Statement of Work - Concrete Pad.pdf

PDF 448 KB Posted

Attached to
FCI Texarkana - Concrete Pad - 15B51521Q00000011 Federal contract opportunity
Solicitation number
15B51521Q00000011
Issued by
Department of Justice Bureau of Prisons Federal Correctional Institution Texarkana

View the file

Other files for this federal contract opportunity

Other files attached to FCI Texarkana - Concrete Pad - 15B51521Q00000011, newest first.
File Type Posted
Cover Sheet and FCI Texarkana Freezer Concrete Pad 15B51521Q00000011.pdf PDF
FCI Freezer Storage Area Geotechnical Report No. G 5575-216 - ETTL 3-11-21.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Bureau of Prisons Federal Correctional Institution (FCI) Texarkana, Texas

Statement of Work (SOW) Construct Concrete Slab Foundation

Project 5D5S Replace Freezers

PART 1 – GENERAL

1.0 SUMMARY

A. The Federal Bureau of Prisons (FBOP) intends to make a single award to a responsible entity for the site preparation and construction of a new concrete foundation at the camp.

B. Strip to remove all top soil, gravel, and other deleterious materials from the subgrade to a minimum of 1 foot below the existing grade.

C. Over excavated a minimum of 4 feet below existing grade and replace with compacted select fill. The over-excavation should extend a minimum of 3 feet beyond the edge of the footing. After the excavation is complete and prior to the placement of fill, scarify the exposed subgrade to a depth of 12 inches, adjust the moisture content to, and maintain it within a range optimum to optimum+4% and re-compact to a minimum density of 98% of the maximum density defined by ASTM D 698(Standard Procter). Maintain specified moisture content until the subgrade is covered with fill or slab.

D. All concrete shall be 3000psi unless noted otherwise E. All concrete shall be installed to elevations and dimensions shown on shop drawings.

F. All concrete flat work shall have a broom finish.

G. All footings shall be poured monolithic. Concrete flat work (slabs) may be poured in sections utilizing a “key way” for cold joints. See detail F/S1 H. All footings shall be a minimum depth of 18”.

I. All reinforcement shall have a minimum of 1 ½ “concrete coverage. Use bar chairs where needed. (Do not allow rebar to come in contact with soil.)

J. All rebar shall be cold formed. Do not use heat to form bent bars or stirrups.

64'-11"

17'-8"17'-8"17'-8"17'-8"

93'-3"

12'-0"

2'-2"

1'-0"

2'-2" 2'-2" 2'-2"

107'-11 4"

100'

23'-0116 "

23'

0'-4"0'-2" Varies

1'-6"

1'-0"

Varies

18" o/c max

0'-4"0'-2"

1'-6"

Varies

1'-0"

0'-4" 0'-4"1'-0" 0'-2"

0'-758"

18" o/c max

0'-4"0'-2"

1'-6"

1'-0"

0'-6"

1'-0"

1'-6"

1'-6"

0'-6"

Varies

2'-0"

2'-0"

0'-4"0'-2"

1'-6"

Varies

1'-0"

0'-4" 0'-4"1'-0" 0'-2"

0'-618"

18" o/c max

U .S

. D E

P A

R

TM

E N

T O

F

JU

S

TI

C E

FE

D

ER

AL

B U

R

EA

U O

F

PR

IS

O

N S

S O

U

TH

C E

N

TR

A L

R E

G

IO

N

St ru ct ur al

S1

Date:No.

Sheet No.

Checked By:

Date:

Sh ee t T itl e:

Drawn By:

Project No.

File No.

Pr oj ec t T itl e:

ER

S

P E

F O

T N E

MT RA

FEDD

CITSUJ

S NOE

O

AL

BU

R E

A U

F

PRI

Legend:

Cut line Direction of View

Detail # Sheet #

BS1

A

CS1

DS1

DS1

Notes:

1. New concrete freezer/cooler foundation.

2. New concrete landing for loading/unloading. Landing shall be 4000psi concrete. 3000psi concrete may be used for footings.

3. #3 rebar 18" o/c each way.

4. #3 bent rebar installed 18" o/c. See detail J/S1.

5. #6 rebar continuous. Maximum 18" o/c. Minimum 18" overlap at all splice joints. Join corners using 4 @ #6 bent bars. See detail G/S1.

6. #3 rebar stirrups 32" o/c. See detail I/S1.

7. #3 rebar stirrups 32" o/c. See detail H/S1. Length of stirrup will vary with ground slope.

8. 2 @ #6 rebar continuous.

9. #6 x 18" rebar dowels 18" o/c.

10. Compacted sand.

11. Compacted fill. Depth will vary with existing soil elevation.

12. 12" asphaltic expansion joint. Apply sealant at finished joint. Sonneborn NP 1 or equal.

13. Formed "key way" for cold joint in concrete slabs.

14. Existing elevation.

15. New finished grade.

16. Existing Asphalt

= 99'-11"

= 99'-4 78"

= 99'-3 38"

= Elevation

= 99'-3 38"

= 99'-3 38"

= 99'-3 38"

General Notes:

1. All concrete shall be 3000psi unless noted otherwise.

2. All concrete shall be installed to elevations and dimensions shown on drawings.

3. All concrete flatwork shall have a broom finish.

4. All footings shall be poured monolithic. Concrete flatwork (slabs) may be poured in sections utilizing a "key way" for cold joints. See detail F/S1.

5. All footings shall be a minimum depth of 18".

6. All reinforcement shall have a minimum of 1 12" concrete coverage. Use bar chairs where needed. (Do not allow rebar to come in contact with soil.)

7. All rebar shall be cold formed. Do not use heat to form bent bars or stirrups.

8. Walk-ins shall be anchored using Hurricane Anchors provided by Polar King and shall be installed as per manufacturers specifications. See detail K/S1 (by Polar King)

B D

C

F

G

H I

J

3 3

23 3

4 4

6 7

9 9

12 13

CS1CS1CS1ES1

DS1

E

Typical

= 99'-09" = 97'-11"

= 97'-02"

= 98'-09 3/8"= 98'-07"

= 98'-09 3/8"

Revisions

FC

I T

EX

A

R K

A N

A

5D5S

R

EP

LA

C

E

FR

EE

ZE

R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text North

AutoCAD SHX Text East

AutoCAD SHX Text West

AutoCAD SHX Text South

AutoCAD SHX Text Plan

AutoCAD SHX Text North

freezer pad5.pdf
Sheets and Views
FREEZER PAD-3 S1

File details come from the government source that posted it. Updated .