WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014
STATEMENT OF WORK
1.0 Background
The work included in this solicitation consists of subsurface explorations at a parking lot and access road at the Buffalo Bill Dam Visitor Center on U.S. Highway 16/20, the Cody to Yellowstone Highway, approximately 6 miles west of Cody, Wyoming.
The Visitor Center parking lot and access road are reportedly composed of uncontrolled material from tunnel and road cut excavation spoils wasted/dumped during widening of U.S. Highway 16/20 and construction of the Shoshone Canyon Tunnel. The tunnel and road cut were excavated using drill and blast methods through various rock types, mapped as dolomite, dolomitic limestone, shale, limestone conglomerate, and granite. The rocks exposed in the road cut are also locally intersected by a fault.
The character of the uncontrolled fill comprising the Visitor Center parking lot and access road is unknown. However, based on available construction photographs, it is anticipated to contain clay or silt to boulder-sized materials (soil and rock) that was dumped and wasted over the original reservoir shoreline. Portions of the fill may have been placed on unconsolidated colluvial deposits of variable character, potentially containing boulders. During the 1980’s Buffalo Bill Dam construction modification project, the Visitor Center Parking Lot was used as contractor staging area and a haul road, and additional fill materials were added. Following the dam modification, the staging area and haul road were paved with asphalt to create the Visitor Center parking lot and access road to the Visitor Center and dam.
Shortly after the dam modification project, tension cracks in the asphalt and sloughing of the shoreline slope was observed, indicating fill slope movements. Repairs were made in the 1990s including the addition of slope revetment and replacement of the damaged asphalt pavement.
Similar movement and pavement cracking have been noted in recent years.
2.0 Scope
The work to be completed under this contract includes providing a geotechnical data report which will be comprised of data from five exploratory drill holes, soil and bedrock sampling, laboratory testing and inclinometer casing installations in two of the drill holes. The details of specific tasks and deliverables are discussed in the following sections. The intent of the work is to provide the government with data to characterize the subsurface conditions at the Visitor Center parking lot and access road. Geotechnical interpretations or recommendations are not part of the scope.
3.0 Objectives
The purpose of this work is to provide subsurface data for planning and design of potential repairs to the parking lot and access road. Primary objectives of the work are to collect and report subsurface data to identify the depth to bedrock beneath the parking lot and access road, characterize the uncontrolled fill material, and install inclinometer casings for future monitoring (by the government) of the fill movement.
4.0 Tasks
The scope of work includes:
1. One-call utility clearances for drill hole locations.
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014
2. Kickoff meeting to discuss schedule, roles and responsibilities, drilling and sampling methods, and drill hole completion methods.
3. Establish a temporary perimeter restricting public access to active work areas.
a. Safety barriers with Caution tape (or equivalent) is sufficient.
b. Maintain at least two (2) Caution/Stay Out signs at the perimeter of the active work area.
4. Complete five (5) Drill Holes at designated locations (see Figure 1 and Table 1 for tentative drill hole locations, to be confirmed by the designated Government Representative prior to drilling)
a. Five (5) drill holes with anticipated total linear footage of 180 feet. Maximum individual drill hole depth anticipated is 50 feet.
b. Completion of two (2) of the five (5) previously drilled holes as inclinometers with grouted casing and lockable steel flush-mounted surface cover.
c. Perform a maximum of 20 total Standard Penetration Tests (SPTs), including a maximum of four (4) SPTs per drill hole, in overburden materials within the upper 20 feet of each drill hole.
d. Collect bulk soil samples, as appropriate using the selected drilling method.
e. Identify the depth to top of bedrock at each investigation location.
f. Advance an additional ten (10) feet into bedrock using rock coring methods to collect HQ or HQ3 diameter rock core samples. The intent of rock core sampling is to confirm that bedrock has been encountered, as opposed to boulders.
