STATEMENT OF WORK.doc

DOC document 102 KB Posted

Attached to
Security Fence and Gate Repair/Replacement at USCG Ant Dulac
Solicitation number
70Z02925QNEWO003
Issued by

About this file

This is a Statement of Work (SOW) for a security fence and gate repair/replacement project for the United States Coast Guard (USCG) Auxiliary Navigation Team (ANT) in Dulac, Louisiana. The scope of work includes removing and replacing approximately 350 linear feet of 8-foot high galvanized chain link fence, 3 strands of barbed wire, straightening and re-cementing leaning posts, replacing damaged posts, installing fence wings, and repairing a gate's rolfers and control box. The project is a small business set-aside with a Firm-Fixed Price contract, using NAICS code 238990, and will be awarded to the lowest-price quoter. The work must be completed within 72 hours after start, with careful coordination required to minimize operational impacts at the Coast Guard facility. Contractors must comply with security protocols, provide employee documentation, and adhere to safety regulations throughout the project execution.

View the file

Other files

File Type Posted
SF1442 CONSTRUCTION.pdf PDF
Construction Terms and Conditions.pdf PDF
WAGE RATE.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK FOR FENCE REPAIR

Department of Homeland Security

United States Coast Guard

Scope of Work For

Fence Repair/Replacement At

U.S. Coast Guard

ANT Dulac, LA.

1 General Contracting Guidelines:

1.1: For the execution of this contract, the contractor shall provide all labor, parts, and materials not described in this Scope of Work. Government Furnished materials will be outlined in this scope of work and will be defined as GFM.

1.2: Contractor shall make all reports to the Contracting Officer/On site supervisor regarding progress of the scheduled work log. If there are questions or concerns regarding the scope of work and/or the work log, the contractor shall not proceed further without guidance from the Contracting Officer.

1.3: Contractor shall provide all necessary documentation for all employees (Valid State ID, Drivers Licenses, etc.). As well any vehicle brought on any Coast Guard/Military Facility shall have valid state registration and insurance.

1.4: Contractor shall execute the contract IAW this Scope of Work. The contractor is not authorized to deviate from this Scope of Work without written authorization from the Contracting Officer.

1.5: The contractor shall provide a list of all employees that will be working on Coast Guard property to the POC prior to the scheduled work days.

2 LOCATION

All work shall take place at:

U.S. Coast Guard ANT Dulac

241 Coast Guard Road Dulac, LA 70353

3 POINT OF CONTACT

The Government Point of Contact and Onsite support/supervisor is MK1 Joseph Fodor, 619-733-1066, Joseph.A.Fodor@USCG.MIL. All work shall be coordinated through both POC to minimize operational impacts to the unit during the execution of the work.

4 WORK PHASING/SCOPE OF WORK

Work shall not commence until all materials are on hand and must be completed within 72 hours after start, due to security concerns on base; Contractor shall coordinate with the POC’s to coordinate phasing and job sequencing. Contractor shall submit construction schedule for Government review and approval prior to commencing in any work to be performed.

4.1: SCOPE OF WORK

All work shall be completed on site. Contractor shall furnish all labor, tools, materials, transportation, equipment, supervision, and personnel to repair/replace security fence at ANT Dulac.

4.2: Contractor provided services A.

Contractor shall remove approximately 350’ of 8’ high 9-gauge galvanized chain link. USCG ANT Dulac will dispose of material once removed.

B.

Contractor shall remove approximately 350’ of 3 strands of galvanized barb wire. USCG ANT Dulac will dispose of material once removed.

C. Contractor will straighten/re cement post that are leaning.

D. Contractor will replace with like kind, any of the 1”, 2”, or 3” by 10 ft high post that need replacement.

D.

Contractor will install like kind approximately 350’ by 8’ Galvanized chain link fence.

E. Contractor will install like kind approximately 350’ 3 strands of galvanized barb wire.

F. Contractor will install 2- 16 foot by 8-foot-high wings at the end of each side of the fence to extend over rocks/water.

G. Contractor will remove four rollers from the gate and install new rollers.

H. Contractor will adjust the gate, rollers, and control box for proper spacing and operation.

I. Contractor will verify with MK1 Fodor that the fence and gate are operating in normal operating parameters.

5 AVAILABILITY OF UTILITIES

Reasonable amounts of the following utilities will be made available to the Contractor without charge.

+ Electricity (if available at the job site) + Potable Water + Restroom facilities

6 COORDINATION

The Contractor shall coordinate with the POC to minimize interference with Coast Guard operations or personnel. All work shall be coordinated with other trades involved in the project and carefully laid out in advance.

7 CONTRACTOR USE OF PREMESES

The Contractor will be working on a Coast Guard operational military installation. Become familiar with and obey installations’ fire, traffic, and security regulations. Personnel shall not stray from the immediate area of work nor direct avenues of ingress and egress unless authorized in advance by the Government.

8 LAYDOWN AREA

The Contractor will be provided with an uncovered lay-down area in the immediate vicinity of the work. The Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings, vehicles, boats, equipment, or pavement because of storage activities.

9 STORM PROTECTION

Should warnings of extreme weather (such as high waves, storm surge, wind of gale force) be issued, the Contractor shall take every practicable precaution to minimize danger to personnel, the work and adjacent property. Precautions shall include, but not be limited to, relocating equipment, closing all openings, removing all loose materials, tools exposed locations, and removing or securing fencing, scaffolding and other temporary work.

10 ENVIRONMENTAL PROTECTION

All Federal, State and local laws must be strictly adhered to. Demolition and construction debris shall be disposed of at a permitted facility.

11 DELIVERY AND STORAGE

Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations. Damaged or defective items/equipment shall be replaced. Location of storage and staging area shall be designated by the POC’s. The contractor will be responsible for the security of all materials and equipment.

12 RECEIPT OF MATERIALS

Shipment of equipment, materials, and supplies shall be addressed to the Contractor - not the Government. The Contractor must be on hand to accept shipments; the Government will not accept shipments.

13 CLEANUP

The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials daily and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters.

14 UTILITY OUTAGES

Before interrupting or shutting down any utility, make a request for the interruption to the POC’s at least two (2) working days before the anticipated interruption. Identify the utility, reason for interruption, proposed time of interruption, and duration of interruption. Do not interrupt utilities until authorized by the POC.

15 SECURITY

15.1 Working Personnel List.

The Contractor shall provide the POC with a list of names of all personnel who will be working on the site. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site.

15.2 Personnel Identification

All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license, or a company issued ID. The identification must be laminated and show a facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises.

16 QUALITY

Quality of Contractor Furnished Material. Materials supplied by the Contractor shall be of a quality conforming to applicable Federal specifications.

17 WARRANTIES

All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government.

18 FINAL INSPECTION AND ACCEPTANCE

When the work is complete and ready for final inspection, submit a written request to schedule the final inspection to the Government. Prior to such requests, all submittals must be complete and approved. Such requests shall allow a minimum of two (2) days’ notice prior to the final inspection date.

19 SAFETY

19.1 General

The Contractor is solely responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property and avoids work interruptions. The Contractor shall provide appropriate safety measures including, but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules and regulations.

19.2 Compliance

The Contractor is specifically required to comply with the requirements of the U. S. Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the “Accident Prevention” clause (FAR 52.236-13). Once accepted, this safety plan shall become part of the contract requirements. Note: This review/acceptance does not in any way relinquish the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations.

File details come from the government source that posted it. Updated .