STATEMENT OF WORK Boat Storage.pdf

PDF 148 KB Posted

Attached to
Boat Storage Service
Solicitation number
N6817124Q0117
Issued by

About this file

This document is a Statement of Work (SOW) for the provision of boat storage services. The SOW describes the requirement to provide secure, climate-controlled storage for a 52-foot Chris Craft vessel with a 14-7/8 inch beam and a hoisting weight of 40,000 lbs. The period of performance is from September 2, 2024 to February 1, 2025.

The key requirements include: 1) Accomplishing a joint inspection with the Contracting Officer's Representative (COR) to verify the storage facility meets specified criteria such as security, protection from weather and environmental factors, and fire safety measures; 2) Submitting a dry berthing plan to the COR within 5 days of contract award; and 3) Safely dry berthing the boat in the approved storage facility. The contractor must also facilitate scheduled access for government and authorized personnel to survey the boat during the storage period. The SOW is associated with a pre-solicitation notice for a "Boat Storage Service" procurement by the Department of the Navy, Naval Supply Systems Command.

View the file

Other files

File Type Posted
Sources Sought Notice Boat Storage.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Description: Provide boat storage, in accordance with the Statement of Work (SOW).

1. Scope:

1.1 Title: Boat Storage

1.2 Current Location of the Boat:

Antico Cantiere del Legno Aprea, Via del Mare 43 – 80067 Sorrento (NA)

1.3 Identification:

1.3.1 Quantity: One (1) Each, 52-foot Chris Craft, 14-7/8 in beam, hoisting weight 40,000 LBS.

1.4 Period of Performance: 2 SEP 2024 – 1 FEB 2025

2. References: None.

3. Requirements:

“Checkpoint – Joint Inspection”

3.1 Accomplish a joint inspection with the Contracting Officer’s Representative (COR) of the Storage Facility verifying the requirements listed in 3.1.1 to 3.1.7. (See Note 4.1)

3.1.1 Storage shall be in a contractor controlled secure facility. The Barge shall be protected from inclement weather, damaging effects of moisture, extreme cold or heat, and prolonged exposure to sunlight.

3.1.2 The storage facility shall be free of damaging effects of vermin.

3.1.3 The storage facility shall allow safe ingress and egress of the

Barge, equipment and personnel without incurring damage or injury when transiting.

3.1.4 The storage facility shall be adequately lighted with electric lights needed to perform inspection and testing required.

3.1.5 Storage facility shall be outfitted with, but not limited to, fresh water and electrical outlets as necessary to perform maintenance, inspection and testing required.

3.1.6 The storage facility shall have a centralized fire alarm system that is constantly monitored either by remote or onsite means. A fire hose station and at least two portable fire extinguishers with a minimum size of 6 kilogram should be within an accessible distance.

3.2 Dry Berthing Plan: Submit a plan in English, within 5 days of contract award to the COR to safely dry berth the boat within the Storage Facility inspected in 3.1.

“Checkpoint – Dry Berth of the Boat in Storage Facility”

3.3 Accomplish the dry berth of the boat, in accordance with COR approved plan submitted in 3.2. (See Note 4.1)

3.3.1 Contractor shall provide, set, and align material used to dry berth the boat to ensure that propellers, rudders, and other equipment on the surface of or protruding from the hull will not be damaged.

3.3.2 Docking Report: Submit a report showing the arrangement of the blocks being used to support the boat to the COR.

4. NOTES:

4.1 Notify the COR at least 4 hours ahead of check points and inspection required by the Government.

4.2 Facilitate scheduled access for Government and Government authorized Contractors to survey the boat, during the storage period.

-------------------------------------------------- End of Statement of Work --------------------------------------------------

File details come from the government source that posted it. Updated .