Statement of Work Summary
This Statement of Work (SOW) dated April 22, 2026, outlines the requirement for the MacDill 6th Communication Squadron to upgrade the power generation system at Hemp Shelter (Building 578) located at 7121 S Boundary Boulevard, Tampa, FL 33621. The contractor shall remove two existing 30kW Capstone microturbines (Serial Numbers 003085 and 003086) along with associated equipment and install a new 60kW diesel generator system to provide reliable and adequate power supply for operations. The scope includes removal of existing diesel fuel tanks (both external and internal day tank), installation of one new 60kW Caterpillar Diesel Generator (Model D60 GC) rated at 277/480 Volts, 3-phase, installation of a new 200-amp, 480-volt, three-phase ASCO 300 Series Automatic Transfer Switch in a NEMA 3R enclosure, and a new 408-gallon UL142 listed diesel fuel tank with all necessary piping and connections.
Deliverables include completion of pre-start inspection, system startup, and a successful 4-hour on-site resistive load test, along with all project drawings, permits, and inspection approvals. The contract includes 2-Year/1000-hour Caterpillar Extended Service Coverage and ASCO Two-Year Limited Warranty. The removal and installation work is a one-time event; however, ongoing preventive maintenance is required every 6 months for fluid and filter changes, with major annual inspections including load bank testing, belt replacement, filter replacement, and fluid changes. Work shall be performed Monday through Friday between 0800-1600 hours, excluding federal holidays and family wing days, with coordination required two weeks prior to completion. Emergency maintenance must be available on a 24/7 basis as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre Solicitation Notice_Hemp Shelter Generator.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
60kW Diesel Generator Upgrade and Installation for Hemp Shelter
STATEMENT OF WORK (SOW)
April 22, 2026
1. Requirement: The activity required is the MacDill 6th Communication Squadron. We require the replacement of the existing power generation system for the Hemp Shelter. The current system, consisting of two 30kw microturbines, needs to be upgraded to a new 60kw diesel generator to ensure a reliable and adequate power supply for operations.
2. Description of Services: The contractor shall provide all necessary labor, materials, and equipment to perform the following services:
• Remove the two existing 30kw Capstone microturbines (SN:003085, and 003086) and the associated automatic transfer switch from the Hemp Shelter (Bldg. 578).
• Remove the existing diesel fuel tank located outside of the shelter and the existing diesel day tank located inside (Bldg. 578) the shelter.
• Install one (1) new 60kw diesel generator in place of the two existing microturbines.
• Install one (1) new 200-amp, 480-volt, three-phase automatic transfer switch.
• Install a new (408-gallon) diesel fuel tank and day tank, including all necessary fuel piping and connections.
• Provide all required engineering and drawings for the project.
• Secure all necessary electrical and fuel permits and manage all related inspections.
3. Services Summary: The contractor shall deliver a complete and operational power generation system. Acceptability will be determined by the successful installation, testing, and commissioning of the following deliverables:
• Deliverables:
• One (1) new Caterpillar Diesel Generator (Model D60 GC), rated at 60KW standby, 277/480 Volts, 3 Phase, with a weatherproof, sound-attenuated enclosure and a 408-gallon UL142 listed fuel tank.
• One (1) new ASCO 300 Series Automatic Transfer Switch, rated at 200-Amp, 480 volts, 3 Phase, in a NEMA 3R enclosure.
• Completion of a pre-start inspection and system startup.
• A successful 4-hour on-site resistive load test.
• All necessary project drawings, permits, and inspection approvals.
• 2-Year / 1000-hour Caterpillar Extended Service Coverage.
• Asco Two-Year Limited Warranty.
• Frequencies:
• The removal and installation work is a one-time event.
• Preventive maintenance service for the generator to include every 6 months for fluid and filter changing. As well as the major inspection every year for load bank testing, replacing belts, filters and fluids.
4. Work Schedule: The maintenance will be coordinated between the contractor and the
6CS/SCP flight two weeks prior to the completion date. Contractors will conduct maintenance
Monday-Friday between 0800-1600 (L). This excludes federal holidays and family wing days.
Contractors will be required to conduct emergency Maintenance 24/7 on a as needed basis.
5. Place of Performance: Work will be performed at the following location:
• MacDill 6th Communication Squadron
• USCENTCOM
• Hemp Shelter (Bldg. 578)
• 7121 S Boundary Blvd
• Tampa, FL 33621 US