5. Laboratory Testing
a. Eight (8) each of the following laboratory tests, as possible and appropriate given the recovered soil samples: gradations using U.S. Standard sieve sizes, Atterberg Limits, and moisture content. Contractor shall coordinate with the designated Government Representative to identify which SPT (or bulk) samples are to be laboratory tested.
6. Delivery of rock core boxes and soil samples (not selected for testing) to the Bureau of Reclamation’s Big Horn Basin field office located just downstream of Buffalo Bill Dam in Cody, WY (see address in Section 5.0). (RSN 4.1.4 and RSN 4.1.5)
7. Geologic Data Report
a. Development of a Draft (RSN 5.1.1) and a Final Geologic Data Report (RSN 5.1.2) including description of exploration methods, geologic logs of explorations, photographs of recovered samples, laboratory test results, and other collected data.
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014
Figure 1 – Drill Hole Location Map Table 1 – Drill Hole Locations and Estimated Depths
Drill Hole No.
Latitude Longitude Estimated Drill Hole Depth (ft)
Completion
DH-01 44° 30.032’N 109° 11.299’W 35 Inclinometer
DH-02 44° 30.029’N 109° 11.255’W 40 Backfill
DH-03 44° 30.036’N 109° 11.277’W 15 Backfill
DH-04 44° 30.063’N 109° 11.201’W 50 Inclinometer
DH-05 44° 30.038’N 109° 11.353’W 40 Backfill
Total Depth 180
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014
4.1. Work Requirements
The Contractor shall provide all labor, equipment, materials, etc., required to accomplish the work specified.
Within ten (10) days of contract award, the Contractor shall hold a kickoff meeting including Contractor and Government representatives via teleconference to discuss the project schedule, communication plan, Government contact roles and responsibilities, review of the contract scope of work, proposed drilling and sampling methods and locations, and drill hole completion methods.
After the kickoff meeting with Government representatives and prior to commencing drilling work, the contractor shall mark the drill hole locations confirmed by the Government, submit the one-call ticket, and coordinate as required to clear all utilities located within 50 feet of each drill hole location.
The parking lot will be open for public use during the drilling work. Prior to the start of drilling, the Contractor shall establish a perimeter around the work area with the aid of a Government representative, as discussed in Section 6.0. The Contractor is responsible for the barriers and signage to restrict public access. The perimeter shall be marked with Caution tape (or equivalent). Two Caution/Stay Out signs (or equivalent) shall be erected at each side of the perimeter to notify vehicles and people to avoid the active work areas.
The Contractor shall locate each completed drill hole using a hand-held GPS device with at least 3-feet horizontal accuracy.
4.1.1. Drill Holes
The Contractor shall drill five (5) vertical drill holes at locations shown on Figure 1 and listed in Table 1, to be confirmed by the designated Government Representative prior to drilling. Drilling method(s) selected by the Contractor shall accommodate the completion of SPTs according to ASTM D1586 in the upper 20 feet of each drill hole, above the bedrock. In two (2) drill holes, drilling methods shall facilitate the installation of 70 mm (2.75 inch) O.D. grooved inclinometer casing. Drilling methods shall include HQ or HQ3 size rock coring to sample 10 feet of bedrock at the terminus of each drill hole. The primary intent of rock coring is to confirm the location of the top of bedrock contact, as opposed to boulders, in each drill hole.
The Contractor shall advance drill holes in order starting with DH-1, then DH-2, then DH-4, then DH-3, and then DH-5. The Contractor shall advance each hole to the top of bedrock using the selected drilling method(s) and then an additional 10 feet into bedrock using HQ or HQ3 rock coring methods. The Contractor shall terminate each drill hole at 10 feet below the top of bedrock, unless otherwise directed by the designated Government Representative. Anticipated drill hole total depths are shown in Table 1. It is possible that some drill holes will be shallower/deeper than what is listed in Table 1. The Contractor shall notify the Quality Assurance Evaluator (QAE) and the designated Government Representative if total depths of each or any drill hole exceeds depths listed in Table 1. Government Representative will approve all drill hole depths in the
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014 field during construction. The subsequent drill hole depths may be adjusted by the Government Representative so long as the total drill hole length does not exceed 180 feet. The Contractor shall not drill more than 180 total linear feet unless otherwise directed by the QAE.
