Statement of Work.pdf

PDF 289 KB Posted

Attached to
Bldg 457 Roll Up Door Replacement
Solicitation number
FA460024Q0020
Issued by

About this file

This document is a Statement of Work (SOW) for the replacement of a roll up door in Building 457, Room 438 at the 55th Civil Engineer Squadron location. The key objectives are to remove the existing roll up door and motor, and replace it with a Cornell AlarmGuard fire door spiral and new opener and controls, or an equivalent product accepted by the government. The contractor shall provide all required labor, equipment, materials, and services to complete the installation.

The related federal contract opportunity, Solicitation Number FA460024Q0020, seeks quotations for the same work to be performed. Quotations are due by 11:00 AM CDT on June 21, 2024. The agency is the Department of the Air Force Air Combat Command. No site visit is currently scheduled, but offerors can request one by emailing the provided contacts. The contract will include a 1-year warranty on all parts and labor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

55th Civil Engineer Squadron

Statement of Work Date: 19 April 2024 TRIRIGA Project #13251358 Project Title: B457 Replace Rm 438 Roll Up Door

GENERAL REQUIREMENTS:

Project includes, but not limited to the following work elements. The contractor shall furnish all labor, equipment, materials, services, and incidentals. No alterations, additions, or deletions shall be made unless by prior approval of the Project Manager and the government Procuring Contracting Officer (PCO). Work shall be completed in a neat, substantial, and competent manner. Ensure all replacing meets federal regulations for safety standards. The project’s base bid is located in B457 Rm 438 roll up door.

OBJECTIVES: To remove existing roll up door and replace with Cornell AlarmGuard fire door spiral to include new opener and controls or equivalent accepted by the government. The Contractor shall furnish all required services, labor, tools, materials, and equipment necessary to complete the project. The scope is limited to B457 Rm 438 roll up door. The Contractor shall be responsible for the following actions:

1. REMOVAL Rm 438 Roll Up Door The Contractor shall provide all personnel, equipment, tools, supervision, administration, lifts, and services necessary to remove the following in B457 Rm 438

• Roll up door

• Motor and controls

2. Install new Cornell AlarmGuard fire door 8’1” X 10’9” or equivalent accepted by the government.

The Contractor shall provide all personnel, equipment, tools, supervision, administration, lifts, and services necessary to remove the following in B457 Rm 438

• 20Ga. Slats, grey galvanized finish.

• Light grey polyester finish on curtain slats, all other parts powder coated.

• Inside face of wall mount to steel jambs.

• Test for proper installation and operation.

• Provide additional slats to customer (Min.5)

• Provide customer all O&M manuals and Warranties.

• Contractor will verify door dimensions on site.

3. Install new AlarmGuard fire motor or equivalent accepted by the government.

• AlarmGuard fire motor, 460V 3 Phase, auxiliary chain hoist back up.

• (1) 3 button control and Hood to be 24ga. galvanized with polyester enamel finish.

• Provide All electrical needed, including Mounting of control boxes

• Provide electrical connections and controls connections hook up.

• Test for proper installation and operation.

• Provide customer all O&M manuals and Warranties.

55th Civil Engineer Squadron

Additional General Requirements:

• Ensure all replacing meets federal regulations for safety standards.

• All security requirements must be met to include times of removing and replacing.

• The Contractor shall provide a full 1-year warranty on all parts and labor from date of acceptance by the Government.

• The Contractor shall provide equipment or manufactures warranty for installed equipment at date of acceptance by the Government.

• The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. In addition, the Contractor shall be responsible for the following actions:

a. Obtaining all necessary security and safety clearances for facilities and personnel. This includes obtaining escort badges necessary for unaccompanied work within the area.

b. Obtaining necessary certifications for installation equipment and technologies to be installed.

c. Obtaining environmental and life safety approvals if required

d. Acquire all necessary federal, state, local and base environmental and civil engineering permits, and approvals.

f. Cleaning-up and restoring the site to its original or better condition within 10 workdays after project completion. This includes removal of any portable offices that may have been used to support implementation of the site design at the base.

g. Repairing damage to Government property resulting from contractor activities, assuring the property is returned to its original or better condition.

h. Removing all debris at the end of each shift or more frequently if required to keep the work area safe and useable.

i. Disposing of excess equipment and materials in accordance with General Requirements.