FOREST DISTRICT 02

FULTON COUNTY

I. SCOPE OF WORK:

The Commonwealth of Pennsylvania, Department of Conservation and Natural Resources, Bureau of Forestry, Buchanan State Forest, McConnellsburg PA, requires services to deliver, paver-place and roll approximately 3,400 tons of limestone DSA (driving surface aggregate), to the State Forest, Oregon Road in Wells Township, Fulton County. Project is to begin at the intersection with SR 915 and proceed south for about 3 miles.

Questions regarding the technical aspects of this bid should be directed to Bryan S. Wilford at

717-485-3148, or Jason Hall at 717-787-3706. Questions regarding the bidding or contractual aspects of this bid should be directed to Steve Brown at 717-783-3309.

II. CONTRACT TASKS:

The following tasks shall be completed in performance of the contract:

Project is to be completed as soon as possible in favorable conditions, as determined by the

District Forester, but not to exceed June 15, 2016.

Delivery

A properly executed DCNR-Bureau of Forestry DSA Certification Form (attached) is to be provided at the time of initial delivery and subsequent certification forms should quarry conditions change. This Certification Form is to apply to the specific stockpile of

DSA material being delivered from the Vendor’s source. The form certifies that the DSA material meets all of the specifications and requirements referenced below.

Upon receipt of a Purchase Order, vendor shall begin delivery upon five days advance verbal notification.

Forest district staff, and/or their designated representatives, shall perform quality assurance / quality control visits to the quarry to inspect the DSA for the project. This may include the testing of the DSA by DCNR, and/or their designated representatives.

The Vendor shall provide transportation or escort the staff to the DSA load site over the duration of the project.

Delivery shall be at a rate of 1,600 tons per day.

No material is to be delivered before 7:30 a.m. or after 5:00 p.m.

All trucks must be driven by individuals capable of placing material in a paver.

Delivery shall continue on an uninterrupted basis.

Material

All material must be certified to not degrade the environment nor create health hazards.

Aggregate must originate from a PennDOT qualified quarry source.

Wearing course material must be structurally durable so that weathering and traffic loads do not result in creation of dust, sediment or pollution.

All driving surface aggregate is to be derived from natural stone formations.

Stone is defined as rock that has been crushed; rock is defined as consolidated mineral matter.

For use in this program, both are restricted to that which has been mined or quarried from existed geologic bedrock formations.

All components of the aggregate mix are to be derived by crushing parent rock material.

Vendors must provide a properly executed DCNR-Bureau of Forestry DSA

Certification Form (attached) at the time their bid is submitted committing that they can provide DSA material that meets the following criteria.

The required amounts and allowed ranges, determined by weight, for various size particles are:

Passive Sieve Lower % High %

1 ½ inch 100% ---

¾ inch 65% 95%

#4 30% 65%

#16 15% 30%

#200 10% 15%

The fines passing the #200 sieve must be rock material. No clay or silt soil may be added. Limestone material passing the #200 sieve may be used to make up a deficit in the distribution of sandstone aggregate rock, and vice versa. All added material passing the #200 sieve must be derived from rock material that conforms to program specifications. Lime kiln dust and cement kiln dust may be added to DSA to account for up to 50% of the fines passing the #200 sieve. The amount of particles passing the #200 sieve shall be determined using the washing procedures specified in PTM No. 100.

LA Abrasion Less than 40% passing. Los Angeles Abrasion test, AASHTO T-96

(ASTM C 131) shall be used to determine this property.

The Plasticity Index (PI) of the DSA shall be a maximum of 6. The laboratory test required for these results is the ASTM D4318 – Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.

Aggregate must be within the range of pH 6- pH 12.45 as measured by EPA 9045C.

Material is to be delivered and placed at optimum moisture content (+/- 1%) as determined for that particular source. The optimum percentage moisture is to be determined using Proctor Test ASTM D698, procedure C, Standard.