As part of the drilling activities, the Contractor shall advance drill holes through approximately 3 inches of asphalt pavement (core or saw cut and patch), approximately 6 inches of road base materials, uncontrolled fill material that reportedly consists of tunnel and road cut excavation spoils dumped/wasted at the location of the parking lot and access road, potential underlying colluvium or residuum, and underlying bedrock. The uncontrolled fill material is likely to range from clay or silt to boulder-sized materials (soil and rock) and may include a minor amount of organic material.
The Contractor shall conduct a maximum total of 20 SPTs according to ATSM D1586, including a maximum of four (4) SPTs per drill hole. The Contractor shall attempt to conduct a SPT at intervals of each 5 feet of depth; one SPT between 0 to 5 feet, 5 to 10 feet, 10 to 15 feet, and 15 to 20 feet from the top of the asphalt surface. The Contractor should try to avoid advancing SPTs where cobble and boulder-sized material or bedrock is expected to result in immediate refusal or damaging of the sampling equipment. The Contractor shall use an automatic hammer to conduct SPTs. Refusal shall be at 50 blows within a six-inch-test interval or 10 consecutive blows with no advancement. SPT samples shall be logged and processed as specified in Section 4.1.3.
The Contractor shall switch to HQ or HQ3 diameter rock coring methods at the top of bedrock. The Contractor shall advance rock core drilling and collect HQ or HQ3 diameter rock core samples to a minimum depth of 10 feet below the top of bedrock. The intent of rock coring is to confirm that bedrock has been encountered in each drill hole, as opposed to boulders. All rock core samples collected shall be logged as specified in Section 4.1.3 and stored in core boxes purpose-built for HQ or HQ3 diameter rock core samples.
4.1.2. Inclinometer Casing Installation and Drill Hole Completion The Contractor shall install 70 mm (2.75 inch) O.D. grooved inclinometer casing in two (2) drill holes, DH-1 and DH-4, unless otherwise directed by the Government. The Contractor shall install inclinometer casing that is Durham Geo Slope Indicator (DGSI) or GEOKON standard 70 mm inclinometer casing, or equivalent. The casing shall have locking watertight joints. The Contractor shall furnish enough casing onsite for the expected drill hole depths, end caps for the terminal end, and caps to seal the top of the inclinometer casing. (RSN 4.1.1) The Contractor shall install the casing starting at the base of each drill hole according to ASTM D6230 and the inclinometer casing manufacturer’s installation specifications. (RSN 4.1.2) The Contractor shall align one set of grooves perpendicular to the shoreline and the orientation shall be documented in the drill log. The Contractor shall not allow the inclinometer casing to rotate or twist during installation but shall maintain vertical alignment of the casing grooves.
The Contractor shall use a grout mix proportioned and batched in accordance with the inclinometer casing manufacturer’s specifications, and placed with tremie
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014 methods starting at the bottom of the drill hole and grout the annulus between the drill hole wall and inclinometer casing. The Contractor shall not allow the inclinometer casing to move vertically or undergo vertical compression from buoyancy uplift during the completion of the inclinometers. The Contractor shall insert a dummy cart or inclinometer probe to ensure the casing groves do not have an offset and that the casing joints are intact before completion. The Contractor shall cut the top of the inclinometer casing to allow enough room for the inclinometer cap to be secured and to allow the steel casing cover to be installed and remove any burs.
The Contractor shall protect each inclinometer with a 1-foot-diameter, flush-mounted DOT-approved steel casing and cover. (RSN 4.1.3) The Contractor shall secure the steel casing with a small concrete pad constructed between the outside of steel casing and the asphalt surface. The concrete pad shall be sloped away from the steel casing to prevent storm water runoff collecting in the steel casing.
