Statement of Work.pdf

PDF 163 KB Posted

Attached to
Electric aircraft tug to move skidded LUH-72/EC145 helicopters
Solicitation number
W912L6-20-R-0099
Issued by

View the file

Other files

File Type Posted
Combined Synopsis Solicitation Helicopter Tug.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver: Mar 2013

Statement of Work (SOW)

1. INTRODUCTION: The Army Aviation Support Facility #2 in Tulsa, OK requires an electric aircraft tug to move skidded LUH-72/EC145 helicopters into and out of the hangars for maintenance and storage during inclement weather.

2. BACKGROUND: The current system for moving skidded aircraft at AASF #2 is inefficient, dangerous and has caused multiple near miss incidents in the past 3 years. The same relies upon wheels strapped to aircraft skids and a tow bridle. The straps have broken during towing operation causing safety concerns with the current system.

3. SCOPE: The contractor shall provide support a fully functioning electric aircraft tug capable of independently moving the LUH-72/EC145 helicopter under the tugs power. The tug must be able to lift the aircraft via the cross tubes and must be wireless remote control capable.

4. REQUIREMENTS: The contractor shall provide a tug capable of meeting the below salient features.

4.1. Provide the below listed product

Item QTY Electric Tug 1

4.2 Salient Features – The provided electric tug must meet the requirements below

Capable of independently lifting the LUH-72/EC-145 Capable of moving aircraft with a towing weight of up to 8000 lbs Capable of lifting aircraft via helicopter cross tubes Capable of Lifting of aircraft via scissor lift mechanism Electrically powered with independent driving capability Must be able to be controlled via wireless remote control Must have siped tires to drive over 1 inch grates Lifting mechanism must be a scissor style lift

5. DELIVERABLES:

Description Reference Delivery Date

LUH Electric Tug 4.2 Within 30 days of contract award.

6. DELIVERY POINT:

Ver: Mar 2013

Army Aviation Support Facility #2 Attn: Facility Commander 4242 N. Mingo Valley Expressway Tulsa, OK 74116 Email tyler.m.sharpe.mil@mail.mil Telephone: 918-832-6505

File details come from the government source that posted it. Updated .