This is a Statement of Work (SOW) dated April 22, 2026, for a 60kW diesel generator upgrade and installation project at MacDill Air Force Base for the 6th Communication Squadron.

The contractor shall remove two existing 30kW Capstone microturbines (SN:003085 and 003086) and associated automatic transfer switch, along with existing diesel fuel tanks (both outside and inside Hemp Shelter Building 578), and install a complete new power generation system. The deliverables include one Caterpillar Model D60 GC diesel generator rated at 60kW standby (277/480 Volts, 3-phase) with weatherproof, sound-attenuated enclosure and 408-gallon UL142 listed fuel tank; one ASCO 300 Series 200-amp, 480-volt, 3-phase automatic transfer switch in a NEMA 3R enclosure; pre-start inspection and system startup; a successful 4-hour on-site resistive load test; all necessary project drawings, permits, and inspection approvals; 2-year/1000-hour Caterpillar Extended Service Coverage; and ASCO two-year limited warranty. The contractor must provide all labor, materials, equipment, engineering, drawings, and manage all electrical and fuel permits and inspections. The removal and installation work is a one-time event, with preventive maintenance scheduled every six months for fluid and filter changes and annually for major inspections including load bank testing, belt replacement, and fluid changes. Maintenance work is scheduled Monday-Friday between 0800-1600 hours, excluding federal holidays and family wing days, with emergency maintenance available 24/7 as needed. Coordination must occur with the 6CS/SCP flight two weeks prior to completion. Work is performed at Hemp Shelter (Building 578), MacDill Air Force Base, 7121 South Boundary Boulevard, Tampa, Florida 33621.

View the file

Other files

File Type Posted
AMENDED SOURCES SOUGHT.pdf PDF
SOURCES SOUGHT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

60kW Diesel Generator Upgrade and Installation for Hemp Shelter

STATEMENT OF WORK (SOW)

April 22, 2026

1. Requirement: The activity required is the MacDill 6th Communication Squadron. We require the replacement of the existing power generation system for the Hemp Shelter. The current system, consisting of two 30kw microturbines, needs to be upgraded to a new 60kw diesel generator to ensure a reliable and adequate power supply for operations.

2. Description of Services: The contractor shall provide all necessary labor, materials, and equipment to perform the following services:

• Remove the two existing 30kw Capstone microturbines (SN:003085, and 003086) and the associated automatic transfer switch from the Hemp Shelter (Bldg. 578).

• Remove the existing diesel fuel tank located outside of the shelter and the existing diesel day tank located inside (Bldg. 578) the shelter.

• Install one (1) new 60kw diesel generator in place of the two existing microturbines.

• Install one (1) new 200-amp, 480-volt, three-phase automatic transfer switch.

• Install a new (408-gallon) diesel fuel tank and day tank, including all necessary fuel piping and connections.

• Provide all required engineering and drawings for the project.

• Secure all necessary electrical and fuel permits and manage all related inspections.

3. Services Summary: The contractor shall deliver a complete and operational power generation system. Acceptability will be determined by the successful installation, testing, and commissioning of the following deliverables:

• Deliverables:

• One (1) new Caterpillar Diesel Generator (Model D60 GC), rated at 60KW standby, 277/480 Volts, 3 Phase, with a weatherproof, sound-attenuated enclosure and a 408-gallon UL142 listed fuel tank.

• One (1) new ASCO 300 Series Automatic Transfer Switch, rated at 200-Amp, 480 volts, 3 Phase, in a NEMA 3R enclosure.

• Completion of a pre-start inspection and system startup.

• A successful 4-hour on-site resistive load test.

• All necessary project drawings, permits, and inspection approvals.

• 2-Year / 1000-hour Caterpillar Extended Service Coverage.

• Asco Two-Year Limited Warranty.

• Frequencies:

• The removal and installation work is a one-time event.

• Preventive maintenance service for the generator to include every 6 months for fluid and filter changing. As well as the major inspection every year for load bank testing, replacing belts, filters and fluids.

4. Work Schedule: The maintenance will be coordinated between the contractor and the

6CS/SCP flight two weeks prior to the completion date. Contractors will conduct maintenance

Monday-Friday between 0800-1600 (L). This excludes federal holidays and family wing days.

Contractors will be required to conduct emergency Maintenance 24/7 on a as needed basis.

5. Place of Performance: Work will be performed at the following location:

• MacDill 6th Communication Squadron

• USCENTCOM

• Hemp Shelter (Bldg. 578)

• 7121 S Boundary Blvd

• Tampa, FL 33621 US