Statement of Work Bowling Lane Conditioning Machine_revised_draft.pdf
PDF 156 KB Posted
- Attached to
- Bowling Lane Conditioning Machine
- Solicitation number
- FA4484BLCMNW
About this file
This Statement of Work (SOW) details the replacement of a Lane Conditioning Machine at the FSS Lakehurst Bowling Center, located at JBMDL Bldg. 489 in Lakehurst, NJ. The project involves replacing an Old Model B Lane Conditioning Machine with a new state-of-the-art Easy Touch Lane Conditioning Machine, which will improve cleaning and conditioning operations. The contractor will be responsible for providing all necessary supplies, equipment, and training, assembling parts and making adjustments, and performing test runs to ensure proper machine functionality.
The timeline for delivery and installation will be determined after approval and fund availability, with an estimated installation, test run, and training period of approximately 2 hours. Acceptance will be conducted by Bowling Staff through an initial delivery inspection and a final test operation inspection. Payments will be processed by the NAF Accounting Office, contingent upon Point of Contact (POC) authorization. The primary government point of contact is Mr. Michael Hanlon from the FSS Lakehurst Bowling Center, who can be reached at michael.hanlon@us.af.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7767038
Statement of Work Lakehurst Bowling Lane Conditioning Machine Replacement
Scope Old Model B Lane Conditioning Machine is being replaced by a new state of the art Easy Touch
Lane Conditioning Machine to help perform better cleaning and conditioning operation.
Contractor will provide all necessary supplies, equipment, and Training needed to perform the operation of the Machine. Contractor will assemble any parts, equipment and adjustments needed to operate machine. Contractor will perform a Test run on both cleaning and oiling procedures to make sure everything is working properly.
Merchandising: All merchandising will be adhered to as specified on the vendor's quote.
Timeline: Delivery and installation date will be determined once approval and funds are available to purchase. Estimated time of installation and test run and training is approximately 2 hours.
Place of Performance:
FSS Lakehurst Bowling Center, JBMDL Bldg. 489, Saniuk RD Lakehurst NJ 08733
Acceptance and Payment:
Replacement machine will be inspected by the Bowling Staff upon delivery and a final inspection will be performed after test operation to determine if replacement is acceptable.
Payments will be made by the NAF Accounting Office. The contractor shall be financially compensated only if POC authorization is granted.
Government Points of Contact:
Mr. Michael Hanlon (FSS Lakehurst Bowling Center) michael.hanlon@us.af.mil
HANLON.MI Digitally signed by
HANLON.MICHAEL.GEORGE.127
CHAEL.GEOR DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, GE.1277767 cn=HANLON.MICHAEL.GEORGE.
1277767038 Date: 2025.03.14 13:21:48 -04'00' mailto:michael.hanlon@us.af.mil
| HANLON.MI |
| GE.1277767 038 |
File details come from the government source that posted it. Updated .