Tarps are to be used to cover 100% of the load's exposed surface from the time of loading until immediately before dumping, including standing time waiting to dump.

Placement and Rolling

DSA is to be placed using a track mounted paver capable of spreading stone to a width of 12 to 18 feet in a single pass and creating a ½ inch/foot (4%) crown in the surface.

Material shall be placed in a single 6-inch loose lift. This lift is to be compacted with a two steel drum vibratory roller as specified.

A minimum of 4 employees of Vendor must be present during placement. Three of these employees must be operating the paver at all times during placement activities.

After placement, the material is to be compacted by the Vendor to an average finished depth of 4 inches using a minimum ten-ton vibratory roller capable of vibrating to a force of 20 tons. The initial pass across the road surface with the roller must be made using the static mode and then apply the vibratory mode. DSA material shall be compacted to a minimum of 95% of the dry-mass (dry-weight) density, determined according to ASTM D698, procedure C, Standard. DCNR, through its designated representative, will determine the in-place density according to AASHTO T310.

The surface of the road is to average 14 feet in width and to be crowned to DCNR's specifications.

Use of Roads

The Department of Conservation and Natural Resources does not guarantee the successful vendor the use of roads maintained by the Pennsylvania Department of

Transportation (PennDOT), townships, or other agencies or owners. Vendor must contact the PennDOT posted highway coordinator and officials of other said roads for possible weight or other restrictions that would prevent or restrict use. Vendor will be responsible for obtaining all necessary Road Use Permits and/or any associated Bonds from the PennDOT, townships, or other agencies or owners. Vendor will be responsible for all traffic control issues required by PennDOT, where leaving and entering State

Routes and while working at the intersections of SR915 and Oregon Road and possibly

SR30 and the Oregon Road.

IV. CONTRACT TERM:

Contract shall commence upon receipt of Purchase Order and terminate June 15, 2016.

V. BID AWARD:

Bidder shall complete and return the following for award of bid:

Bidder shall complete the electronic Invitation for Bid to be found at www.pasupplierportal.state.pa.us, and A properly executed and signed DCNR-Bureau of

Forestry DSA Certification Form (attached) stating the surface material DSA meets the required criteria, for award of the bid, and Page 3 of attached Reciprocal Limitations Act

Requirements (State of Manufacture Form).

Bids will be awarded based on lowest total sum.

Note: The Department will only accept out to two (2) decimal points when entering your bid.

Quantities are estimated and may increase or decrease depending on the needs of the Department.

http://www.pasupplierportal.state.pa.us/

Contractor shall be paid for actual quantities used.

VI. PAYMENT TERMS:

Payment shall be made upon satisfactory completion of project for actual services performed, which includes meeting the DSA aggregate specification.

VIII. RECEIPT AND OPENING OF BIDS:

A. Bids must be submitted via the PA Supplier Portal, to be found at www.pasupplierportal.state.pa.us. Faxed bids and mailed bids will not be accepted.

B. No responsibility will be attached to any employee of the Department for the premature opening of, or the failure to open, a bid not properly addressed and identified, or for any reason whatsoever.

IX. SERVICE SLIPS:

To insure prompt payment, the Contractor must provide a service slip(s) to the District Office after the completion of the project.

X. INVOICES:

All invoices for this contract MUST be sent to the following address:

Commonwealth of Pennsylvania – PO Invoice

PO Box 69180

Harrisburg, PA 17106

All invoices MUST have the Purchase Order Number, as well as your SAP Vendor Number, on the invoice. Failure to provide this could result in a delay of your payment.

XI. BID RESULTS:

Bidder can obtain bid results by accessing www.emarketplace.state.pa.us. The bids will be posted the morning following the bid opening. The results are the apparent bidders and all bids are under review until final award of the purchase order.

Attachments http://www.pasupplierportal.state.pa.us/ http://www.emarketplace.state.pa.us/

File details come from the government source that posted it. Updated .