INDIANA DUNES NATIONAL PARK

100 North Lake St.

City of Gary, Indiana

Exterior Painting and Repairs

PMIS 220854

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

01/06/2022

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 - Division 01 Short Form General Requirements

DIVISION 09 - FINISHES

Section 09 91 13 – Exterior Painting

APPENDIX

APPENDIX A (ASBUILT- DRAWINGS)

APPENDIX B (WINDOWS – SCHEDULE)

APPENDIX C (PHOTOGRAPHS)

SECTION 01 10 00

SHORT FORM GENERAL REQUIREMENTS

Page | 1

DIVISION 1

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: The Original building was built in 1984 and is a combination of masonry and heavy timber & reinforced concrete construction. This facility is known as the Paul H. Douglass Environmental and Learning Center “PDELC”. The facility provides several programs for students of all ages and the surrounding community. The goal of this project is to paint, and repair all the outside walls, wood trim perimeter windows. Remove all the existing gutters and install a new gutter on the west side of the building including the downspouts. Replace plywood wall members as shown in the drawings and install a metal panel on top of the new plywood sheet.

1.2 Work Covered by the Contract Documents:

A. Project Location: The work is located at the Paul H. Douglas Environmental Learning Center Building # 314. Located at 100 North Lake St. Gary, Indiana. See

Work consists of: The work for this project consists of painting all the outside walls (wood, metal, steel beams and concrete walls and columns.) Due to the existing conditions some of the existing Tongue and Groove 1x 6 Cedar Siding – Grade Clear need to be repaired and some members need to be replaced. Also, some of the ½” plywood sheets located at the top of the walls need to be replaced and a metal panel shall be installed on top of the plywood sheets to extend their life span. The contractor shall provide all the equipment, tools, and materials to complete the job.

Scaffolding will be required to do the work and the contractor shall follow OSHA and State Standards and regulations. The following are the task to be completed under this contract.

1. Paint all exterior walls, doors, and ceiling surface areas (Wood, Metal, Steel and Concrete) Match existing color- The contractor shall provide a color sample to the COR for approval before ordering the paint. The contractor shall field verify all the dimensions.

Remove 3 inch of the existing soil, and paint this area below grade and return soil.

i. Walls -Area approximately 20,342 S.F.

ii. Steel Beams – Area approximately 600 S.F.

iii. Concrete Columns – Area approximately 905 S.F.

2. Repair or replace (Tongue and Groove 1x 6 Cedar Siding – Grade Clear) and hole damages 20% of the entire wall area (3,767 S.F.)

3. Replace exposed ½” Plywood Sheets (Rating Exposure 1, Grade A) and install Metal Panels on top. Match existing panel color. (Approximately size 4’x8’ –) Area approximately = 2,571 S.F.) Use Wall Panel as follow: Depth: 7/8” (22mm), Width 16” (406mm), Painted Steel: Galvalume/ Zincalume 22GA(0.76mm). Smooth surface.

Contractor shall provide the best metallic premium color to match the existing building color. Contractor shall provide a chart color before ordering the color and materials.

INDU PMIS: 220854

Page | 2

Match Cedar Wood Tongue and groove siding color based on Metal Sheet chart.

Air and Water Infiltration testing has been conducted on the Integrity Series panel system in accordance with ASTM E283 and ASTM E 331. UL rates the wall systems in steel as a Class A Wall Covering. (Installation should follow manufacturer recommendations for any additional clip, flashing and screw connections) Replace or removed and reinstall existing flashing to prevent any damages.

4. Replace 1x10 Cedar Fascia 78L.F. and Cedar Wood Trim (1x4) 78L.F. over 1x10 Cedar Fascia (Grade #1 and Appearance Grade A) - 10% of the entire building perimeter.

5. Replace 5/4” x 4” Wood Trim @ Jambs (Typ.), 5/4” x 6” Wood Trim @ Head (Typ.), Two

(2) 5/4” x 4” on both sides for the 42 Windows. See Sheet C03 for Windows dimensions.

(Grade #1 and Appearance Grade A)

6. Remove All Gutter & Downspout (Include Gutters and Downspout debris) except for West Elevation Gutters and Gutters on the North Elevation area. 187 L.F.

7. Install a New Gutter with Leaf Guard on the West Elevation Roof 54 L.F. (Replace gutter 6" deep 7 " wide. Remove 2x4 and install new gutters directly to the facia. Replace roof edge flashing, if necessary, after the repairs.)

