Statement of Work.pdf

PDF 351 KB Posted

Attached to
Testing and Inspection of Fire Suppression Systems in Government Housing
Solicitation number
70Z03324QBASEA174
Issued by

About this file

This document is a Performance Work Statement (PWS) that outlines the scope of work for a federal contract opportunity to test and inspect 24 wet fire suppression systems at Triumph Housing in Astoria, OR. The contractor must perform the work in accordance with NFPA 13, NFPA 25, NFPA 72, and local requirements to ensure the systems' functionality and compliance. The contract manager must have full authority to act on the contractor's behalf, and all contractor personnel must have proper identification to access the Coast Guard facility. The work must be performed Monday through Friday, 6 AM to 8 PM, unless otherwise approved. Invoicing must be submitted through the Invoice Processing Platform (IPP).

The associated federal contract opportunity is a Request for Quotation (RFQ) issued by the U.S. Coast Guard for the testing and inspection of the fire suppression systems. This is a 100% small business set-aside with a NAICS code of 238220 and a $19M size standard. Offers are due by 2:00 PM PDT on July 28, 2024, and should be submitted to the Contracting Officer at the provided email address.

View the file

Other files

File Type Posted
FP SVC A.pdf PDF
Wage Determinations Clatsop County.pdf PDF
FP SVC R.pdf PDF
SF1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT – SCOPE OF WORK

U.S. COAST GUARD BASE ASTORIA

SECTION 1 – GENERAL INFORMATION

1.1 Scope of Work

The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform the tasks defined in this Scope of Work (SOW). The contractor must perform to the standards in this contract. Any questions regarding scope of work must be directed to the Contracting Officer assigned to the contract. All requests for site visits must be scheduled through the POC. One key POC, although subject to change, for this contract is: CWO Matthew Piper (cell: 503-369-7797; email: Matthew.L.Piper@uscg.mil) or DCC Chris Barkley (cell: 503-325-0203; email: Christopher.J.Barkley@uscg.mil).

1.1.1 Place of Performance

Triumph Housing Astoria, OR 97103

1.2 Contractor Personnel

1.2.1 Contract Manager

The contractor must provide a contract manager who must be responsible for the performance of the work.

1.2.1.1 The contract manager or alternate(s) must have full authority to act for the contractor on all contract matters relating to daily operation of this contract

1.2.1.2 The contact manager and alternate or alternates must be able to read, write, speak, and understand the English language.

1.2.2 Contractor employees

The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

1.2.2.1 Contactor personnel must present a neat appearance and be easily recognized as contractor employees.

1.2.2.2 The contractor must not employ any person who is an employee of the U. S. Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U. S. Coast Guard unless such person seeks and receives approval according to U. S. Coast Guard regulations.

1.2.3 Security requirements

Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this SOW, while onboard a Coast Guard facility, shall have proper valid identification. Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition.

1.3 Hours of Operation – Projected Date of Completion

1.3.1 The contractor must perform the tasks as required by the SOW under this contract during the following hours:

Monday through Friday between 06:00am and 8:00 pm unless other time is specified.

1.3.2 Holiday: not applicable to this contract.

1.3.3 Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required in section 1.3.1 above, the contractor must request same in writing.

Submit written request to the POC (see Section 1.1 above) a minimum of 24 hours before the requested adjusted work schedule. If the desired schedule change is to be effective on a Monday, the request must be submitted to the POC prior to 9:00am on the Friday prior to commencement of work.

1.4 Invoicing

In conjunction with the subject award, proper invoices will be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov/. IPP is a secure web-based electronic invoicing system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis (FRSTL). IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.

Actions to take:

If you are already enrolled in IPP:

If your company is already registered to use IPP, you will not be required to re-register and you do not need to contact

IPP.

If you are NOT already enrolled in IPP:

The point of contact you provided in your SAM.gov registration will receive two emails from ipp.noreply@mail.eroc.twai.gov. Please note that emails from this email address may filter into your spam or junk folder:

1. The first email will have the IPP Logon ID and a link to the IPP application.

2. A second email, which will be sent within 24 hours of the first email, contains a temporary password.

Once your contact receives these emails, please ensure they log into IPP and complete the registration process.

