Statement of Work_Coast Guard Cleat Replace and Repairs.pdf

PDF 260 KB Posted

Attached to
Replace Corroded Cleat on Base Alameda Pier
Solicitation number
31090PR260000347
Issued by

About this file

Statement of Work Summary: Replace Cutter Berth Cleat at Coast Guard Base Alameda

This Statement of Work (SOW) defines requirements for contractor services to remove and replace Cleat number 16:J at Coast Guard Base Alameda in Alameda, California. The primary objective is to preserve moorage capabilities for operational Coast Guard Cutters homeporting at the base. All work must be coordinated around operational schedules and completed within 60 calendar days from the start date.

The contractor shall perform four primary tasks: (1) Project Management, including designation of a single point of contact, coordination with the USCG Contracting Officer's Representative, and acquisition of all necessary federal, state, and local permits; (2) Remove and Replace Cleat number 16:J in-kind; (3) Provide preservation coating matching the existing finish; and (4) Site Cleanup and Restoration, including daily removal of construction materials and debris. The replacement cleat must be a 24-inch cleat with 15-ton capacity and powder coat protective coating matching existing specifications. All submittals, including indented product details and intended project schedule with at least five business days advance notice of mobilization, must be provided within 10 business days of award. Work shall be performed 7:00 AM to 5:00 PM, Monday through Friday, excluding Federal Holidays. All contractor personnel require background checks, Real ID-compliant identification, and security clearance at least 14 days prior to project start. The contractor bears all costs for equipment, materials, transportation, labor, and tools. Government may provide potable water and electrical power where available. Final acceptance is granted by the USCG Contracting Officer's Representative following final inspection confirming completion of all tasks, compliance with technical and safety standards, and full site restoration, with final payment withheld until deficient items are corrected.

View the file

Other files

File Type Posted
Replace Pier Cleat Questions and Answers_10 Aug 2026.pdf PDF
Replace Cleat Solicitation.pdf PDF
BASE ACCESS FORM.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) for Replace

Cutter Berth Cleat at Coast Guard Base Alameda

Coast Guard Island, Alameda, CA

1.0 Introduction/Background

This Statement of work (SOW) defines the requirements for a contractor to provide all necessary labor, materials, tools, equipment, and supervision to remove and replace Cleat number 16:J at the waterfront of Coast Guard Base Alameda, in Alameda California. The contractor shall be responsible for all aspects of the project as detailed in this document and in accordance with all applicable industry standards and USCG regulations. This work on moorage equipment supporting operational Coast Guard Cutters – the schedule of work must be coordinated around operational schedules.

2.0 Objective

The primary objective of this project is to preserve moorage capabilities for the operational Coast Guard Cutters that homeport out of Base Alameda.

3.0 Scope of Work

3.1 Tasks

The contractor shall:

• Task 1: Project Management

• Designate a single point of contact for all project communications.

• Coordinate all work with USCG Contracting Officer’s Representative (COR) or designated POC.

• Obtain all necessary federal, state, and local permits.

• Task 2: Remove and Replace (“in-kind”) Cleat number 16:J

• Task 3: Provide preservation coating to match existing

• Task 4: Site Cleanup and Restoration

• Upon completion, and on a daily basis, remove all construction materials and debris, disposing of them offsite.

3.2 Submittals

The contractor shall submit the following for Coast Guard Approval before getting approval to start work. All submittals shall be provided to the Coast Guard within 10 business days of award.

• Indented product details for replacement cleats.

• Intended Project Schedule - contractor shall give government at least 5 business days advance notice of indented mobilization.

4.0 Period of Performance

All work shall be complete within 60 calendar days from the start date.

5.0 Laydown and Material Storage

The Coast Guard POC will coordinate an appropriate amount of storage space as necessary for equipment and material storage during the project. The contractor is responsible for maintaining the security of this space and their equipment. This space shall be kept tidy at all times.

6.0 Technical Requirements

6.1 Codes and Standards

All work shall comply with the most current editions of all applicable federal, state, and local codes, all applicable industry standards, and the following USCG-specific standards:

• U.S. Coast Guard Safety and Environmental Health Manual, COMDTINST M5100.47(series)

• OSHA Regulations

6.2 Materials and Workmanship

All materials shall be new and conform to the specifications detailed in the table below:

Replacement Cleat • 24” Cleat

• 15 Ton Capacity

• Powder Coat Protective Coated – Match existing

7.0 Personnel Security and Base Access

• Background Checks: All contractor personnel requiring access to the USCG facility must successfully pass a background check as required by USCG security policies, which may include a National Crime Information Center (NCIC) check. The contractor shall submit personnel information to the USCG COR 14 days prior to the project start date.

• Access Request: For access to the USCG facility, the contractor is required to submit the name and birthdate for each employee on the approved access request form at least 72 hours before their first day on site (this form will be provided after award).

Personnel not listed may be denied access to the Coast Guard facility.

• Identification: A Real ID-compliant driver's license or other federally approved identification is required for base access. Acceptable forms of ID include: US Government Dependent ID, Federal PIV Card, TWIC Card, Veteran Health Identification Card, US Passport, or Permanent Resident Card. Driver's licenses from states that are not Real ID compliant will not be accepted.

• Vehicle Requirements: All contractor vehicles must have valid registration and insurance, and all vehicle operators must have a valid driver's license. Vehicles shall always stay on marked and paved roads – vehicles are not permitted to drive or park on the grass at any point in this project performance without written approval from the Coast Guard. Any damage from driving or parking on the grass, to include the sprinkler system, shall be the responsibility of the contractor to repair.

• Conduct: Contractor personnel shall adhere to all base regulations, traffic laws, and security protocols. Contractors must wear company identifying clothing/badging/safety gear, and all contractor vehicles must display company or subcontractor decals.

8.0 Work Hours

Work shall be performed between the hours of 7:00 AM and 5:00 PM, Monday through Friday, excluding Federal Holidays, unless otherwise approved in writing by the Contracting Officer, COR or USCG POC.

9.0 Safety and Environmental Protection

All operations must comply with the USCG Safety and Environmental Health Manual, COMDTINST M5100.47 (series). The contractor is responsible for proper handling and disposal of any hazardous materials and for immediately reporting and containing any spills.

10.0 Government Furnished Services

The Government may furnish potable water and electrical power at no cost to the contractor where available. All electrical connections shall be in accordance with the National Electric Code. The contractor shall provide and use ground fault circuit interrupter (GFCI) devices when connecting to Government power sources.

11.0 Travel Requirements

All costs associated with the transportation of equipment and materials are to be included within the Contractor's proposal.

12.0 Transportation

All costs associated with the transportation of equipment and materials are to be included within the Contractor's proposal.

13.0 Acceptance Criteria

Final acceptance of the work will be granted by the USCG COR after a final inspection confirms that all tasks in this SOW have been completed, the installation meets all technical and safety standards, and the site has been fully restored. Final payment will not be released until all deficient items have been corrected.

14.0 Coast Guard Technical Point of Contact

Primary POC for this Task is: LCDR Bethany Stafford – 571-608-9734

Secondary POC for this Task is: LCDR Troy Robison – 571-607-1538

APPENDIX A: Site Drawings and Site Conditions

Overall Waterfront Picture Condition of Cleat to be Replaced (16:J)

File details come from the government source that posted it. Updated .