STATEMENT OF WORK CGC Venturous.docx
DOCX document 24 KB Posted
- Attached to
- CGC VENTUROUS Rudderpost Packing
- Solicitation number
- 70Z080-20-Q-P45K9500
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REPS CERTS CGC Venturous.docx | DOCX document | |
| WAGE DETERMINATION CGC Venturous.docx | DOCX document | |
| DRAWING CGC Venturous.pdf | ||
| PROVISIONAL CLAUSES (005) CGC Venturous.docx | DOCX document | |
| RFQ SF18 (007) CGC Venturous.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
70Z080-20-P-P45K9500 CGC VENTUROUS Rudder Packing
1. BACKGROUND
CGC VENTUROUS is currently experiencing water intrusion on both rudderposts, with a combined leak rate of less than 50 gallons per day. The starboard rudderpost packing was replaced in December 2018. Port and starboard stuffing box damage is suspected, limiting the longevity of repairs. Repacking both rudders is a temporary solution until permanent repairs can be made to the rudders in a drydock.
Government-Furnished Property. ½” braided shaft packing material
2. REFERENCE
Drawing 627-WMEC_562_001, Rev H, Arrg’t & Details Rudder Stocks, Bearings, & Stuffing Box
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.1.1.1 Visual Inspection
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures- General. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.3.1.Protective measures- Rudder Specific. Provide suitable covering to protect all exposed rudder and vessel components against contamination during the performance of the work specified herein. Ensure that rudder stock/ shaft surfaces are supported in a minimum of two locations, at all times, until reinstallation.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Interferences include, but are not limited to: deck plates, deck plate supports, structural supports, limited access to work areas.
3.1.5 Operational Test- Initial. Prior to the commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the rudder angle indicator system and the steering system. The steering shall be operated in all modes of control to demonstrate existing operational condition. Document degrees of motion in both port and starboard directions.
3.1.6 Temporary Access Openings. Due to limited access to work areas, the Contractor may, with express permission of the KO (via submission of a CFR), cut access holes to facilitate accomplishment of the work specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.
3.1.7 Divers. Temporarily seal both rudderposts from the outside using a suitable material to prevent the intrusion of water during repairs. Remove the material upon completion of repairs.
3.2 Removal. Using Coast Guard Drawing 627-WMEC_562_001as guidance, the Contractor shall disconnect and remove the port and starboard rudder stuffing box glands and remove all packing material.
3.3 Inspections. The Contractor shall clean the stuffing box assemblies, and accomplish the below specified inspections.
3.3.1 Visual or Borescope. The Contractor shall clean and visually inspect all components including but not limited to: rudder stock/ shaft, stuffing box packing ring, stuffing box gland, and grease passages for signs of excessive wear and other mechanical defects such as nicks, cracks, and corrosion, as applicable. Submit CFR.
3.4 Reinstallation. Repack the port and starboard rudder stuffing box packing ring with new packing and grease IAW CG Drawing 627-WMEC_562_001. Add up to two additional rings of packing in each stuffing box if necessary or as directed by a Coast Guard Inspector. Ensure flax rings for the packing are cut to fit with square butts, oiled, and joints staggered. Reinstall the stuffing box gland as shown on CG Drawing 627-WMEC_562_001 and ensure all grease lines are free from obstructions and are providing grease to the gland. Renew degraded hardware on the packing glands if necessary.
3.5 Operational Test- Post Repairs. After completion of work and in the presence of a Coast Guard Inspector, the Contractor shall thoroughly test and demonstrate the rudder system to ensure it is in satisfactory operating condition.
4.0 ADMINISTRATION.
4.1 CONTRACTOR PERSONNEL
4.1.1 Qualified Personnel.
The Contractor shall provide qualified personnel and subject matter experts to perform all required tasks specified in this SOW.
4.1.2 Employee Conduct.
Contractor employees shall present a professional appearance and their conduct shall not reflect discredit upon the U.S. Government, and any involved Departments or Agencies.
4.1.3 Conflict of Interest.
The Contractor shall not employ any person who is an employee of the U.S. Government if that employment would, or would appear to cause, a conflict of interest. The Contractor shall take appropriate precautions as delineated in the Federal Acquisition Regulation (FAR) to preclude actual or apparent conflicts of interest.
4.2 PERIOD OF PERFORMANCE.
24 Aug 2020- 28 Aug 2020
4.3 PLACE OF PERFORMANCE.
CGC VENTUROUS
600 8th Ave SE ST Petersburg, FL 33701 POC: LT Kevin Stevens
*THIS STATEMENT OF WORK IS SOLELY FOR MARKET RESEARCH*