Statement of Work BLDG32 Paint Hallways and Door frames-Final.docx

DOCX document 378 KB Posted

Attached to
Repaint Interior Walls & Doorways USDA Building #32 Federal contract opportunity
Solicitation number
12405B24Q0329
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery

About this file

This document is a Statement of Work for the repainting of interior walls, hallways, and door frames in USDA Building #32 located in Tifton, Georgia. The key details are:

The objective is to repaint the hallways, hallway-facing door frames and doors in the Corn Genetics Lab of USDA Building 32. The contractor must be registered in the System for Award Management (SAM) prior to submitting a bid. Bidders are encouraged to conduct a site visit to observe the existing conditions before submitting a quote. The base bid includes repairing any wall damage, providing and installing two coats of satin paint in the hallway, and two coats of semi-gloss paint on the door frames, doors, and baseboards. Bid options include providing quotes for painting the walls and trim in the office and lab areas. The project is expected to be completed within 30 days of the notice to proceed. The solicitation is being conducted as a Total Small Business Set-Aside under NAICS code 238320 with a $19.0M size standard.

View the file

Other files for this federal contract opportunity

Other files attached to Repaint Interior Walls & Doorways USDA Building #32, newest first.
File Type Posted
AMENDMENT 0002 SOLICITATION 12405B24Q0329.pdf PDF
AMENDMENT 0001 SOLICITATION 12405B24Q0329.pdf PDF
Hallway Picture Solicitation 12405B24Q0329.pdf PDF
Wage Grade Determination DBA WD GA20230102 Tift County Georgia Solicitation 12405B24Q0329.pdf PDF
SOLICITATION 12405B24Q0329.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Interior Wall & Doorway paint USDA Building #32 Asset ID # 66020032

USDA-ARS

Tifton, Georgia

Prepared by:

Lee Willis, Facilities Maintenance Mechanic 26 March 2024

Table of Contents

Location MapPage 3
Statement of WorkPage 4
Contractor ResponsibilityPage 5
Project Schedule/ContactsPages 6-7

Location Map Site Address: 2773 Davis Road. Tifton, Georgia 31793

Statement of Work: Repaint hallways in Corn Genetics Lab

Project Objective: The objective of this project is to repaint hallways, hallway facing door frames and doors in Corn Genetics Lab USDA Building 32 at 2773 Davis Road, Tifton, GA 31793.

Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid.

Registration can be obtained through:

https://www.sam.gov Site Visit: Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable. This project is located at USDA-ARS in Tifton, Georgia.

To schedule a site visit: Contact IN ADVANCE, LEE WILLIS at (229)387-2370 or lee.willis@usda.gov between 8:00 a.m. – 3:30 p.m. Eastern Time, Monday – Friday.

Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 7 days of contract award. The Plan shall include phone numbers and maps to the local Dr. Office and nearest Hospital.

All employees of the general contractor or subcontractors shall have the 10- hour OSHA certified Construction Safety course and/or other relevant competency training. Supervisors shall have completed the 30-hour OSHA training.

Base Bid: Provide all equipment, labor, and materials necessary (including dumpster/container if applicable) to:

· Provide all quotes as turn-key completed work.

· Work shall be accomplished in accordance with all local, state and federal codes and regulations.

· Repair any wall areas found with cracks or holes/ divets in drywall

· Provide and install 2 coats of satin paint in hallway (color to be determined after job award)

· Provide and install 2 coats of Kilz on hallway door frames, doors and baseboards

· Provide and install 2 coats of semi gloss paint on hallway door frames, doors and baseboards (color to be determined after job award).

Bid Option:

· Provide additional quote for painting walls and trim in office areas (same colors as hallway determined after award)

· Provide additional quote for painting walls and trim in lab areas (same colors as hallway determined after award)

All proposals shall be in unlocked MS Word format and all cost proposals shall be detailed and presented in unlocked MS Excel format with formulas working.

Contractor Responsibility:

1. Contractor will verify all dimensions and site conditions prior to beginning work.

2. Contractor will perform the work as listed in the above outlined Base Bid.

3. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.

4. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.

5. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.

6. Contractor must always have a Site Supervisor on the job while working on this project.

7. Contractor will provide their own restroom facility and dumpster.

8. Contractor will remove all demolished material and debris from the worksite and dispose off-site.

9. The Contractor shall confine all operations on Government premises to areas authorized or approved by the Contracting Specialist/Officer or Representative (CO/COR).

10. Employees of general contractor and subcontractors shall comply with ARS security management program, obtain permission from the CO/COR, be identified by project and employer by wearing contractor issued identification badges (if required) at all times on ARS property, and restricted from unauthorized access.

11. The Contractor shall hold and save the Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

Material / Submittals:

The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted to the Contract Specialist/Officer (CO) and Contracting Officer Representative (COR) as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.

Demolition Procedure:

1. Contractor will verify all dimensions and site conditions prior to beginning work.

2. Contractor will schedule the work between working hours as listed below.

3. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor.

4. The contractor shall always be responsible for protecting their work and ensuring the safety of their crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.

5. All items demolished shall become property of the Contractor and be removed by Contractor from ARS property.

6. Contractor shall follow all ARS EMS disposal criteria. Recyclable materials shall be recycled, and the savings shall be included in the contractor’s quote, therefore passed on to the government.

7. Contractor shall be responsible for providing disposal records where applicable.

Damage to Property:

Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.

Inspection and Acceptance:

A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.

Project Schedule:

The completion of this project shall not exceed 30 days from date of Notice to Proceed. A request for time extension must be submitted to the Contracting Specialist/Officer in writing. Each request must include specific and detailed reasons in support of the schedule alteration.

ARS reserves the right to close down or shut down the project site and order the Contractor’s employees off the premises in the event of a national emergency or Government shutdown. The Contractor may return to the site only with the written approval of the CO/COR

Work Hours:

Contractor’s working hours shall be scheduled to coincide with the working hours of the Tifton location which are 8 a.m. to 4:30 p.m. Should it be necessary to work hours other than the regular working hours, the contractor shall arrange for access to the area with the CO/COR three days prior to the need.

Project Contacts:

Mr. Nathanael Flader-Administrative Officer (AO) USDA, ARS Location Support Staff 2316 Rainwater Road Tifton, Georgia 31793 Phone: 229-375-4812 Email: Nathanael.flader@usda.gov

Dr. Corley Holbrooke, Location Coordinator USDA, ARS Crop Genetics Research Unit 2316 Rainwater Road Tifton, Georgia 31793 Phone: 229-386-3664 (Office) Email: corley.holbrooke@usda.gov

Mr. Lee Willis (COR) USDA, ARS Facilities Maintenance Mechanic 2316 Rainwater Road Tifton, Georgia 31793 Phone: (229) 392-6747 Email: lee.willis@usda.gov

Monte Jordan Contract Specialist (CS) USDA, ARS, Southeast Area Administrative Office Acquisitions, Personal Property & Fleet Management Phone: (662)686-5361 Email: monte.jordan@usda.gov image1.png image2.jpeg image3.jpeg