OPTICAL MIRRORS RE-POLISH & COAT
STATEMENT OF WORK (SOW)
1.0 BACKGROUND
The Naval Surface Warfare center Dahlgren Division (NSWCDD), requires four (4) additional high energy laser turning mirrors as follows. NSWCDD will acquire two (2) new turning mirrors and wants to have two (2) currently government owned turning mirrors re-polished and recoated to support current and future laser operations. Specifications will be supplied in a separate document.
2.0 APPLICABLE DOCUMENTS
2.1 Specifications document for new and recoated mirrors
3.0 REQUIREMENTS
3.1 The Contractor shall review all specifications for the new optical turning mirrors and supply two (2) new mirrors meeting/exceeding these specifications.
3.2 The Contractor shall review all specifications for the re-polishing and recoating of two (2)
NSWCDD owned and supplied optical turning mirrors. The Contractor will re-polish and recoated the supplied mirrors to meet/exceed the supplied specifications.
3.3 The Contractor shall ensure all mirrors supplied to NSWCDD (both new and recoated) meet or exceed supplied specifications.
3.4 The Contractor shall provide each Contractor employee with the personal protective equipment required to do their job safely and in compliance with all applicable regulations.
3.5 The Contractor shall coordinate with the Technical Point of Contact (TPOC) identified below to complete this work.
4.0 GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION
(GFP/GFM/GFI)
NSWCDD will be suppling two 16” diameter x 2” thick mirrors with an existing dielectric optical coating applied. These mirrors are to be re-polished and recoated to the specifications outline in the separately provided specifications document
5.0 SECURITY
The work to be performed under this contract is unclassified.
6.0 TRAVEL
The contractor will not be required to travel in performance of this contract as the GFP listed above will be supplied to contractor to complete the desired work at their own facility.