The Contractor shall backfill all drill holes that are not completed as inclinometers with bentonite or grout from about 2 feet from the top of the asphalt surface to the total depth of the drill hole, according to applicable state and federal regulations. The Contractor shall use cuttings or road base type materials to backfill the drill holes from about 4 inches from the top of the asphalt surface to 2 feet of depth. The Contractor shall place and compact cold patch material to repair damage to the asphalt caused during drilling. The Contractor shall dispose of drill cuttings not sampled or used for backfill, and drilling fluids at an off-site location.
4.1.3. Required Data Collection
An experienced and qualified geologist or engineer, as specified in Section 11.0 (RSN 11.0.1; RSN 11.0.2), Key Personnel Qualifications, shall be onsite to monitor all work and shall be responsible to collect data during the drilling, SPTs, soil and rock classification, sample preservation, completion of the inclinometers, and backfill of the drill holes. The experienced and qualified geologist or engineer (qualified Contractor representative) will collect geologic and drilling data to develop geologic logs for each drill hole.
During SPTs, the qualified Contractor representative will record blows per each 6-inch SPT depth interval. The qualified Contractor representative shall photograph the soil while it is still in the separated SPT split-barrel sampler. The qualified Contractor representative shall log each SPT sample according to Unified Soil Classification System (USCS) visual-manual classification methods specified by ASTM D2488. Minimum soil classification data requirements for documentation in geologic logs are specified in Section 4.1.4. The Contractor shall preserve each SPT sample for potential laboratory testing within two plastic sealable bags and labeled with the following data: project name, drill hole number, date collected, sample depth, last name of qualified Contractor representative. The Contractor shall not allow SPT samples to freeze or be subjected to excessive heat. Eight (8) SPT samples will be selected and submitted to a laboratory as specified in 4.1.6. The qualified Contractor representative will coordinate the selection and submittal of the laboratory samples with the
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014 designated Government Representative prior to testing. The Contractor shall deliver or ship the remainder of the SPT samples not selected for laboratory testing to the Bureau of Reclamation, Big Horn Basin Field Office, located just downstream of Buffalo Bill Dam (see address in Section 5.0). (RSN 4.1.4) The qualified Contractor representative shall document the depth to the top of bedrock. The qualified representative shall log the rock core samples collected during HQ or HQ3 rock coring methods. Minimum rock classification data requirements for documentation in geologic logs are specified in Section 4.1.4.
The qualified Contractor representative shall photograph the rock core samples within the split-barrel sampler before removal for preservation within a core box.
The Contractor shall preserve all rock core samples in purpose-built HQ-diameter core boxes and label each box with the following: drill hole name, box number, sample depths, with marking within each box that specify top and bottom depths for core samples preserved per run. At the conclusion of the drilling program, the Contractor shall deliver or ship all core boxes to Bureau of Reclamation, Big Horn Basin Field Office (see address in Section 5.0). (RSN 4.1.5) The qualified Contractor representative shall document the depth to groundwater if groundwater is encountered and identifiable using the selected drilling method.
4.1.4. Geologic Log Requirement
The qualified Contractor representative shall develop geologic logs that contain the following information at a minimum: drill hole name, dates of drilling, completion details, drill hole GPS measured location and elevation data, field staff, drilling methods, drilling conditions, occurrence of groundwater and date encountered, geologic symbol, Unified Soil Classification System (USCS) soil classification with a general description for cuttings and a specific visual-manual classification for each SPT sample interval, sample recovery, laboratory data included for each sample tested, and notes. The qualified Contractor representative shall provide notes in the logs including: percentage of fines, sand, gravel, cobbles and boulders; fines characterization of plasticity, toughness, dry strength and dilatancy; maximum particle size; color; moisture; reaction to HCl acid; consistency; duration of drilling time for each interval of drilling; ease or difficulty of drilling; and other pertinent information. For rock core logging, the qualified Contractor representative shall provide a description of bedrock materials including: type of rock, grain-size, sample recovery, Rock Quality Designation (RQD), color, and depth and dip angles of individual bedding planes and factures; measure dip angles from horizontal (perpendicular to the core axis).