The Rain-carrying system consists of all necessary components to complete installation per manufacturer specifications.

A. Gutters shall be made of 3105-H24 aluminum and shall be continuous and seamless with a minimum thickness gauge of .032” or .027” (+/- .002” nominal).

B. All pre-painted components will have an approved COR Finish and Color.

C. Prior to painting, all metal shall receive a pre-treatment to assure for maximum paint adhesion. The exterior finish shall be of a baked-on enamel, one-coat system applied in a continuous process in a single operation, comprising a high-performance linear topcoat. The inside of the gutter shall be finished with a wash-coat finish.

D. Downspouts, Elbows, Miters, End caps shall be made of 3105-H24 aluminum with a minimum thickness gauge of .019” (+/- .002” nominal).

E. Sealant/Caulking - Seam Sealer, OSI ProSeries, Ruscoe, Geocel F. Hanging system as per manufacturer recommendations with Screw attached for size as necessary.

8. Install a Leaf Guard on the gutters in the decking North Side Elevation area. See Picture

PDELC[63].jpg A. Lock-On Gutter Screen from Manufacturer sized as necessary.

B. Solid Gutter Cover per manufacturer recommendations, to be the Leaf Protection

Panels in an approved COR color.

9. Install two new Downspouts on the West Elevation 80 L.F. (Match dimensions, material and thickness for the other downspouts in the building)

10. Install a temporary scaffolding for painting and repair process. See building dimensions on Sheet C03 and As-built Drawings.

11. Gutters and Downspouts on North Elevation to remain.

12. Remove Sheet Metal from wall corner and install Cedar Wood Siding as required.

Page | 3

B. All work will be performed under a single contract.

Period of performance: Work shall be completed within 120 calendar days after the issuance of the Notice to Proceed. The period of performance is inclusive of 10 weather days.

ITEM 2 - EXISTING UTILITIES

2.1 Existing Utilities: N/A

2.2 Contractor shall be responsible for locating and preventing damage to known utilities. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.

2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:

2.3.1 Notify CO and COR not less than two business days in advance of proposed utility interruptions.

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent. Superintendent's Compendium - Indiana Dunes National Park (U.S. National Park Service) (nps.gov)

A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.

3.2 On-site work hours: Work shall be generally performed during normal business working hours of 7 a.m. to 4 p.m., Monday through Friday, except when otherwise indicated.

A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.

The following Federal holidays are observed by the National Park Service:

New Year Day

Page | 4

Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding Friday;

holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan Appendix B Sheet C02. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Limits: Limit of construction shall be limited to 15 feet from the perimeter of the building. The contractor shall provide cones, signs, and warning tapes to discourage the public to enter the construction area.

C. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances. Do not block the access to Milller Woods Trail, which is also a fire route.

D. Limit site disturbance, including earthwork and clearing of vegetation, to:

a. 15 feet beyond building perimeter

E. Utilities

a. General: Cost or use charges for temporary facilities shall be included in the Contract

Sum as required.

b. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.

c. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.

Page | 5

d. Toilets: Contractor provided for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location if not shown on attached site plan.

F. Security and Protection facilities:

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

3. Tree and Plant Protection: Provide Tree Protection fence at drip line of trees impacted in construction area. Coordinate with COR.

1. Restore damaged areas to original condition, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer Representative and remove agreed-on roots and branches that interfere with construction.

4. Do not fasten ropes, cables, or guys to trees.

4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.

5. Site Enclosure Fence: N/A

6. Security Enclosure and Lockup: N/A

7. Temporary Enclosures: Provide temporary enclosures as required for protection of construction in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior. Provide snow fence at the main entrance and behind the building (East and West boundaries elevations) See Location Map Sheet C02.

3.4 Storage - Staging Areas:

Page | 6

A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. No cost specific storage and staging area’s may be discussed at the preconstruction briefing. (Reference a plan showing project and allowable construction area see Appendix B Sheet C02. The area of the parking designated on C02 is available for storage. Limits of use and control shall be subject to Contracting Officer’s approval.

Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

3.5 Preservation of Natural Features: N/A

3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.

3.7 Housekeeping:

A. Keep project neat, orderly, and in a safe condition at all times.

a. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters

b. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

B. New Buildings/Existing Buildings Unoccupied: N/A

3.9 Photo Documentation:

Page | 7

Contractor must provide existing condition, progress and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email or via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.

A. Existing Condition Images:

Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.

