This is a Statement of Work for exterior door repair and refurbishment services at the U.S. Coast Guard Cutter Greenbrier in Natchez, Mississippi. The project (Project Number 25-150) requires the contractor to furnish all labor, tools, equipment, and materials to refurbish 10 exterior doors and completely replace 1 exterior door on the CST & UPH multi-mission building. Base bid work includes scraping, sanding, priming, and applying UV-resistant weather paint to all doors and frames; replacing door closers, weather stripping, lock sets (Accentra brand, keyed alike), panic devices, and strike plates; re-caulking frames; performing leak testing; and disposing of all waste. The contractor must also supply and install a new door leaf for the right lead of Door #6. The total contract performance period is 14 days, with work performed Monday through Friday from 7:00 a.m. to 4:00 p.m. unless otherwise approved by the Coast Guard.

The contractor is responsible for all site safety, environmental compliance (including RCRA and hazardous waste manifesting), utility connections, temporary toilet facilities, daily cleanup, and proper disposal of construction debris with receipts submitted within 10 working days. Prior to work commencement, the contractor must submit personnel rosters (with valid Government-issued identification required on-site), a construction progress schedule, safety plan, product data sheets, and operation/maintenance manuals. All personnel must be approved and listed before accessing the government property. The contractor shall coordinate staging and laydown areas with the Coast Guard, implement containment and dust control measures, and comply with all federal, state, and local safety, environmental, and security regulations. The work location is 44 L.E. Barry Road, Natchez, MS 39120, with site visit arrangements made through Chief Patrick Holom at Patrick.T.Holom@uscg.mil or (907) 351-0794.

View the file

Other files

File Type Posted
SF1442.docx DOCX document
Construction Clauses (Mar) 2025.odt ODT document
Wage Rate.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT SPECIFICATIONS

EXTERIOR DOOR REPAIR/ CST & UPH MULTIMISSION BUILDING

AT

UNITED STATES COAST GUARD

CGC GREENBRIER,

NATCHEZ, MS 39120

PROJECT NUMBER 25-150

JANUARY 2026

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1. GENERAL DESCRIPTION

1.1.1. General Work Requirements

This is the detailed portion of the scope of work. For example:

Furnish all labor, tools, equipment, and materials for refurbishment of 10 exterior doors and complete replacement of 1 exterior doors CGC GREENBRIER CST and UPH multi-mission building at the U.S. Coast Guard GREENBRIER moorings in Natchez, MS.

The Base Bid work generally includes, but is not limited to, the following:

A. Contractors shall scrape, sand, prime, and use UV resistant outside weather paint on all doors and frames.

B. Provide paint samples to Coast Guard Representative C. Replace door closers for all doors.

D. Clean out old caulk and re caulk frames to interior and exterior wall finishes.

E. Change out all weather stripping on doors.

F. Change out all closures on doors.

G. Change out all lock sets on doors.

H. All new lock sets to be Accentra lock sets keyed alike.

I. Change out all panic devices on doors with panic devices.

J. Change out all strike plates on door frames.

K. Adjust all doors to allow them to properly close.

L. Supply and install a new door leaf for the right lead of Door #6 in the pictures attached.

M. All labor, equipment, and material needed to perform work.

N. Perform leak test with chalk and water test.

O. Dispose of all waste generated and disposed of properly.

1.1.2. SPECIFIC WORK REQUIREMENTS

A. Qualifications

1.1.3. SPECIAL WORK REQUIREMENTS

A. Provide all license, labor, equipment, supervision, and insurance to complete the items listed above.

B. Comply with all hot work requirements of the Coast Guard unit.

C. Coordinate all staging and laydown areas with the Coast Guard prior to work starting.

1.2. TEMPORARY FACILITIES OR UTILITIES

None required.

1.3. PROJECT PERFORMANCE PERIOD

A. The total contract performance period shall include not only the time needed to complete the base bid and approved option items, but it also includes the time needed to submit, review, and approve all material submittals, and complete all project record (closeout) documents. After work begins at the site, perform the work continuously during normal working hours of 0700-1600 Monday- Friday and show daily progress until all work is complete.

