Statement of Work.docx
DOCX document 24 KB Posted
- Attached to
- Ballistic Equipment Federal contract opportunity
- Solicitation number
- FA448421Q0030
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JB MDL SFS Appendix.pdf | ||
| JB MDL Antiterrorism Awareness for Contractors (Trifold).pdf | ||
| JB MDL AT Awareness Guide for Contractors.pdf | ||
| Solicitation - FA448421Q0030.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
TO
PURCHASE TWENTY FOUR (24) HIGH CUT BALLISTIC HELMETS AND TWENTY FOUR (24) RESCUE TASK FORCE VEST KITS
AT
JOINT BASE MDL, NEW JERSEY
16 July 2021 (Revision 2)
1. DESCRIPTION OF SERVICES: The contractor shall provide all equipment, labor and transportation as specified below to JBMDL. Supply and deliver to Fire Station #3 at Joint Base McGuire-Dix-Lakehurst, twenty four (24) High Cut Ballistic Helmets and twenty four (24) Rescue Task Force Kits.
2. Requirements for High Cut Ballistic Helmets and Rescue Task Force Kits are listed below.
a. High Cut Ballistic Helmets (24):
i. Helmets must be high cut with a WILCOX Shroud, Velcro kit, dial retention liner and four-point adjustable chinstrap system, one (1) HHC light and siderails.
ii. Color must be black and must weigh no more than 4 pounds.
iii. Sizes must all be Large/Extra Large with label and upgraded to the seven (7) pad gel system.
iv. Must meet National Institute of Justice (NIJ) standard level IIIA for nine (9) millimeter and forty four (.44) magazine.
b. Rescue Task Force Kits (24):
i. Vests must be National Institute of Justice (NIJ) standard 0101.06 and be level IIIA.
ii. Each vest must be supplied with two (2) black background white lettering “FIRE” Velcro placards and two (2) black background white lettering “MEDIC” Velcro placards, one (1) black medical plus pouch, one (1) black radio pouch and one (1) black gear bag.
iii. Sizes must be universal “one size fits all”
iv. Each kit must have one (1) Front and one (1) back Armor inserts and must be eleven (11) inches by fourteen (14) inches and two (2) side armor inserts must be five (5) inches by fifteen (15) inches, two (2) 4401 NIJ Certified level IV stand-alone plates; single curve; shooter cut; ten (10.0) inches by twelve (12.0) inches; 7.4 pounds and two (2) PAIR composite ceramic side plate NIJIII SA must be six (6) inches by six (6) inches T type at 0.8 kilograms.
3. POINTS OF CONTACT:
a. Primary PM: TSgt Robert Gerry Organization: 87 CES Telephone: 609-562-3820 Email: robert.gerry@us.af.mil
b. Alternate PM: SrA Taylor Stone Organization: 87 CES Telephone: 609-562-3608 Email: taylor.stone.1@us.af.mil
c. Contracting Officer: Wanda Wilson Organization: 87 CONS Email: wanda.wilson.1@us.af.mil
d. Contract Specialist: Erin Schoenenberger Organization: 87 CONS Email: erin.schoenenberger@us.af.mil
4. SECURITY FORCE AND FIRE PROTECTION: The Base Security Police telephone number is 609-754-6001 and the Base Fire Department telephone number is 911 for reporting a fire. General information telephone number is 609-754-3326.
5. BASE ENTRY: The contractor shall obtain the necessary passes and /or identification for entry into McGuire Air Force Base and Fort Dix for all employees prior to commencement of work. The Government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the Government. The contractor shall be required to provide the Security Forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s) to obtain a pass for entry onto the base. The Pass and Registration building 3021 is located inside the twenty-four (24) hour gate right off of Wrightstown / Cookstown Rd.
6. PERFORMANCE PERIOD: Item should be delivered within a 90 calendar days after contract is awarded.
7. INSPECTION / ACCEPTANCE OF PROJECT COMPLETION: Inspection of equipment will be completed once entire shipment is received all items have been accounted for. Contractor will contact PM to ensure full delivery has been completed.
File details come from the government source that posted it. Updated .