STATEMENT OF WORK FORMAT

6 um pulsed OP-GaAs OPO laser for unambiguous water ice detection on the Moon and other planetary bodies

5/31/2022

PR: 4200802821_

Note: Only use the sections that are applicable to your service procurement.

Background

NASA Artemis program will send Astronauts back to the Moon and practice In- Situ Resource Utilization (ISRU) there, and then get ready for human exploration of Mars.

Our IRAD project is to develop 6 m pulsed OP-GaAs OPO laser for unambiguous water ice detection on the Moon and other planetary bodies.

6 m pulsed OP-GaAs OPO laser is pumped by a single frequency Ho:YLF pulsed laser.

We designed a Compact ring-cavity laser pumped single-frequency pulsed OPO.

Custom Water Cooled AO Q-Switch: CQQ-41-1-1500-BC/WC & RF Driver is the key part of OPO pump source: Compact ring-cavity single-frequency Ho:YLF pulsed laser.

The principle of two-mirror ring-cavity lasers has been demonstrated by References:

1. L. J. Bromley and D. C. Hanna, “Single-frequency Q-switched operation of a

Diode-Laser-pumped Nd:YAG ring laser using an acousto-optic modulator.”

Opt. Lett. Vol. 16, 378 (1991).

2. G. T. Maker, P. A. Malcolm, and A. I. Ferguson, “single-frequency diode-pumped Nd:YAG ring ;laser with no intracavity elements.” Opt. Lett. Vol. 18, 1813 (1993).

Scope

Gooch & Housego (British company) has modified our original design, but the company asked a long lead time to fabricate the AO Q-Switch.

Brimrose (USA company) shall fabricate the AO Q-switch in reasonable lead time of 11-13 weeks and meet the same requirement.

Requirements

Deliverables or Delivery Schedule The lead time is about 11-13 weeks.

Government-Furnished Equipment and Government-Furnished Information

Brimrose Corporation of America will supply the test data sheet

Place of Performance

Brimose Corporation of America, !9 Loveton Circle, Hunt Valley Loveton Center, Beltimore, Maryland 21152-9201 USA

Period of Performance

11-13 weeks