This statement of work outlines requirements for a carwash materials installation project at Offutt Air Force Base. The contractor shall remove the existing carwash system and install a new system including a 3 HP 460 volt cold water pressure washer, hot and cold water solenoid valves, detergent solenoid, remote switch box, constant flow heaters, detergent line, water softener, switch wiring, undercarriage cleaners, connection hoses, stainless steel tubing, and miscellaneous installation supplies. The contractor must perform all work in accordance with factory specifications and commercial standards to ensure the upgraded carwash is fully functional. The government will conduct pre-final and final inspections prior to completion. The related federal contract opportunity is a pre-solicitation for carwash materials and installation through the Department of the Air Force Air Combat Command.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

55th Logistics Readiness Squadron

Offutt AFB Government Vehicle Carwash

Location: Within Building 301D between Entrance 6 and 7

Period of Perormance: All work shall be done by the contractor.

Schedule: Contractor will be asked for an estimated timeframe for completion.

Materials may take up to 3 weeks to receive. Once materials are received installation will take 1 to 2 weeks to complete.

Work Included: Contractor shall perform the following:

1. Remove existing system

2. Install new system

3. Install remote switch box

4. Provide detergent for operation

Workmanship: Contractor shall perform all work in accordance with factory specs, ensuring upgraded Car Wash is fully functional. Contractor shall perform all work in accordance with all local, state, and federal laws, regulations and codes. Contractor is responsible for all measurements. All work shall be done in accordance with all existing commercial standards/factory specifications.

Disposal: Contractor will dispose of any unneeded or previous materials.

Inspections: Government will perform pre-final and final inspection prior to completion of work.

Materials and Equipment:

ITEM/SERVICE DESCRIPTION Qty. Unit Cold water pressure Washer 3 HP motor, 460 Volt 3 phase. 4 GPM @ 1,200 PSI w/ shut down timing system

3 Each

Hot and Cold Water solenoid valves 3 Each Detergent Solenoid 3 Each Remote Switch box (Pump, Burner and Detergent) 3 Each Constant Flow heaters 3 Each 50-ft of ¼-inchdetergent line 1 Each Detergent (550 gallons) 1 Each 48,000 grain water softener 1 Each

250-inches of switch wiring 1 Each Under carriage cleaners 3 Each 12-ft connection hoses 6 Each 250-feet of ½-inch stainless steel tubing for high pressure 1 Each Miscellaneous installation supplies 1 Each Removal of existing system and installation of new system 1 Each

Project Coordinator: