STATEMENT OF WORK.pdf

PDF 89 KB Posted

Attached to
HIGH VOLTAGE POWER SUPPLIES Federal contract opportunity
Solicitation number
80NSSC248831
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This document is a Statement of Work (SOW) that outlines the requirements for NASA/NSSC to acquire high voltage power supplies. The SOW specifies the quantity, model numbers, voltage, current, and other technical characteristics of the required power supplies. It indicates that the vendor, Sager Electronics, has a lead time of 11 weeks for out-of-stock items, with a total delivery timeline of up to 12 weeks after receipt of order.

The related federal contract opportunity is a pre-solicitation notice for these high voltage power supplies. NASA/NSSC intends to issue a sole source contract to Sager Electronics, as they are the only provider of the required and compatible supplies. The procurement will be conducted under the commercial item and simplified acquisition procedures of FAR Parts 12 and 13. The NAICS code for this requirement is 334516. Interested organizations have until 8/8/2024 to submit their capabilities and qualifications for consideration of a competitive procurement.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Provide high voltage power supplies as enumerated below.

2. Characteristics, Scope, and Specs

The vendor shall supply the following fast high voltage supplies:

QTY 1 MODEL 609E-6-L-CE, aka TK-12297LR, 100/115V (LINE), ±4kV, 20mA High Voltage Amplifier QTY 1 MODEL 10/10B-HS-L-CE, aka TK-12563LR, 100/115V (LINE), ±10kV, ±10mA HV Amplifier QTY 4 MODEL 2220-CE, aka TK-12561R, ±2kV @ ±10mA DC / ±20mA peak AC High-Voltage Amplifier

3. Place of Performance N/A

4. Period of Performance Vendor quotes factory lead time of 11 weeks for out-of-stock items. Vendor indicates that delivery time after receipt of order can be as much as factory lead time plus transit time, i.e. 12 weeks.

File details come from the government source that posted it. Updated .