B. Construction Progress Images:

1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)

2. Maintain organized index for photos with date, description, etc..

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

C. Completion Images:

1. Document all completed work within scope of work.

2. Maintain organized index for photos with date, description, etc..

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

3.10 Fire and Life Safety:

As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.

These meetings can be annotated on the contractors’ daily reports

A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction.

B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

i. Immediately report all spills of hazardous materials to the CO, COR and park.

ii. Maintain a spill emergency response kit.

iii. Train employees how to respond to a spill and use the emergency response kit.

Page | 8

3.11 Noise and Acoustics Management Noise Control: Perform operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer or

COR.

A. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.

1. Do not exceed the following dB(A) limitations at 50 feet:

Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour

2. Maximum permissible construction equipment noise levels at 50 feet:

EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75

B. Ambient Noise:

1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:

a. Residential receiving area :

Daytime: 65 dB Nighttime: 45 dB

b. Commercial/Industrial receiving area:

Daytime: 67 dB Nighttime: 65 dB

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.

Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.

ITEM 6 - ABBREVIATIONS

6.1 The list of abbreviations, standards and organizations which may be used in/referred within the Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.”

https://www.nps.gov/orgs/1671/do-business-with-us.htm

Page | 9

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.

7.2 Submittals:

A. Accident Prevention (Safety) Plan (APP): Submit a site specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:

1. Name and qualifications of responsible supervisor to carry out the program.

2. First aid and rescue procedures.

3. Training, both initial and continuing.

4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.

5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.

6. Contractor to identify nearest location of medical facility for emergencies

7. Recognition that work will be performed in remote areas with limited communication or cell phone coverage if applicable.

8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute

"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.

Page | 10

7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.

B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.

C. All PPE will be serviceable at all times. At a minimum, maintain four (4) sets of PPE including hard hats and all other Accident Prevention Plan required equipment.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.

ITEM 8 - PRECONSTRUCTION CONFERENCE:

The Contracting Officer will conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officers notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.

ITEM 9 - SUBMITTALS

9.1 General Submittal Procedures:

A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using

National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR

B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.

Page | 11

C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre- Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention (Safety) Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).

7. Quality Control Plan.

8. Waste Management Plan.

9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.

A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.

1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.

B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.

1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.

C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selection. Paint samples shall be actual paint finish drawdown for all project colors.

1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.

D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).

E. After approving submittals, Contracting Officer and/or COR will return one copy to the Contractor.

If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

Page | 12

9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendor.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested; but minimally with each pay application.

Submit digital copy electronically (PDF preferred) of all required documents. Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work.

For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under

Page | 13 this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.

ITEM 10 – TEMPORARY SERVICES

10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.

11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be complete following the final inspection with minor comments, the

COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.

B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 30 calendar days or a time directed by the CO.

D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.

E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

F. Disposition of any permits and warranties required by the specifications in this section.

11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

Page | 14

11.5 Warranties

A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.

B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.

C. Information shall include operation and maintenance manuals for each warranted product.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXCUTION (NOT USED)

END OF SECTION

SECTION 09 91 13

EXTERIOR PAINTING

Page | 15

PART 1 - GENERAL

1.1 SCOPE OF WORK (See Division 01 – Short Form General Requirements.)

Indiana dunes National Park /

100 North Lake St., City of Gary, Indiana

A. Project Location: City of Gary

B. Building(s) Name/Identifier: Building: Paul H. Douglas Environmental and Learning Center (B- 314.)

1.2 SUMMARY

A. Section includes surface preparation and the application of paint systems on the following exterior substrates:

1. Concrete.

2. Concrete masonry units (CMUs).

3. Galvanized metal.

4. Aluminum (not anodized or otherwise coated).

5. Wood.

1.3 DEFINITIONS (Master Painters Institute-MPI)

A. Master Painters Institute (MPI) (http://www.specifypaint.us & http://paintinfo.com/)

B. MPI Gloss Level 1: Not more than five units at 60 degrees and 10 units at 85 degrees, according to ASTM D 523.

C. MPI Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D 523. (Exterior Concrete Paint Table)

D. MPI Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according to ASTM D 523. (Exterior Concrete Masonry Units Paint Table)

E. MPI Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523. (Exterior Metal, Ferrous and Non-Ferrous Paint Table)

F. MPI Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523. (Exterior Wood;

Dressed Lumber, Paneling, Decking, Shingles Paint Table)

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product. Include preparation requirements and application instructions.

1. Include printout of current "MPI Approved Products List" for each product category specified, with the proposed product highlighted.

Page | 16

2. Include Safety Data Sheet (SDS).

B. Samples: For each type of paint system and each color and gloss of topcoat.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. MPI Listing Manufactures as shown on the MPI Approved Products Lists.

B. Products: Subject to compliance with requirements, provide product listed in the Exterior Painting Schedule for the paint category indicated.

2.2 PAINT, GENERAL

A. MPI Standards: Products shall comply with MPI standards indicated and shall be listed in its "MPI Approved Products Lists."

B. Material Compatibility:

1. Materials for use within each paint system shall be compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.

2. For each coat in a paint system, products shall be recommended in writing by topcoat manufacturers for use in paint system and on substrate indicated.

C. Colors: As selected by Contracting Officer’s Representative (COR) from manufacturer's full range. (Match existing color)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.

B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:

Percentages in six subparagraphs below are based on "MPI Manual."

1. Concrete: 12 percent.

2. Masonry (Clay and CMUs): 12 percent.

3. Wood: 15 percent.

4. Portland Cement Plaster: 12 percent.

C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.

D. Proceed with coating application only after unsatisfactory conditions have been corrected.

1. Application of coating indicates acceptance of surfaces and conditions.

Page | 17

3.2 PREPARATION

A. Comply with manufacturer's written instructions and recommendations in "MPI Maintenance Repainting Manual" applicable to substrates and paint systems indicated.

B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.

1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection.

2. Limit use of power washing on Historic Structures to the extent necessary. Any power washing should be done in a manner to avoid damage to the structure and substrate.

C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.

1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.

D. Concrete Substrates: Remove release agents, curing compounds, efflorescence, and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces to be painted exceeds that permitted in manufacturer's written instructions.

E. Masonry Substrates: Remove efflorescence and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces or mortar joints exceeds that permitted in manufacturer's written instructions.

F. Steel Substrates: Remove rust, loose mill scale, and shop primer if any. Clean using methods recommended in writing by paint manufacturer.

G. Galvanized-Metal Substrates: Remove grease and oil residue from galvanized sheet metal by mechanical methods to produce clean, lightly etched surfaces that promote adhesion of subsequently applied paints.

H. Aluminum Substrates: Remove loose surface oxidation.

I. Wood Substrates:

1. Scrape and clean knots. Before applying primer, apply coat of knot sealer recommended in writing by topcoat manufacturer for exterior use in paint system indicated.

2. Sand surfaces that will be exposed to view, and dust off.

3. Prime edges, ends, faces, undersides, and backsides of wood.

4. After priming, fill holes and imperfections in the finish surfaces with putty or plastic wood filler. Sand smooth when dried.

3.3 APPLICATION

A. Apply paints according to manufacturer's written instructions and recommendations in "MPI Maintenance Repainting Manual."

1. Use applicators and techniques suited for paint and substrate indicated.

Page | 18

2. Paint surfaces behind movable items same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed items with prime coat only.

3. Paint both sides and edges of exterior doors and entire exposed surface of exterior door frames.

4. Paint entire exposed surface of window frames and sashes.

5. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.

6. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.

B. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance from corner to corner of wall area.

C. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.

3.4 CLEANING AND PROTECTION

A. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by COR, and leave in an undamaged condition.

B. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

3.5 EXTERIOR PAINTING SCHEDULE

A. Concrete Substrates, Nontraffic Surfaces:

1. High Performance Architectural Latex System MPI EXT 3.1N:

a. Prime Coat: Latex, exterior, matching topcoat.

b. Topcoat: Latex, exterior, low sheen (MPI Gloss Level 3-4), MPI #315.

B. Galvanized-Metal Substrates:

1. Alkyd System MPI EXT 5.3B:

a. Prime Coat: Primer, alkyd, exterior, flat (MPI Gloss Level 1), MPI #8

b. Topcoat: Alkyd, exterior, semi-gloss (MPI Gloss Level 5), MPI #94.

C. Aluminum Substrates: N/A

D. Wood Substrates: Glued-laminated construction.

1. Latex over Latex Primer System MPI EXT 6.1L:

a. Prime Coat: Primer, latex for exterior wood, MPI #6.

b. Topcoat: Latex, exterior, low sheen (MPI Gloss Level 3-4), MPI #15.

2. Latex over Alkyd Primer System MPI EXT 6.1A:

Page | 19

a. Prime Coat: Primer, alkyd for exterior wood, MPI #5.

b. Topcoat: Latex, exterior, low sheen (MPI Gloss Level 3-4), MPI #15.

E. Wood Substrates: Exposed framing.

1. Latex over Latex Primer System MPI EXT 6.2M:

a. Prime Coat: Primer, latex for exterior wood, MPI #6.

b. Topcoat: Latex, exterior, gloss (MPI Gloss Level 6), MPI #119.

2. Latex over Alkyd Primer System MPI EXT 6.2A:

a. Prime Coat: Primer, alkyd for exterior wood, MPI #5.

b. Topcoat: Latex, exterior, gloss (MPI Gloss Level 6), MPI #119.

F. Wood Substrates: Dressed Wood (trim, Architectural woodwork, Doors, Windows, Wood board siding and wood fences).

1. Latex over Latex Primer System MPI EXT 6.3L:

a. Prime Coat: Primer, latex for exterior wood, MPI #6.

b. Topcoat: Latex, exterior, gloss (MPI Gloss Level 6), MPI #119.

2. Latex System over Alkyd Primer System MPI EXT 6.3A:

a. Prime Coat: Primer, alkyd for exterior wood, MPI #5.

b. Topcoat: Latex, exterior, gloss (MPI Gloss Level 6), MPI #119.

G. Wood Substrates: Wood-based panel products.

1. Latex over Latex Primer System MPI EXT 6.4K:

a. Prime Coat: Primer, latex for exterior wood, MPI #6.

b. Topcoat: Latex, exterior, gloss (MPI Gloss Level 6), MPI #119.

2. Latex over Alkyd Primer System MPI EXT 6.4G:

a. Prime Coat: Primer, alkyd for exterior wood, MPI #5.

b. Topcoat: Latex, exterior, gloss (MPI Gloss Level 6), MPI #119.

END OF SECTION

AutoCAD SHX Text

STATE PARK

AutoCAD SHX Text

INDIANA DUNES

AutoCAD SHX Text

CALUMET RIVER

AutoCAD SHX Text

CHICAGO

AutoCAD SHX Text

TO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DEEP

AutoCAD SHX Text

MERRILLVILLE

AutoCAD SHX Text

TO

AutoCAD SHX Text

AutoCAD SHX Text

GARY

AutoCAD SHX Text

LITTLE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ELGIN JOLIET AND EASTERN R.R.

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

PORTER CO.

AutoCAD SHX Text

LAKE CO.

AutoCAD SHX Text

AutoCAD SHX Text

PORTAGE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHICAGO

AutoCAD SHX Text

TO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SOUTH

AutoCAD SHX Text

AutoCAD SHX Text

WEST BEACH

AutoCAD SHX Text

AutoCAD SHX Text

DUNES

AutoCAD SHX Text

OGDEN

AutoCAD SHX Text

CHICAGO

AutoCAD SHX Text

LAKE MICHIGAN

AutoCAD SHX Text

BEND

AutoCAD SHX Text

AutoCAD SHX Text

SHORE

AutoCAD SHX Text

SOUTH

AutoCAD SHX Text

AND

AutoCAD SHX Text

CHESTERTON

AutoCAD SHX Text

HQ.

AutoCAD SHX Text R.R.

AutoCAD SHX Text

DUNE ACRES

AutoCAD SHX Text

LA PORTE CO.

AutoCAD SHX Text

PORTER CO.

AutoCAD SHX Text

AutoCAD SHX Text

WESTVILLE &

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHESAPEAKE AND OHIO R.R.

AutoCAD SHX Text

PENN CENTRAL R.R.

AutoCAD SHX Text

CALUMET

AutoCAD SHX Text

LITTLE

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

ROOKERY

AutoCAD SHX Text

HERON

AutoCAD SHX Text V.C.

AutoCAD SHX Text

BEVERLY DR.

AutoCAD SHX Text

BEVERLY SHORES

AutoCAD SHX Text

200 NORTH ROAD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MICHIGAN

AutoCAD SHX Text

CITY

AutoCAD SHX Text

AutoCAD SHX Text

JOLIET

AutoCAD SHX Text

LA PORTE

AutoCAD SHX Text

GRIFFITH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INDIANA

AutoCAD SHX Text

ILLINOIS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CROWN

AutoCAD SHX Text

POINT

AutoCAD SHX Text

AutoCAD SHX Text

VALPARAISO

AutoCAD SHX Text

AutoCAD SHX Text

GARY

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NATIONAL LAKESHORE

AutoCAD SHX Text

INDIANA DUNES

AutoCAD SHX Text

CHICAGO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MICHIGAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CITY

AutoCAD SHX Text

LAKE MICHIGAN

AutoCAD SHX Text

INDIANA

AutoCAD SHX Text

MICHIGAN

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF MILES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF KILOMETERS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF MILES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INDIANA DUNES NATIONAL PARK

AutoCAD SHX Text

INFORMATION CENTER

AutoCAD SHX Text

PARK HEADQUARTERS

AutoCAD SHX Text

VISITOR CENTER

AutoCAD SHX Text

PARK BOUNDARY

AutoCAD SHX Text

HQ.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text V.C.