The qualified Contractor representative shall include drill hole completion information with depths referenced from the top of the asphalt adjacent each drill hole in the geologic logs. In the logs for drill holes completed as inclinometers, the qualified Contractor representative shall include: depth of the bottom of the inclinometer casing, depth of the top of inclinometer casing, bearing for inclinometer grooves aligned perpendicular to shoreline, description of tremie grout methods, volume of grout used, depth of backfill materials used near the ground surface, description of the steel casing installation and asphalt repair at the ground surface. In the logs for drill holes not completed as inclinometers, the
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014 qualified Contractor representative shall include: the depths for backfill materials used, volume of backfill materials used, description of materials used to repair to the asphalt.
The qualified Contractor representative shall include the depth of groundwater and date encountered in the log, if groundwater is encountered during drilling and can be identified using the selected drilling method.
The qualified Contractor representative shall document within the log the following: depths of any suspected voids, unique losses of drill fluids, organic materials or other wasted materials.
4.1.5. Photographs
The Contractor shall document work activities with photographs and include photographs specified below in the Geologic Data Report. The Contractor shall annotate each photograph in the report with the following information (as applicable): project name, drill hole name, feature of interest (example: SPT Sample #2), depth of sample, photographer, and date.
The Contractor shall photograph each drill hole work site before work starts, and after completion of the inclinometers and asphalt repairs.
The Contractor shall photograph each SPT sample with the soil sample still in the separated SPT split-barrel sampler.
The Contractor shall photograph each rock core sample with the rock core sample still in the separated split-barrel HQ or HQ3 sampler, as well as each core box with complete rock core samples.
4.1.6. Lab Testing
A total of eight (8) SPT samples will be selected and submitted by the qualified representative for laboratory tests. At least one (1) and no more than three (3) samples from each drill hole will be selected and submitted for laboratory testing, if possible, depending on recovery and sample variability. The qualified Contractor representative shall coordinate the selection and submittal of the laboratory samples with the designated Government Representative prior to testing.
Selected samples will be submitted for the following laboratory tests:
• Gradations using U.S. Standard Sieve sizes per ASTM D6913 and D7928
• Moisture Content per ASTM D2216
• Atterberg limits per ASTM D4318 for selected samples, unless they are judged to be non-plastic based on the visual-manual classification
The Contractor shall include laboratory data in the Geologic Data Report with the following specific data required: gradation plots; percentages of clay, silt, sand, and gravel; liquid limit; plastic limit; moisture content and Unified Soil Classification System name and symbol according to ASTM D2487.
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014
5.0 Delivery
5.1. Geologic Data Report
The Contractor shall provide a Draft (RSN 5.1.1) and a Final Geologic Data Report (RSN 5.1.2) that shall include the information listed below. Draft drill hole logs shall be submitted within 10 calendar days of completing the field work and no later than January 11, 2021. (RSN 5.1.3). A complete Draft report shall be submitted 45 calendar days from completion of the field work. The Government will have 10 calendar days to complete a review of the Draft report and provide comments. The Contractor shall have 15 calendar days after receiving Government review comments, to submit the Final Geologic Data Report.
The Contractor shall include the following in the Geologic Data Report:
• Narrative summation of work and methods
• Geologic logs
• Photographs of SPT samples, rock core samples, equipment used, and the surface completion for all drill holes
• Inclinometer installation details
• Laboratory testing data The Contractor shall deliver the Draft and Final Geologic Data Reports in digital format (PDF) via email or other transmittal method, as well as one (1) hard printed copy delivered or mailed, to the QAE and receive email confirmation of the receipt of the document.
5.2. Soil and Rock Samples
The Contractor shall deliver the soil and rock samples described in preceding sections prior to submittal of the Final Geologic Data Report to the Bureau of Reclamation, Big Horn Basin Field Office located just downstream of Buffalo Bill Dam at the following address:
4 Reclamation Road Cody, Wyoming 82414
The Contractor shall coordinate delivery of the soil and rock samples with a designated Government representative, who will receive the samples at that location or identify an alternate location for sample transfer.
