STATEMENT OF WORK.pdf

PDF 81 KB Posted

Attached to
RELIEF VALVE Federal contract opportunity
Solicitation number
80NSSC242432Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This statement of work outlines requirements for a liquid nitrogen relief valve vent line project. The selected vendor will be responsible for replacing four relief valves with new REGO models and fabricating and installing piping to route the valve outlets to a common vent line header in the ceiling. This will include installing REGO pipe away adapters on the new valves, running 3/4-inch tubing from each, constructing a 2-inch header, and penetrating an exterior wall. Delivery of the relief valves is estimated at 8 to 10 weeks.

The related federal contract opportunity is a solicitation issued by the National Aeronautics and Space Administration Shared Services Center seeking a contractor to provide the relief valve vent line project described in the statement of work.

View the file

Other files for this federal contract opportunity

Other files attached to RELIEF VALVE, newest first.
File Type Posted
QUESTIONS AND ANSWERS.pdf PDF
80NSSC242432Q.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Liquid Nitrogen Relief Valve Vent

Scope of Work:

The vendor shall provide the labor, material, components, and equipment required to fabricate and install a new relief valve vent line header as noted below:

1) Replace TSV-11, TSV-12, TSV-14 & TSV-15 Relief Valves

a. Replaced with REGO Part #PRV29434TP150, install with REGO “candy cane” riser tube per manufacturer recommendations

2) Install REGO pipe away adapters onto the outlet of the new relief valves

3) Fabricate and install 3/4” tubing from all 4 Relief Valve outlets to a common vent line header installed in the ceiling.

4) Fabricate and install 2” Pipe header and route to exterior of building

a. Wall penetration to be performed by others.

b. Piping to be supported by Unistrut and allthread.

Delivery (relief valve): 8-10 weeks