Once registered to use IPP, your company may submit invoices electronically, receive e-mail notifications when requests are paid, view payment history, and access remittance downloads. The e-mail notification of payment is sent when a payment is distributed to your bank account and may include the following payment information: Date of payment, dollar amount, invoice number, paying agency, payee name, and ACH trace number.

Vendor training materials, including a first time login tutorial, are available on the https://www.ipp.gov/ website. Once you have logged in to the IPP application, you will have access to user guides that provide step-by-step instructions for all IPP capabilities, ranging from creating and submitting an invoice to setting up email notifications. Live webinars are held monthly and provide a great opportunity to learn the basic of the system and to call in and ask the IPP team questions about the IPP application.

IPP Customer Support is available to assist users of the system and can answer your questions related to accessing IPP or completing the registration process.

Toll-free number: 866-973-3131 Email address: IPPCustomerSupport@fiscal.treasury.gov Hours of operation: Monday through Friday (excluding bank holidays) from 8:00 am - 6:00 pm ET

SECTION 2 – DEFINITIONS

2.1 General Definitions

When the (SOW), solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulations (FAR), the word or term has the same meaning as the definition as contained in section 2.101 of the FAR.

The FAR index is available via the Internet at http://www.acqnet.gov at the end of the FAR, after the FAR Appendix.

2.1.1 Defective Service: A service or commodity output that does not meet the standard of performance requirement specified in the contract for that service or commodity.

2.1.2 Quality Assurance: A planned and systematic pattern of all government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. Quality assurance refers to actions by the government assurance functions for a contracted service.

2.1.3 Quality Control: Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements.

SECTION 3 – GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1 General Information

The Government must provide the facilities, equipment, materials, and services listed here.

3.1.1 Government Furnished Facilities.

3.1.2 Electricity necessary for use by contractor in conjunction with this contract.

3.1.3 Exterior water spigots as necessary for use by contractor in conjunction with this contract.

SECTION 4 – CONTRACTOR FURNISHED ITEMS AND SERVICES

Except for those items, services, or commodities specifically stated in section 3 as government furnished, the contractor must furnish everything needed to perform this contract according to all its terms.

SECTION 5 – SPECIFIC TASKS

The contractor must test and inspect 24 potable water supplied wet fire suppression systems at Triumph Housing.

5.1.1 The contractor shall test and inspect 24 fire suppression systems at the locations listed in section 5.1.2. All work shall be completed in accordance with NFPA 13, NFPA 25, NFPA 72 and the City of Astoria requirements to ensure the functionality and compliance of the fire suppression systems.

5.1.2 Units

987 Culp Ave 993 Culp Ave 983 Culp Ave 997 Culp Ave 943 Culp Ave 947 Culp Ave 953 Culp Ave 957 Culp Ave 963 Culp Ave 967 Culp Ave 973 Culp Ave 977 Culp Ave 923 Culp Ave 927 Culp Ave 933 Culp Ave 937 Culp Ave 883 Culp Ave 887 Culp Ave 893 Culp Ave 897 Culp Ave 903 Culp Ave 907 Culp Ave 913 Culp Ave 917 Culp Ave

SECTION 6 – TESTING AND ACCEPTANCE

6.1 Testing

6.1.1 The contractor must document and certify an operational functionality test on a contractor generated document.

All discrepancies will be noted with location and device number.

6.2 Acceptance

6.2.1 Acceptance on behalf of the government will be made by the POC per Statement of Work.

SECTION 7 – APPLICABLE PUBLICATIONS AND FORMS

Publications and forms that apply to the (SOW) are listed below. The publications and forms have been designated as either mandatory or informational. The contractor is obligated to follow those publications and use those forms designated as mandatory to the extent specified in other sections of this (SOW). The contractor must be guided by those publications or use those forms designated as informational to the extent necessary to accomplish requirement in this

(SOW).

7.1 Publications

7.1.1 Mandatory publications NFPA.

File details come from the government source that posted it. Updated .