6.0 SUBMITTALS
Submittals from the contractor are required during the term of the contract to ensure quality and safe work under the purchase order. Required submittals are as follows:
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014
RSN
Clause Or Section Title Submittals Required Due date or delivery time Responsible
Code
Send to:
CO QAE
1 Alternative Payment Protections
52.228-13
Payment Bond or Irrevocable Letter of Credit or Triparite Escrow Agreement
Within 10 calendar days after award
CO X
2 Insurance-Work on a Government Installation
1452.228-70
1) Written certification that the required insurance has been obtained
2) Current certification of insurance for each subcontractor
Before commencing onsite work
X
3 Liability Insurance 1452.228-70
Acceptable Certificate of Liability Insurance
Prior to commencement of work under the contract
CO X
4 Equal Opportunity 52.222-26
Information required by Executive Order
112246 (SF-100)
Within 30 days following award
CO X
5 Reporting Executive Compensation and First Tier Subcontract Awards
52.204-10
Certification that executive compensation and subcontract awards were reported
Within 10 days of each report being submitted
CO X
6 Site Security
GP-7 and WBR 1452.237-80
List of contractor and subcontractor employees
At least 10 days prior to arriving at worksite
QAE X X
7 Site Security
GP-7 and WBR 1452.237-80
List of vehicles and equipment to be brought onsite
At least 10 days prior to arriving at worksite
QAE X X
Section 4 – Work Requirements
RSN
4.1.1
4.1.2 Inclinometer Casing Installation and Drill Hole Completion
Product Data 7 days prior to installation
QAE X
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014
4.1.2
4.1.2 Inclinometer Casing Installation and Drill
Manufacturer’s Installation Instructions
Prior to installation QAE X
RSN
4.1.3
4.1.2 Inclinometer Casing Installation and Drill
Product Data 7 days prior to installation
QAE X
RSN
4.1.4
Section 4.1.3- Required Data Collection
Ship/deliver remaining SPT samples to BOR
At same time SPT samples are sent to laboratory
QAE Address listed in 5.2
RSN
4.1.5
Section 4.1.3- Required Data Collection
Ship/deliver core boxes to BOR
At conclusion of drilling program
QAE Address listed in 5.2
Section 5 – Geologic Investigation Report
RSN
5.1.1
Section 5.1- Geologic Investigation Report
Draft Geologic Investigation Report
45 days after completion of field work
QAE X
RSN
5.1.2
Section 5.1- Geologic Investigation Report
Final Geologic Investigation Report
15 calendar days after receiving Government review comments
QAE X
RSN
5.1.3
Section 5.1- Geologic Investigation Report
Draft drill hole logs Within 10 calendar days of completing the field work and no later than January 11, 2021.
QAE X
Section 11- Key Personnel Qualifications
RSN
11.0.1
Section 11 Onsite driller and drilling company qualifications
Included with proposal. This will be used to determine whether contractor is qualified.
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014
11.0.2
Section 11 Qualified Representative
Included with proposal. This will be used to determine whether contractor is qualified.
Physical addresses for:
Contracting Officer (CO): Bureau of Reclamation, Attention GP-5000, 2021 4th Avenue North, Billings, MT 59101.
Quality Assurance Evaluator (QAE): Bureau of Reclamation, Attention WY-6602, 705 Pendell Boulevard, Mills, WY 82644.
Submittals shall be submitted electronically. CO and QAE email addresses will be available once the Notice To Proceed has been issued.
Time required for review of submittals: Submittal review will require 28 days for review of each submittal or resubmittal, unless otherwise specified. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return email date.
No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.
7.0 Government-Furnished Property
Documentation for NEPA and cultural clearances for each drill hole will be furnished, as required.
A representative from Reclamation’s Big Horn Field Office will be onsite to aid in closing the parking lot area required for the work. The Government will remove snow from the parking lot and access road, as required, to allow access to the drilling locations. A representative from Reclamation’s Big Horn Field Office will accept delivery of the samples not selected for laboratory testing.
8.0 Security
The Contractor shall be responsible for restricting access to the work site, with the aid of a Government representative, as described in Section 4.1. The Contractor shall coordinate deliveries to the Reclamation facilities identified in Section 5.0 with a Government representative.
9.0 Place of Performance
The exploratory field work will be performed at the Buffalo Bill Dam Visitor Center parking lot and access road, off Highway 14/16, approximately 6 miles west of Cody, Wyoming. The remainder of the work will be performed at the Contractor’s facility. Deliveries will be made to locations as described in Section 5.0.
10.0 Period of Performance
The Contractor shall perform and complete all work within 90 calendar days of award of the contract and no later than July 30, 2021.
WY – BB Visitor Center Parking Lot Solicitation # 140R6021Q0014
11.0 Key Personnel Qualifications
The onsite driller and drilling company will have demonstrated experience and ability within the last 5 years to conduct SPTs with an automatic hammer according to ASTM D1586 (RSN 11.0.1).
The onsite driller and drilling company will have demonstrated experience and ability within the last 5 years to successfully install an inclinometer. (RSN 11.0.1) The onsite driller and drilling company will have demonstrated experience and ability with drilling into soils containing cobbles and boulders within the last 5 years to successfully complete drilling, SPTs, and installation of inclinometers. (RSN 11.0.1) The contractor’s qualified representative will have a minimum of a Bachelor’s degree in Geology, or Geotechnical or Civil Engineering. The qualified representative responsible for collecting field data will have demonstrated experience and expertise within the last 5 years necessary to conduct field test methods required for USCS visual classification, SPT, and collecting required data specified in the Work Requirements. The qualified representative will have the expertise necessary to characterize field engineering physical properties of bedrock. The qualified representative will have the expertise required to advise the driller on the appropriate method to obtain the best quality samples of soil and rock. (RSN 11.0.2)
12.0 Contractor-Furnished Equipment and Materials
The contractor shall provide all equipment and materials required to accomplish the work specified.
Materials:
• 100 feet --- 70 mm (2.75 inch) O.D. grooved inclinometer casing (DGSI, GEKON, or equivalent).
• Two (2) --- inclinometer casing anchors to resist buoyancy uplift of the inclinometer casing and hold the casing in tension
• Two (2) --- terminal end caps, compatible with 70 mm (2.75 inch) O.D. grooved inclinometer casing
• Two (2) --- compression caps to seal the top of the inclinometer casing, compatible with 70 mm (2.75 inch) O.D. grooved inclinometer casing
• Two (2) --- 1-foot-diameter, DOT-approved, lockable, flush-mounted, steel casing
• Ready mix concrete to secure steel casing
• Asphalt cold patch
• Grout for inclinometer installation
• Grout or bentonite for drill hole backfill
• Sample bags and core boxes
• Additional materials determined necessary by the Contractor to complete the work
| STATEMENT OF WORK |
| 1.0 Background |
| 2.0 Scope |
| 3.0 Objectives |
| 4.0 Tasks |
| 4.1. Work Requirements |
| 4.1.1. Drill Holes |
| 4.1.2. Inclinometer Casing Installation and Drill Hole Completion |
| 4.1.3. Required Data Collection |
| 4.1.4. Geologic Log Requirement |
| 4.1.5. Photographs |
| 4.1.6. Lab Testing |
| 5.0 Delivery |
| 5.1. Geologic Data Report |
| 5.2. Soil and Rock Samples |
| 6.0 SUBMITTALS |
| Section 11- Key Personnel Qualifications |
| 7.0 Government-Furnished Property |
| 8.0 Security |
| 9.0 Place of Performance |
| 10.0 Period of Performance |
| 11.0 Key Personnel Qualifications |
| 12.0 Contractor-Furnished Equipment and Materials |
File details come from the government source that posted it. Updated .