Statement Of Work- Bladder Scanners for RMR.docx
DOCX document 25 KB Posted
- Solicitation number
- 36C25924Q0568
About this file
This document is a Statement of Work (SOW) for the procurement of three (3) Verathon Prime Plus bladder scanners and associated equipment, including printers and carts, to support the activation of two Community Based Outpatient Clinics (CBOCs) operated by the Department of Veterans Affairs, Eastern Colorado HealthCare System, Rocky Mountain Regional VA Medical Center (RMRVAMC). The requirement is seeking a brand name or equal, with specific salient characteristics outlined, such as the ability to enhance edge off-center with scan alerts, have a pubic bone interference indicator, one-step automated volume results, and adaptability to male, female, and pediatric patient types. The delivery timeline is within 30 days of award, with the items to be delivered to the RMRVAMC in Aurora, Colorado, during standard business hours, excluding federal holidays. The contract is a Firm-Fixed Contract, and the delivery date is no later than October 31, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924Q0568.docx | DOCX document | |
| Combine Synopsis - Bladder Scanners for RMR.docx | DOCX document | |
| FAR 52.225-6 Trade Agreements Certificate.docx | DOCX document | |
| VAAR 852.219-76 VA Notice of Limitations on Subcontracting.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Eastern Colorado HealthCare System Rocky Mountain Regional VA Medical Center
1. Purpose:
1.1 The Department of Veterans Affairs, Eastern Colorado HealthCare System, Rocky Mountain Regional VA Medical Center (RMRVAMC) is requesting a Firm-Fixed Contract for the delivery of three (3) Verathon Prime Plus bladder scanners with associated printers and carts. This acquisition is in support of the activation of two (2) Community Based Outpatient Clinics (CBOCs), Lt. Col. John W. Mosley VA Clinic (Aurora) and Castle Rock Outpatient Clinic. The Aurora Mosely Clinic Activation will utilize (2) units and the Castle Rock Clinic Activation will utilize (1) unit. This requirement is seeking a brand name or equal.
2. Nomenclature and Part Numbers:
| CLIN |
| Part Number |
| Nomenclature |
| Unit of Measure |
| Quantity |
| 0001 |
| 0800-0532 or equal |
| BladderScan Mobile Cart |
| EA |
| 3 |
| 0002 |
| 0270-0870 or equal |
| BladderScan Prime Plus |
| EA |
| 3 |
| 0003 |
| 0270-0868 or equal |
| BladderScan Prime Printer |
| EA |
| 3 |
3. Salient Characteristics
· Bladder scanner shall be able to enhance edge off-center with scan alerts.
· Must have pubic bone interference indicator.
· Must have one-step automated volume results.
· Must be able to automatically adapts to males, female, and pediatric patient types.
· Mut have real time bladder auto-location.
· Bladder Volume Range of 0 – 999 mL.
· Accuracy: under 100 mL: +/- 7 mL / >100 mL +/-7.5%.
· Probe with 6-foot cable.
· Probe must be completely sealed to protective sensitive electronics.
· Must be industrial-strength, probe cables and interconnects.
· Power Source: Rechargeable Lithium-Ion Battery with use time of 24 at least hours.
· Must include mobile cart.
· Must include printer.
4. Delivery:
4.1 Delivery will be made within 30 days of award unless specified differently within the scope of the contract.
4.2 Contractor shall deliver all equipment and supplies to the following address:
VA Medical Center (Station 554) 1700 North Wheeling Street Aurora, CO 80045
4.3 Delivery Hours of Operation: Monday – Friday; 0700hrs – 1500hrs; excluding all Federal Holidays and any other day specifically declared a National Holiday by the President of the United States.
· New Year’s Day
· Dr. Martin Luther King Jr’s Birthday
· Presidents’ Day
· Memorial Day
· Independence Day
· Labor Day
· Columbus Day
· Veteran’s Day
· Thanksgiving Day
· Christmas Day
4.4 When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday by US Government Agencies.
4.5 Delivery Point of Contact: Marcie Chase-Gonzalez and Leslie Miller
4.6 Delivery Markings: Contractor shall deliver items in manufacturer's original sealed containers with manufacturer’s name marked thereon. Deliveries shall be marked with the following information:
· Purchase Order Number
· Contract Number
· Mark For Attention: Marcie Chase-Gonzalez and Leslie Miller
4.7 Delivery Schedule: Items shall be delivered no later than October 31, 2024.
5. Operation and Maintenance Deliverables:
5.1 Operation and Maintenance Manuals:
5.2 Binders and Digital Copies for all equipment specified in this statement of need.
5.3 Deliver compilation of all manufacturer recommended maintenance schedule and operation materials packaged in binder (s) to the POC as specified in this statement of need.
6. Security Requirements:
6.1 Security background checks are not required.
6.2 The Contractor will not have access to VA Desktop computers they will not have access to online resources belonging to the government.
6.3 The Contractor will not have access to protected Patient Health Information (PHI), nor will they have capability of accessing patient information during the services provided to the VA and if removal of equipment from the VA is required; any memory storage device will remain in VA control and will not be removed from VA custody. All research data available for Contractor analysis is de-identified.
6.4 The C&A Requirements do not apply.
6.5 The Security Accreditation Package is not required.
File details come from the government source that posted it. Updated .