Statement of Work.docx

DOCX document 23 KB Posted

Attached to
#3 SSDG BEARING Federal contract opportunity
Solicitation number
70Z08524P703
Issued by
Department of Homeland Security US Coast Guard

About this file

This statement of work outlines the requirements for removing, manufacturing, and installing new wear sleeves on oil and gas drive and non-drive end frames. The contractor shall pick up the existing frames from the Coast Guard base in Alameda, California, remove the old wear sleeves, manufacture new sleeves from 4140 steel to achieve a 50 Rockwell C minimum hardness as specified in the manufacturer's drawings, press or shrink fit the new sleeves to the frames within a tolerance of 0.001-0.003 inches, and ensure all standards and dimensions meet the manufacturer's requirements. The contractor must then ship the refurbished frames back to the Coast Guard base in Alameda. This work relates to solicitation number 70Z08524P703 for bearing replacements on an SSDG unit issued by the Coast Guard, part of the Department of Homeland Security.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work: CGC KIMBALL #3 SSDG Wear Sleeve Manufacturing/Machining The CTR shall provide technical services and labor to complete the removal, installation, and final machining of the National Oilwell Varco Drive End and Non-Drive End Frame.

The current wear sleeve is out of tolerance and must be re-made, re-installed, and machined to meet the specifications required in manufacturers drawings 11466495-DAD and 11370466-DAD.

The CTR shall provide the following:

1. Pick up, or arrange for shipping from:

CG Base Alameda

USCG SFLC LREPL

1 Eagle Rd Bldg 42 Alameda, CA 94501

2. Remove old wear sleeve from housings IAW Manufacturers drawings as listed above.

3. Manufacturer new sleeve from 4140 steel treated material to achieve 50 Rockwell C minimum IAW Manufacturers drawings as listed above.

4. Press or shrink as required to meet 0.001-0.003 interference fit with end frame and align slot with 1/8” NPT hole IAW Manufacturers drawings as listed above.

5. Ensure all standards and requirements are IAW Manufacturers drawings as listed above.

6. Arrange for drop-off, or shipment back to:

CG Base Alameda

USCG SFLC LREPL

1 Eagle Rd Bldg 42 Alameda, CA 94501