STATEMENT OF WORK.docx
DOCX document 25 KB Posted
- Attached to
- BRACKET Federal contract opportunity
- Solicitation number
- SPMYM2-23-Q-0672
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CDRL of CLIN ITEM 0001.pdf | ||
| SOLICITATION SPMYM2-23-Q-0672.pdf | ||
| CDRL of CLIN ITEM 0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Title: Manufacture Anchor Compliant Sheave Bumper Brackets
Place of Performance: Martinez & Turek, Inc.
Period of Performance: 10 Weeks from Date of Award or date that all material for fabrication is available (whichever is later)
REFERENCES :
1. DN2011-282A3 (A)
2. MIL-STD-22D
3. S9074-AR-GIB-010/278 (A)
4. ERMC07081 (A)
5. DF2011-282 (A)
1. BACKGROUND:
Manufacture Qty. 2 EA new lower right bumper bracket (PN 73) and Qty. 2 EA new lower left bumper bracket (PN 72) in accordance with references (1), (2) and (3). Reference (4) is provided for easier identification of required material.
2. SCOPE:
Contractor will procure material (with exceptions stated in Section 5) and build Qty. 2 EA lower right bumper bracket (PN 73) and Qty. 2 EA lower left bumper bracket (PN 72) in accordance with Ref. (1), (2) & (3) while providing verification of weld quality and adherence to dimensions required by Ref. (1), (2) & (3). Reference (4) is provided for easier identification of required material. Reference (5) is the original drawing and provides fabrication notes regarding the brackets. Reference (1) is a design notice for Reference (5) and contains the specifications that the brackets shall be fabricated to.
3. DELIVERABLE ITEMS:
1. New bumper brackets
a. Qty. 2 EA Lower Left Bumper Bracket (PN 72 of Reference 1) manufactured in accordance with References (1), (2) & (3).
b. Qty. 2 EA Lower Right Bumper Bracket (PN 73 of Reference 1) manufactured in accordance with References (1), (2) & (3).
2. Certificate of Compliance of weld NDT results
Contract Data Requirement List (CDRL) DI-MISC-81356A Certificate of Compliance
a. Verification of all welds via Non-Destructive Testing (NDT) per reference (3) table VIII for Machinery Class M-2/A, documented on a Certificate of Compliance (CoC). See Section 6.
4. CONTRACTOR FURNISHED MATERIAL:
Manufacture is to procure all material needed for the manufacture of bumper brackets except material listed in section (5).
5. GOVERNMENT-FURNISHED PROPERTY:
- ASTM A554 CRES 316L 3” X 2” X .250”W X 6’ Rectangular Tube for PC# 7201 and 7301 of Ref 1 (Procured from Bright Horizon Metals) Doc# 3019-8318
6. QUALITY ASSURANCE REQUIREMENTS:
PSNS&IMF –or- Contractor is responsible for quality assurance.
1. Qty. 1 EA CoC verifying the following:
a. NDT requirements have been met for all weld joints on the components. Specifically, each weld joint will require a 5X magnification Visual Test (VT) on the root layer, and a VT as well as a Penetrant Test (PT) on the final weld. NDT shall be performed per requirements in Reference (3).
b. Verification that components have been manufactured within tolerances as specified in References (1), (2), (3) and (5). Note: Only the fabrication notes in Reference (5) shall be adhered to.
7. SECURITY REQUIREMENTS: N/A
8. Shipping Address:
Contractor will be responsible for delivery of finished product to PSNS.
ATTN: WAYNE BOOHER, PO/JML: 3030-8332, 3030-8333 N4523A-PUGET SOUND NAVAL SHIPYARD
1400 FARRAGUT AVENUE, BLDG 514
BREMERTON, WA 98314-5000
9. GOVERNMENT REPRESENTATIVE:
1.1. Technical Point of Contact:
Primary: Ned Williams, C/120X.1, (360) 627-5073, ned.e.williams.civ@us.navy.mil Secondary: Colton Alexander, C/120X.1, (360) 627-5112, colton.j.alexander.civ@us.navy.mil
1.2. Project Manager: Jonathan Reid, C/120, (360) 471-6246, jonathan.b.reid.civ@us.navy.mil
1.3. Materials Manager: Wayne Booher, C/127.2 (360) 627-5249 wayne.m.booher.civ@us.navy.mil
10. Warranty:
The warranty period for equipment manufactured and supplied by the company will be within a twelve-month period from delivery date of the equipment to the original purchaser by the company or by an authorized representative.
11. Environmental and Safety Concerns:
1.1. The contractor shall be responsible for all environmental and safety concerns for the design, manufacturing and testing of the final product.
Cog Tech Code Originator: Colton Alexander C/120X.1 ALEXANDER.COLTON.JAME Digitally signed by
ALEXANDER.COLTON.JAMES.1093372154
Signature:S.1093372154
Date: 2023.01.30 11:54:11 -08'00'
Date: _01/30/2023 _
Cog Tech Code Review: Ned Williams C/120X.1
Digitally signed by
WILLIAMS.NED.E.1272372361
WILLIAMS.NED.E.1272372361
Date:
2023.01.30
11:57:07
08'00' )Signature: Date: _01/30/2023 image1.png