STATEMENT OF WORK.pdf

PDF 94 KB Posted

Attached to
THREE MICRO PULSE LIDAR ENCLOSURES AND ONE ENCLOSURE SUN BAFFLE Federal contract opportunity
Solicitation number
80NSSC226094
Issued by
National Aeronautics and Space Administration Shared Services Center

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK FORMAT

Purchase of MPL Environmental Enclosures

PR: 4200816094

Background

The NASA MPLNET project has been in operation since 2000 and collects information on the vertical distribution of atmospheric aerosols and clouds to support the NASA Earth Science research program. The project utilizes specific, commercially available atmospheric lidar instruments manufactured by Droplet Measurement Technologies (formerly Leica Geosystems, and Sigma Space Corporation before that). The lidar instruments are Micro Pulse Lidar (MPL) and mini Micro Pulse Lidar (a smaller, cheaper form factor).

MPLNET deploys these lidar instruments worldwide, and they must be installed inside an environmental enclosure with an observation window for network operations. MPLNET uses all-weather enclosures from Aether Embedded that are designed specifically for the MPL and miniMPL. These meet all our requirements. Here we seek to procure 3 engineering duplicates of the all-weather enclosures with included sun baffles and 1 additional sun baffle for an existing enclosure at NASA.

Scope

Purchase of 3 MPL enclosures Purchase of 1 enclosure sun baffle

Requirements Engineering duplicates of MPL enclosures currently used by the NASA MPLNET project: model MPL24K sold by Aether Emedded.

Deliverables or Delivery Schedule Partial deliveries and invoicing acceptable Delivery of 3 enclosures and 1 additional sun baffle. In addition, delivery of standard manuals and related cables and assembly hardware for all equipment

Government-Furnished Equipment and Government-Furnished Information

None.

Period of Performance Delivery date: April 1, 2023

File details come from the government source that posted it. Updated .