B. The total contract performance period is 14 days.

1.4. LOCATION

The work is located at:

U.S. Coast Guard Cutter GREENBRIER 44 L. E. Barry Rd Natchez, MS 39120 Arrangements for visiting the site may be made by contacting:

Chief Patrick Holom Email: Patrick.T.Holom@uscg.mil Telephone: (907) 351-0794

1.5. DRAWINGS ACCOMPANYING SPECIFICATION

There are no drawings accompanying this specification.

1.6. WORK HOURS

1.6.1. Normal Working Hours

A. Perform all work at the site from Monday through Friday from 7:00am to 4:00 pm, unless otherwise approved. This project requires a special schedule to prevent operational interruptions during the installation process. Please refer to the scope section for detailed coordination of working hours. The contractor shall plan a schedule to minimize disruptions to building operations.

B. Performing the work beyond the listed working hours is at the discretion of the Coast Guard unit and the contractor must gain prior approval.

1.7. SPECIFIC ENVIRONMENTAL REQUIREMENTS

Work Practices: Implement containment (plastic sheeting), seal vents, post signs, and use wet cleaning/HEPA vacuums for cleanup.

1.8. SAFETY PROGRAM

1.8.1. General

The Contractor is wholly responsible for work site safety. Implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property and avoids work interruptions. Provide appropriate safety measures including but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable federal, State and local safety laws, rules and regulations.

1.9. AVAILABILITY OF UTILITY SERVICES

A. Reasonable amounts of the following utilities will be made available to the Contractor without charge.

(1) Electricity, and

(2) Potable Water.

B. The Contractor shall pay all costs incurred in connecting, converting, and transferring the utilities to the work. The contractor shall be responsible for making connections including providing back flow preventers, transformers and for disconnection. The contractor shall provide temporary toilet facilities for their personnel.

1.10. UNDERGROUND AND CONCEALED UTILITIES

A. Any utility locations provided are diagrammatic, not exact.

B. Physically verify the location and elevation of the existing underground and concealed utilities local to the work area. Employ techniques to scan the construction site including electromagnetic and sonic equipment prior to commencing the work. Mark the surface of the ground where existing underground utilities are discovered.

1.11. UTILITY OUTAGES

Identify the utility, reason for interruption, proposed time of interruption, and duration of interruption. Do not interrupt utilities until authorized by the Contracting Officer’s Representative (COR).

1.12. CONTRACTOR USE OF PREMISES

The work shall be performed on a Coast Guard operational military installation. Become familiar with and obey station fire, traffic, and security regulations. Personnel shall not stray from the immediate area of work or direct avenues of ingress and egress unless authorized in advance by the COR. Isolate each construction area with temporary partitions and dust controls. Provide movable high-visibility safety fencing about all work areas and equipment laydown areas located outdoors. Provide temporary covers on excavations that remain open overnight.

1.13. CLEANUP

The Contractor shall keep the work area, including the laydown and storage area, free from accumulations of waste materials on a daily basis and comply with all federal, state, and local regulations pertaining to the storage, transport, and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles, or dumpsters.

1.14. ENVIRONMENTAL

1.14.1. Protection of the Environment

The Contractor shall comply with all applicable federal, state, and local laws and regulations for the protection of the environment, including but not limited to the Endangered Species Act (ESA), Bald and Golden Eagle Protection Act (BGEPA), the Migratory Bird Treaty Act (MBTA), National Historic Preservation Act (NHPA), the Resource Conservation and Recovery Act (RCRA), and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA).

1.14.2. Generated Waste

A. Any waste generated because of the project shall either be recycled or be disposed of in accordance with RCRA requirements.

B. Any hazardous waste shall be manifested off site with the Coast Guard unit listed as the Generator and signatory. Any hazardous waste shall be analyzed, characterized, stored, and disposed of in accordance with RCRA and all applicable federal, state, and local laws and ordinances.

C. Hazardous waste shall be properly transported and delivered to an appropriate facility. The Contractor shall submit for COR approval the proposed disposal facility, qualifications of the transporters, and the draft hazardous waste manifest.

1.15. DISPOSITION OF MATERIALS

A. All materials including construction debris and equipment shall be removed from Government property. The Government will not be responsible for the condition or loss of, or damage to, such property after notice to proceed. Materials and equipment shall not be viewed by prospective purchasers or sold on the site.

B. The Contractor shall submit the disposal receipt from the landfill within 10 working days of disposal.

1.16. STORM PROTECTION

The Contractor shall take every practicable precaution to minimize danger from storms to personnel, the work, and to adjacent property. Precautions shall include, but not be limited to, closing all opening, removing all loose materials, tools, and equipment from exposed locations, and removing or securing scaffolding and other temporary work.

1.17. RECEIPT OF MATERIALS

The Contractor is responsible to receive all equipment, materials, and supplies.

1.18. DELIVERY AND STORAGE

The Contractor is responsible for the proper transport and storage of all equipment and materials.

1.19. SECURITY

A. Submit a list of the names of all personnel working on the project site prior to the preconstruction conference for approval. The roster shall be submitted via email, and at a minimum, include the first name, last name, job description, and company of employment.

B. Immediately submit a new list upon a change in on-site project personnel. Refer to the paragraph titled, Special Notice Prior Notification, for notification requirements. Only personnel on the approved list are allowed onto the project site.

C. All approved personnel shall carry a valid, Government-issued identification while on Government property in conformance with the Real ID Act of 2005. Non-compliant personnel shall be escorted off Government property.

1.20. FINAL INSPECTION AND ACCEPTANCE

A. Electronically submit a written request for final acceptance to the Coast Guard.

1.21. WARRANTIES

A. Endorse all warranties or guarantees to the Government.

1.22. TRAINING

A. The Contractor shall provide training to unit personnel in the operation of the equipment. The Operation and Maintenance Manuals shall be approved and provided to the unit prior to the training.

1.23. SUBMITTALS

A. Submittals will be reviewed by the Coast Guard and returned within 10 working days after receipt, unless otherwise stated.

1.24. SUBMITTAL LIST

A. ROSTER OF PERSONNEL

(1) As required by the paragraph titled Security.

B. PROJECT SCHEDULE

(1) Prepare a Construction Progress Schedule. It shall include all major milestones and events for the entire duration of the construction contract.

C. SAFETY PLAN

(1) At a minimum, describe the general safety program and identify specific safety provisions for hazards incidental to the contract work such as elevated working surfaces, or similar conditions of the work. Comply with the paragraph titled Safety Program.

D. PRODUCT DATA

(1) Submit the product data sheet for each manufactured item. It shall include the manufacturer's descriptive literature of cataloged products, equipment drawings, diagrams, performance and characteristic curves and catalog cuts. Submit complete descriptive data for each type of material. Clearly mark data to indicate the type of material to be provided.

1.24.2. OPERATION AND MAINTENANCE MANUALS

A. Submit electronically and provide the following:

(1) Contact information for the prime contractor, sub-contractor, and major equipment vendor/supplier;

(2) Warranty information;

(3) Test procedures;

(4) Results of all testing and commissioning procedures;

(5) Performance data;

(6) A control sequence describing start-up, operation and shut-down instructions;

(7) Installation instructions;

(8) Maintenance instructions;

(9) Operating instructions;

(10) Parts list.

-- End of Section --

Door #1

Door 1

Door 2

Door 2

Door #3

Door #3

Door #4

Door #4

Door #5

Door #5

Door #6

Door #6

Door #7

Door #7

Door #8

Door #8

Door #9 Set

Door 10

Door 10

Door #11

Door #11 Section 01 11 00 image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.jpeg image22.jpeg image23.jpeg image24.jpeg