Statement of Work Borescope 2 Main Engine HP Turbines.pdf

PDF 476 KB Posted

Attached to
Borescope Inspection of Class Main Engine High Pressure Turbine
Solicitation number
N4523A24R0308
Issued by

About this file

This document is a Statement of Work (SOW) for a borescope inspection of two Main Engine (ME) High Pressure (HP) Turbine Nozzle Plates on a CVN 68 Class vessel at the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) in Bremerton, Washington.

The SOW requires the contractor to provide borescope inspection services to access the Nozzle Plates through the 1st Stage Resistance Temperature Detector (RTD) Thermowell, using equipment capable of reaching a minimum of 8 feet vertically and horizontally inside the turbine. The work must be performed in compliance with the referenced Northwest Regional Maintenance Center Local Standard Item 099-12NW and the Nuclear Power Manual. The period of performance is April 15, 2024 through April 19, 2024. The contractor must obtain a Defense Biometric Identification System (DBIDS) credential for unescorted access to the installation. The Government will provide rigging services and electrical power. The contractor must submit high resolution photographs and videos of the Nozzle Plate Vanes within 72 hours of completing the borescope inspection.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

Borescope Inspection of CVN 68 Class Main Engine High Pressure Turbines

1. GENERAL INFORMATION:

Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) requires borescope inspection of 2(ea.) Main Engine (ME) High Pressure (HP) Turbine Nozzle Plates.

1.1. SCOPE:

1.1.1 Provide borescope inspection services for 2(ea.) ME HP Turbine Nozzle Plates. Access to Nozzle Plate will be through the 1st Stage Resistance Temperature Detector (RTD) Thermowell.

2. REFERENCES:

2.1. Northwest Regional Maintenance Center Local Standard Item 099-12NW.

2.2. Nuclear Power Manual (NPM) CLEAN-A-3

3. REQUIREMENTS:

3.1. LOCATION OF WORK: Puget Sound Naval Shipyard (PSNS&IMF), Bremerton, Washington.

Onboard the vessel.

3.1.1. Contractor employees require access to the Main Engine Room No. 2 (7-165-0-E).

3.2. PERIOD OF PERFORMANCE: 04/15/2024 – 4/19/2024

3.3. Planning, supervising, or performing nuclear work is NOT authorized without the express approval of Code 300N, Code 1200N, Code 2300, AND Code 105.

3.4. SECURITY REQUIREMENTS:

3.4.1. Defense Biometric Identification System (DBIDS) Program: Commander, Navy Installations Command (CNIC) has established the Defense Biometric Identification System (DBIDS) for access control to CNIC Installations via Entry Control Points (ECP). DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

3.4.2. The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

3.4.3. Access to Installation. All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS). The Contractor shall provide the Contracting Officer with the name of their designated Service

Contractor Administrator (SCA) for enrollment in DBIDS. Contact the Contracting Officer’s Representative (COR) or Contracting Officer’s Security Officer for assistance as needed.

Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.

3.4.4. DBIDS Credentials. Contractor employees shall furnish a completed copy of the SECNAV

5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at:

https://www.cnic.navy.mil/om/dbids.html. (NOTE: All requests must be received 15 to 30 business days prior to desired access date).

3.4.5. Unescorted access requires authenticating an individual’s identity and determining their fitness using the following guidelines:

3.4.5.1. Identity Proofing. The process of providing sufficient information (e.g., identity history, credentials, and documents) when attempting to establish an identity. The following credentials are identity proofed at the card issue site from federally authorized identity documents, and will be considered identity proofed. CAC, Uniformed Services Identification (ID) Card issued to military retirees and military family members, Non-DoD Federal Personal Identification Verification, United States (U.S.) Passport or Passport Card, Foreign passport that contains a temporary I-551 stamp or temporary I-551 printed notation on a machine-readable immigrant visa, or others listed in reference (a) and chapter 16. (Note: While certain identification is approved for identity proofing, in order to register a visitor into DBIDS, the visitor must have an ID with an ID number associated. U.S. Citizens are required to provide their Social Security Number (SSN), Certificate of Naturalization or Taxpayer ID Number to receive a DBIDS pass to access the installation).

3.4.5.2. Vetting. An evaluation of an applicant or card holder’s character and conduct for approval, or denial of the issuance of an access control credential for physical access.

The SECNAV 5512/1 is the sole means to initiate background checks on all visitors and/or contractors/vendors. Every background check for the purpose of access control requires completion of SECNAV 5512/1 for accountability purposes.

3.4.6. Personnel requiring access for 31 days or more will be issued a DBIDS card once all required documentation is provided to the VCC and registration is completed. Visits for 30 days or less will receive a paper DBIDS pass.

3.4.7. DBIDS passes require a picture and fingerprints for all visitor registrations. Failure to provide either can result in denial of base access for escorted or unescorted access.

3.4.8. Pre-enrollment. DBIDS pre-enrollment is available at https://dbids-usfj.dmdc.mil/portal/.

3.4.9. Coordinate all contractor employee badging and security issues via the Government representative: Reginald Deriso, (360) 627-3374.

3.5. GOVERNMENT REPRESENTATIVE

3.5.1. Contracting Officer Representative (COR): Located within the contract.

3.6. TECHNICAL WORK REQUIREMENTS:

3.6.1. Accomplish the requirements of 099-12NW, paragraphs 3.1 through 3.1.1, 3.4 through 3.7.4, 3.10, 3.14, and 3.20 of 2.2.

3.6.2. Assist on-site HP Turbine subject matter expert (SME) with inspecting two (2) separate ME HP Turbine Nozzle Plates via borescope equipment.

3.6.2.1. Entrance point will be the through the first stage RTD thermowell, which is approximately 1.625 inches in diameter.

3.6.2.2. Borescope equipment must have the ability to reach a minimum of eight (8) feet vertically and horizontally inside the turbine.

3.6.2.3. All borescope equipment crossing the Steam Plant Clean boundary shall be Steam Plant Clean IAW 2.2, paragraph 4.10.3 and 5.2.

3.6.3. Submit all required pictures and videos from both main engine turbines to the SME.

4. QUALITY:

4.1. Quality Assurance Surveillance Plan (QASP): The Quality Assurance Surveillance Plan (QASP) is a tool the Government utilizes to verify the contractor is performing all services and delivery/installation of replacement parts required by the above requirements in a timely, accurate and complete fashion.

5. DELIVERABLE ITEMS:

Number Name Frequency Quantity

A001

3.6.3. List of Deliverables: High

Resolution Photographs / Video (via electronic media) of all Nozzle Plate Vanes.

72 hours from completion of Borescope inspection

ONE TIME

6. GOVERNMENT TO PROVIDE

6.1. Rigging services

6.2. Electrical power