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

COUNTY LINE

AutoCAD SHX Text

STATE PARK

AutoCAD SHX Text

BASIC DATA:

AutoCAD SHX Text

STATE

AutoCAD SHX Text

NATIONAL PARK SERVICE

AutoCAD SHX Text

DENVER SERVICE CENTER

AutoCAD SHX Text

REGION

AutoCAD SHX Text

COUNTY

AutoCAD SHX Text

DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

UNITED STATES

AutoCAD SHX Text

LOCATION WITHIN PARK

AutoCAD SHX Text

NAME OF PARK

AutoCAD SHX Text

TITLE OF DRAWING

AutoCAD SHX Text

PAUL H. DOUGLAS ENVIRONMENTAL & LEARNING CENTER

AutoCAD SHX Text

100 NORTH LAKE ST. / GARY

AutoCAD SHX Text 178153

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PORTER

AutoCAD SHX Text

INDIANA

AutoCAD SHX Text

OF

AutoCAD SHX Text

PKG.

AutoCAD SHX Text

NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

NORTHWEST

AutoCAD SHX Text

INDIANA

AutoCAD SHX Text

CONSTRUCTION DRAWINGS

AutoCAD SHX Text

QUALITY DESIGN CERTIFICATION

AutoCAD SHX Text

OR

AutoCAD SHX Text

OR

AutoCAD SHX Text Development (Title I)

AutoCAD SHX Text Prepared in Accordance with Design

AutoCAD SHX Text by Design Development (Title I)

AutoCAD SHX Text Construction Drawing Not Preceded

AutoCAD SHX Text Approved by Superintendent on

AutoCAD SHX Text Variance from Design Development (Title I)

AutoCAD SHX Text Project Manager

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Sheet

AutoCAD SHX Text Mark

AutoCAD SHX Text

REVISION

AutoCAD SHX Text Date

AutoCAD SHX Text Initial

AutoCAD SHX Text

PMIS - 220854

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text

PROJECT AREA

AutoCAD SHX Text

MIDWEST

AutoCAD SHX Text

INDIANA DUNES NATIONAL LAKESHORE

AutoCAD SHX Text

F:\U\INDU\2022\20220105_PDELC_PAINT\DRAWINGS\C01 INDUCOV.DWG

C03/C

AutoCAD SHX Text

RAILROAD

AutoCAD SHX Text

N. LAKE ST.

AutoCAD SHX Text options

AutoCAD SHX Text

STAGING AREAS

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

LOCATION MAP

AutoCAD SHX Text

PAUL H. DOUGLAS ENVIRONMENTAL

AutoCAD SHX Text

& LEARNING CENTER

AutoCAD SHX Text

AutoCAD SHX Text 178153

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N/A

AutoCAD SHX Text

APM

AutoCAD SHX Text 01/07/2022

AutoCAD SHX Text

INDIANA DUNES NATIONAL PARK

AutoCAD SHX Text 220854

AutoCAD SHX Text C02

AutoCAD SHX Text

SCALE 1"=60'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 01/07/2022 APEREZMALDONADO U:\INDU\2022\20220105_PDELC_PAINT\DRAWINGS\C02 LOCATION MAP.DWG; IMAGES: U:\INDU\2022\20220105_PDELC_PAINT\DRAWINGS\BASE\AERIAL.JP2

APerezMaldonado Line

APerezMaldonado Line

APerezMaldonado Line

APerezMaldonado Text Box Install Snowfence in three(3) access point areas, to discourage the public to access the construction site.

APerezMaldonado Line

APerezMaldonado Line

APerezMaldonado Line

W

AutoCAD SHX Text %%U

AutoCAD SHX Text

AutoCAD SHX Text W

AutoCAD SHX Text %%U

AutoCAD SHX Text

AutoCAD SHX Text W

AutoCAD SHX Text %%U

AutoCAD SHX Text

AutoCAD SHX Text W

AutoCAD SHX Text %%U

AutoCAD SHX…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .